1 CITY OF COLD LAKE 2016 CAPITAL BUDGET The City of Cold Lake s 2016 Capital Budget demonstrates the commitment to a multi-year capital plan that depicts a strong community infrastructure investment. Once again, this is a significant achievement for the City, and a continued contribution to the long term community re-investment strategy. The capital budget outlines a balanced approach to infrastructure projects with a mix of various disciplines and initiatives. The 2016 Capital Budget consist a total of $45,470,700, with highlights including: Environmental/Utility Infrastructure Improvements $4,800,000 Roadway Infrastructure Improvements $8,442,200 Fleet and Equipment Infrastructure $1,425,000 IT Infrastructure $193,500 Facilities Infrastructure $28,375,000 Recreation Infrastructure $2,235,000 To develop a better understanding of the capital budget, here is a more detailed description of the projects in the various disciplines: Meadows Storm Water Trunk Extension ENVIRONMENTAL/UTILITY INFRASTRUCTURE IMPROVEMENTS (4,800,000) Meadows Storm Water Trunk Extension project is the second storm water issue that is restricting development in Cold Lake South. It will be necessary to deepen palm creek and complete a new storm line crossing Highway 28 at 55 Avenue. This new pipe will be approximately two (2) meters deeper than the existing elevations, which will service the Meadows and Brady Heights. This budget is to enhance the budget from It should be noted that the City of Cold Lake will have a future contributing share of the proposed parkway due to the existing development. Project Value = $2,500,000 (2015) $3,000,000 (2016) Cold Lake South Landfill Access Road Re-Alignment This existing Class 3 landfill, which is for demolition and inert materials only, has reached its capacity based on the current configuration. The City has gone to its maximum height and width in the current direction that landfill is occurring. The City of Cold Lake will be reconfiguring the landfill to extend its lifespan by the only alternative, which is to process all demolition and inert materials at the transfer station, and then haul them to an alternative landfill. This new configuration will require a re-alignment of the existing access road which will free up space at the landfill. Project Value = $500,000

2 Cold Lake South Landfill Scale House The City of Cold Lake currently process approximately 38,000 customers annually at the Cold Lake South Landfill and Transfer Station. A need exists to expand the scaling capacity to allow quicker processing for customers. This project will enable the City to purchase a second scale for the waste management facility. Project Value = $200,000 Waste Management Facility Enhancements In 2016, various service contracts will be maturing, and the City of Cold Lake will be researching alternative service delivery options for waste management and recycling initiatives. A budget has been established to control costs of the initiatives in the event that the alternative service delivery options need to be enabled. Project Value = $500,000 Inflow and Infiltration Study Sanitary sewer systems are designed to carry wastewater from toilets, dishwashers, sinks, and showers in homes or businesses. Inflow and infiltration (I and I), which is generally stormwater, surface flow runoff, and groundwater, enters into the sanitary sewer and increases the load on the systems. Stormwater should belong to stormwater sewers, on the surface of the ground, or drainage ditches. During dry weather, the impact of inflow and infiltration can vary significantly. This type of I and I is typically related to ground water infiltration such as cracked pipes, manholes, sump pumps, etc. Rain events or snow melts generally described as wet weather, magnifies existing inflow and infiltration sources. As a rain or snow melt event begins, the inflow and infiltration sources starts filling the sanitary sewer systems with water, and eventually filling the sewer systems to capacity and beyond. Once the sanitary sewer system is beyond capacity, water will flow backwards through the sanitary sewer pipes, flooding basements and households, and causing manholes to pop open, releasing wastewater onto the streets. This is a two (2) year project intended to quantify the I and I, and provide recommendations for improvements to reduce I and I in the City s sanitary sewer system. These recommendations will include potential policies and/or infrastructure improvements. Project Value = $600,000 - $300,000 (2015) and $200,000 (2016) Fire Hydrant Replacement Program Due to a significant backlog of work in the Utilities department, the City of Cold Lake will be utilizing contracted services for the replacement of several fire hydrants throughout the community. This is the second year of the proposed two (2) year program in an effort to replace approximately ten (10) hydrants per year. Project Value = $100,000

3 Water Meter Replacement Program (Wireless System) In 2012, utility companies converted to wireless meter reading systems, and terminated its contracts with the City of Cold Lake to provide manual meter reading services. As a result, the City began to convert its water meters to a wireless system in 2012, and all necessary back bone infrastructures and the first slate of meters were purchased then. The City of Cold Lake is in year three (3) of the conversion process. In 2014, the City of Cold Lake increased the funding from $150,000 to $300,000 in an effort to reduce the implementation time. Based on the proposed funding levels, the project should be completed by 2016 for all residential units that have metered rates. Project Value = $300, Annual Capital Street Improvement Program ROADWAY INFRASTRUCTURE IMPROVEMENTS ($8,442,200) This program is referred to as a road analytics program, which is a software that utilizes the surface distress index (SDI) of roadways and degradation curves to assist in making decisions on pavement overlays, which includes functional overlays and structural overlays, that extends the life of asphalt before the pavement requires total reconstruction, which is a much more expensive option. The SDI s are submitted to Alberta Transportation on an annual basis, which supports the annual Basic Municipal Transportation Grants (MSI BMTG-$1,031,140) funding for roadway projects. Subject to final tender results, the following are priorities for 2016: 16 Street (1 Avenue to 3 Avenue) 10 Street (5 Avenue to 6 Avenue) 51 Avenue (45 Street to 47 Street) 51 Avenue (41 Street to 43 Street) 41 Street (50 Avenue to 51 Avenue) 52 Avenue (55 Street to 57 Street) 3 Avenue (10 Street to 16 Street) Budget Pending 13 Street (6 Avenue to 8 Avenue)- Budget Pending Project Value = $1,750, Annual Commercial Lane Improvement Program This program is a new initiative that was implemented in 2012 by the City of Cold Lake in which annually two (2) to three (3) lanes in the commercial districts will be upgraded to an asphalt standard. This is the third year for the program. Subject to final tender results, the following are priorities for 2016: Lane Between 50 Avenue to 51 Avenue (52 Avenue to 53 Street) Lane east of North Star Elementary School Lane Between 7 Avenue and 8 Avenue (10 Street to 12 Street) Project Value = $400,000

4 2016 Annual Residential Lane Construction Program This program was an initiative that was implemented in 2014 by the City of Cold Lake in which annually two (2) to three (3) blocks of residential rear lanes were constructed to proper standards. Project Value = $200, Highway 28 Service Road Improvements Program This program is a new initiative that was implemented in 2013 by the City of Cold Lake in which annually two (2) blocks of service roads in the area will be upgraded to an asphalt standard. Subject to final tender results, the following are priorities for 2016: Highway 28 East Service Road (50 Avenue to 53 Avenue) Northstar Elementary School (West 1/2 Block) 34 Avenue (Highway 28 to Rona Access) Project Value = $800, Highway 28 South Enhancements (54 Avenue to 50 Avenue) With the adoption of the Highway 28 Master Plan, the City of Cold Lake is proposing to initiate improvements to the Highway and Cold Lake s busiest intersections. Pending the scope of the project, the construction may extend to Project Value = $4,000,000 Traffic Signalization (Highway 28 and Veteran s Drive) The traffic signalization infrastructure located at the intersection of Highway 28 and Veteran s Drive (50 Avenue) is at programming capacity and beyond its life cycle. The City of Cold Lake will be replacing the signalization infrastructure in conjunction with the Highway 28 improvements. Project Value = $400, Avenue Roadway Extension (Adjacent to the Cold Lake Mosque) The City of Cold Lake has still not reached an agreement for the development of 54 Avenue. That being said, the City of Cold Lake will move forward with the development of a portion of 54 Avenue that is situated adjacent to the Holy Cross Elementary School and the Cold Lake Mosque. More specifically, the City will complete the roadway improvements up to the property thresholds of the Cold Lake Mosque development site. Project Value = $250,000 Downtown Entry Feature The City of Cold Lake is proposing to replace the existing banner structure located on 50 Avenue when entering into the Cold Lake South commercial district. Not only is the existing structure not certified to hold a load, it also requires replacement for esthetic purposes. This project was a recommendation from Council s Economic Development Advisory Committee (EDAC). Project Value = $275,000

5 2016 Annual Trail Improvements and Sidewalk Connectivity Program The City of Cold Lake will continue with the annual trail improvements and sidewalk connectivity program. The program is indented to expand and connect trails such a millennium trail to subdivisions throughout the community. The program is also intended to install necessary sidewalks were needed throughout the community. Project Value = $200,000 Baywood Road Contribution to the Municipal District of Bonnyville During a joint Council meeting on January 8, 2014, the M.D. of Bonnyville expressed interest in reconstructing Baywood Road, and requested the City to contribute $1 million to the estimated $7 million project. In 2015, the M.D. of Bonnyville completed approximately 22% of the roadway, of which Council authorized the City to contribute $167,200 to the project. The City of Cold Lake will review any further contributions to the project in the future. Project Value = $167,200 FLEET AND EQUIPMENT INFRASTRUCTURE ($1,425,000) The City of Cold Lake has a fleet and equipment replacement program, some of the highlights include: Turf Maintenance Equipment Self-Contained Breathing Apparatus Light Fleet Vehicle Replacement Program Wheel Loader Tandems Heavy Equipment Snow Blower Other equipment that will be added to the City of Cold Lake s fleets to assist in enhanced service delivery will include: Community Event Trailer Mounted Bar-B-Q Energy Centre Christmas Tree Beach Sand Screener Community Event Trailer Mounted Stage Project Value = $1,425,000 Enhancement to Security Camera System IST INFRASTRUCTURE ($193,500) Surveillance and access controls are two of the main applications for security that every building requires to provide some form of security to protect property, content and personnel. There is a responsibility to provide traceable, reliable, and authentic surveillance images to secure City assets and

6 buildings, and to provide a safe work environment for staff by video surveillance of parking areas, exits, entrances, and restricted areas. The City of Cold Lake will be enhancing the surveillance to areas such as the Airport, Building 5, Public Works Yard, City Hall, the Splash Park, and Beach area. Project Value = $50,000 New Internet Service Provider (ISP) Gateway Energy Centre The City of Cold Lake will be providing enhanced access for the Energy Centre with WiFi Guest networks, video streaming internet demands, and a backup internet Disaster Recovery. The current system has a limited bandwidth that is causing bottlenecks. This project will provide a direct access from the Energy Centre to the fibre optic network. Project Value = $45,000 Video Solution Server Energy Centre The City will be implementing a Server and Application for delivering City sourced and commercially sourced visual content to different LCD/LED screens throughout the Energy Centre. This application may also provide some source of revenue via commercial content. Project Value = $28,500 Bellamy Financial Software Upgrade The City will be enhancing the Financial Software System Bellamy, which includes budgeting software that significantly reduces the time required to create, consolidate, and manage the municipal budget. Data is directly linked to the source general leger and asset management systems to improve accuracy. Analytics are woven throughout the various software modules that include multi-dimensional worksheet technology to support all cost and funding analysis. Project Value = $70,000 Cold Lake Energy Centre (Phase 3A) FACILITIES INFRASTRUCTURE ($28,375,000) The City of Cold Lake will be undergoing a significant expansion of the Cold Lake Energy Centre. Phase 3A will include the expansion for a second NHL ice rink with seating capacity up to 400 spectators, minimum of four (4) to five (5) dressing rooms, figure skating change room, referee change room, and various multipurpose, storage, and utility rooms. A new upper level spectator viewing lounge is to be located between the existing performance ice arena and the new second ice surface. The public concourse will be extended on the main and second levels to connect the new ice arena expansion to the existing building. Included with the ice arena expansion are public washrooms, offices, a passenger elevator, and a climbing wall. Project Value = $10,000,000 (2016) and ~$13,000,000 (2017)

7 Cold Lake Energy Centre (Phase 3B) Phase 3B will include a second fieldhouse adjacent to the existing field house. The new fieldhouse will include team change rooms, a referee change room, storage, and public washrooms. The existing field house is proposed to be re-purposed as a dedicated dance studio and gymnastics facility on the main level, with an expansion of the second floor space to accommodate multipurpose rooms, expanded public washrooms, and spectator viewing of the gymnastics floor space. Project Value = $6,000,000 (2016); ~$10,000,000 (2017) and ~$5,000,000 (2018) Cold Lake Energy Centre (Phase 3C) Phase 3C will include a second fieldhouse paired to Phase 3B with additional team change rooms, storage, washrooms, and building utility spaces. A second level expansion of the spectator viewing area will also be included. A suspended third floor running track will be situated above the two (2) new fieldhouses. Project Value = $6,000,000 (2016); ~$8,000,000 (2017) Energy Centre Secondary Access Road The City of Cold Lake will be developing a secondary access road to the Energy Centre to ensure ample traffic flow from the facility especially during peak usage such as concerts, hockey games or large venues. Project Value = $1,100,000 Artificial Turf Multi-Purpose Field and Grand Stand The City of Cold Lake will be developing an artificial turf field designed for Football, soccer, and Rugby, and a Grand Stand Project Value = $4,000,000 (2016); ~$2,000,000 (2017) Temporary Fire Hall Relocation Upon commissioning of the new Cold Lake South Fire Hall, the City of Cold Lake will relocate the temporary structure that was housing the firefighting apparatuses to the City of Cold Lake s Waste Management Facility for repurposing. The facility will be used for the City s waste management and recycling initiatives. Project Value = $250,000 Facility Demolitions (Grande Centre Hotel) The City of Cold Lake recently purchased the Grande Centre Hotel as part of its strategic land acquisitions program. Prior to demolition of the facility, asbestos abatement will be required in an effort to prepare the land for potential future development. Project Value = $300,000

8 Building #5 (Water Reservoir and Truck Fill Station) This facility has undergone significant overhaul infrastructural upgrades. The facility requires repairs to the roof and replacement of the façade in an effort to improve the building s esthetics and curb appeal with adjacent property. Project Value = $100,000 City Hall Parking Lot The rear parking lot for City Hall and the Cold Lake Library will be upgraded and paved. Project Value = $250,000 (2015) and $250,000 (2016) Marina Breakwater Repairs The existing Marina breakwater is experiencing damages that require significant repairs. These repairs include the following highlights: Review of structure damage, water circulation issues, and vegetation issues in the Marina; and Repair of breakwater structure that is used to access the breakwater walkway; The City of Cold Lake will be appealing the Government of Canada for the cost of the repairs to the Marina. Project Value = $200,000 Second Floor of the FCSS Facility The City of Cold Lake will move forward with the completion of the second floor of the new FCSS facility. Amongst other enhancements, the second floor will be designed and renovated to provide youth programming space. Project Value = $175,000 Annual Park Replacement Program RECREATION INFRASTRUCTURE ($2,235,000) This program was reinstated in 2015 in an effort to replace and enhance two (2) parks on an annual basis. Based on the budget, some parks were found to be somewhat smaller once the park was replaced. Now that all parks have been replaced throughout the community, this funding will provide enhancements to parks including structures, benches, garbage containers, etc. Project Value = $120,000 Tennis Courts The tennis courts located in Brady Heights and Lefebvre Heights have deteriorated significantly over the past several years. In their current state they are pretty much unusable. This funding is intended to

9 resurface the tennis courts. Due to the fact that the existing tennis courts located in Lefebvre Heights were not serviceable, a budget enhancement is required in 2016 to completely replace the existing asphalt and substructure. Project Value = $160,000 (2015) and $80,000 (2016) Imperial Park Baseball Dugouts The City of Cold Lake replaced (2) dugouts at the baseball diamonds in The City is proposing to install dugouts in two (2) additional fields utilizing the same design. Project Value = $175,000 Imperial Park Baseball Mobile Bleachers The City of Cold Lake will be purchase two (2) bleacher systems that have an approximate capacity of 100 seats for enhance viewing at the baseball diamonds. The bleacher system will be trailer mounted and hydraulically controlled for easy relocation for other special events. Project Value = $110,000 Kinosoo Beach Enhancements (Phase 2 Beaver Entry and Pathway) This funding will support the Phase 2 of the Kinosoo Beach Master Plan. Major components of phase 2 include: New park access from Tamarack; Light equipment access and trail systems that will facilitate vendor vehicles; and Trail systems connecting to the splash park. Project Value = $650,000 (2015) and $750,000 (2016) Kinosoo Beach Enhancements (Phase 3 Muskrat Entry and Pathway) This funding will support the Phase 3 of the Kinosoo Beach Master Plan. Major components of phase 3 include: New park access from 1 Avenue/18 Street (Muskrat Entry); Trail systems connecting to the splash park; and Return existing gravel area to a landscaped common area. Project Value = $650,000 Kinosoo Beach Parking Enhancements The City of Cold Lake will provide parking enhancements along Tamarack by expanding the roadway to provide angle parking. This project will likely have some impact on the existing trees that are located along the roadway. Attempts will be made to limit the impact on the trees in order to provide parking. Project Value = $350,000

Appendix 2. Capital Funding Source Summary Table of Contents

Appendix 2. Capital Funding Source Summary Table of Contents Capital Source Summary Table of Contents 2016 Corporate Services APP 2-3 Mayor and Council APP 2-5 Office of the Chief Administrative Officer APP 2-5 Office of the Chief Operating Officer APP 2-5 Planning

More information

Traverse City Asset Management Plan

Traverse City Asset Management Plan Utilities and Public Services Larry LaCross, GISP, Asset Management/GIS Analyst Traverse City Department of Public Services Introduction About Traverse City (TC) TC Assets Department of Public Services

More information

2018 Capital Budget Presentation

2018 Capital Budget Presentation 2018 Capital Budget Presentation 2018 General Capital Budget Expenditures Asset Type 2018 Capital Projects Police 1,431,200 Fire 1,200,000 Finance 37,000 Transportation 8,231,900 Drainage 7,356,000 Parks

More information

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21 Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest

More information

Offsite Levy Overview

Offsite Levy Overview Offsite Levy Overview Presentation to Wheatland County W351 C04-00130 What is an offsite levy? A tool used by municipalities to pay for or recover capital costs incurred for infrastructure improvements

More information

2014 BOND PROGRAM UPDATE

2014 BOND PROGRAM UPDATE 2014 BOND PROGRAM UPDATE Presented to the City Council By the City Manager s Office August 11, 2015 1 Topics Previous Debt Programs 2014 Bond Program o Goals o Funding Commitments o Progress Communication

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

5 Servicing Capacity Assignment for Aurora, East Gwillimbury and Newmarket

5 Servicing Capacity Assignment for Aurora, East Gwillimbury and Newmarket Clause 5 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 28, 2018. 5 Servicing Capacity Assignment

More information

Village of Gowanda 2017/18 Budget. Village of Gowanda: March 28, 2017

Village of Gowanda 2017/18 Budget. Village of Gowanda: March 28, 2017 Village of Gowanda 2017/18 Budget Village of Gowanda: March 28, 2017 Police Department Public Works Department Highlights Projected Outlook Village of Gowanda, March 2017 Organizational Chart 2017-18 Officer

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

TOWN OF ARNPRIOR STRATEGIC PLAN AT A GLANCE ( )

TOWN OF ARNPRIOR STRATEGIC PLAN AT A GLANCE ( ) VISION 2019 1. Robust sustainable growth We have solid economic development and growth management strategies resulting in expanded commercial, retail activity and industrial base. Our Values LONG TERM

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: June 16, 2014 REPORT NO. PW2014-053 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works Commission

More information

City of Airdrie Capital Budget & Plan

City of Airdrie Capital Budget & Plan City of Airdrie 2019-2028 Capital Budget & Plan COMMUNITY INFRASTRUCTURE 2019-2028 Capital Budget & Plan Manager Building Operations/Waste & Recycle, Fleet Kathleen Muretti Building Operations Fleet Services

More information

Service Plan for Infrastructure Engineering

Service Plan for Infrastructure Engineering Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...

More information

COUNCIL REPORT. Item Meeting date: August 13, 2018 Engineering & Public Works

COUNCIL REPORT. Item Meeting date: August 13, 2018 Engineering & Public Works Item 7.3.5 Meeting date: August 13, 2018 Department: Prepared by: Reviewed by: SUBJECT: Engineering & Public Works COUNCIL REPORT George Elliott, P.Eng., Director of Engineering & Public Works Greg McClinchey,

More information

FY 12/13 Recommended Public Works Budget $4,472,871

FY 12/13 Recommended Public Works Budget $4,472,871 PUBLIC WORKS FY 12/13 Recommended Public Works Budget $4,472,871 Facilities Development 20% RSWA Contribution 8% General Services 72% FY 10/11 FY 11/12 FY 11/12 FY 12/13 FY 12/13 $ % DEPARTMENT ACTUAL

More information

Building Sustainable Communications Infrastructure for Municipal ITS. The City of Calgary ITS CANADA May 4, 2016

Building Sustainable Communications Infrastructure for Municipal ITS. The City of Calgary ITS CANADA May 4, 2016 1 Building Sustainable Communications Infrastructure for Municipal ITS The City of Calgary ITS CANADA May 4, 2016 Source: istockphoto.com 2 3 Connected Ecosystem Broadband or Internet Government Networks

More information

2015 Major Projects Work Program

2015 Major Projects Work Program 2015 Major Projects Work Program COMMUNITY SERVICES November 2015 Charter Amendment Election Conduct Coordinated Election with Douglas County on Town Charter Amendment to move Town elections to November

More information

APPENDIX E. Expenditures by Department

APPENDIX E. Expenditures by Department APPENDIX E Expenditures by Department 199 AIRPORT 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal

More information

2018 Priorities. Staff Lead Legend: 2 P age DCAO GMDS CAO GMEPW. Mayor and Council

2018 Priorities. Staff Lead Legend: 2 P age DCAO GMDS CAO GMEPW. Mayor and Council Priorities Table of Contents Executive Summary Page 3 Economic Development Page 4 Infrastructure Page 5 Safety and Security Page 6 Service Delivery Page 7 Social and Environmental Page 8 Operational Plan

More information

Proposed Five Year Capital Improvement Plan

Proposed Five Year Capital Improvement Plan Proposed Five Year Capital Improvement Plan July 1, 2015-June 30, 2020 Overview FY 2016 Total FY16 CIP $39,451,538 Presenters: Brian Cason Capital Projects Manager Steve Davidek IT Manager Ron Korman Public

More information

ANNUAL ACCESSIBILITY STATUS REPORT

ANNUAL ACCESSIBILITY STATUS REPORT The Ontarians with Disabilities Act, 2001 The Accessibility for Ontarians with Disabilities Act, 2005 ANNUAL ACCESSIBILITY STATUS REPORT 2017 Township Council Accessibility Policy C-PD-03 Administrative

More information

APPENDIX F. Expenditures by Year

APPENDIX F. Expenditures by Year APPENDIX F Expenditures by Year 209 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal 90% 2,700,000 3,000,000

More information

Subject YRRTC Accomplishments and Highlights

Subject YRRTC Accomplishments and Highlights Date May 17, 2018 To Members of York Region Council From Mary-Frances Turner, York Region Rapid Transit Corporation, President Subject 2014-2018 YRRTC Accomplishments and Highlights Ref: Edocs #8410552

More information

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 CNM Master Plan Line # Master Plan Project Title Description Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 Projected spending for FY18 Potential Funding Source

More information

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Executive CIP 2017 Adopted CIP

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Executive CIP 2017 Adopted CIP Police Department Capital Improvement Plan Project Summary Agency Priority # Light Bar Replacement Project 1 45,000 47,225 - - - - # North Police Station 4-100,000 - - - - # Police Building Improvements

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

Provo-Orem Bus Rapid Transit

Provo-Orem Bus Rapid Transit Provo-Orem Bus Rapid Transit and Timpanogos Maintenance Facility Expansion Procurements Informational Meeting August 18, 2014 Agenda Topic Presenter Time Introduction of key project personnel Project history

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

BLUE RIBBON Facilities

BLUE RIBBON Facilities BLUE RIBBON 2015 Facilities FACILITY PRIORITIES Police Administration Addition $4,484,864 Relocation of Fire Station 3 $4,829,683 (Does not include land purchase) City Hall Basement/Conference/Training/Emergency

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

Corporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates

Corporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates Corporate Security & Emergency Management Summary of Submitted 2015 From Rates Service Expense 2014 2015 Revised Non Tax Revenue Net Tax Supported Expense Draft Non Tax Revenue Net Tax Supported Increase

More information

A Growing Hub in the Heart of the Bakken

A Growing Hub in the Heart of the Bakken A Growing Hub in the Heart of the Bakken Presented to the Interim Energy Development and Transmission Committee March 8, 2018 Key Points 1 2 3 CITY GROWTH 2006-2017 DEBT SERVICE GROWTH 2008-2018 CONTINUED

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Municipal Service Park 3 December Consolidation of City services to one centralized complex Municipal Service Park 3 December 2010 Consolidation of City services to one centralized complex Overview: Operational Challenges and Opportunities South East Connector impacts Opportunities: The South

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 15-171 Mayor and Members of Council Denis Leger, Commissioner, Transportation, Facilities and Emergency Services Desiree Kennedy,

More information

Technology Services. FY Budget Presentation

Technology Services. FY Budget Presentation FY 2018-19 Budget Presentation Goals and Accomplishments Overall, completed 74 projects, fulfilled 8,676 service/incident requests, and held uptime of 99.96% Application Consolidation/Reduction initiative-

More information

Centre Lionel E. Lalonde Centre (Emergency & Protective Services Centre)

Centre Lionel E. Lalonde Centre (Emergency & Protective Services Centre) (Emergency & Protective Services Centre) Priorities Committee Meeting Wednesday, March 21 st 2007 Presented By: Tim P. Beadman Acting General Manager of Emergency Services - and - Richard Dixon Facilities

More information

RCMP Capital Improvements

RCMP Capital Improvements Prepared by: D. R. Duckworth, Corporate Services and Community Safety Director Improvements_BUS_1.docx Executive Summary This business case seeks approval for additional funding of $1,000,000 for capital

More information

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Branch Avenue at Alabama Avenue SE Study Area and Location District PSA Ward ANC Phase Description 6

More information

PILLAR #4: COORDINATED INFRASTRUCTURE & SERVICE DELIVERY

PILLAR #4: COORDINATED INFRASTRUCTURE & SERVICE DELIVERY PILLAR #4: COORDINATED INFRASTRUCTURE & SERVICE DELIVERY 23 infrastructure, and community and emergency services delivery can be achieved through regional coordination, shared data, inter-municipal agreements,

More information

City Hall Space Selection 15 Market Square. November 27, 2017

City Hall Space Selection 15 Market Square. November 27, 2017 City Hall Space Selection 15 Market Square November 27, 2017 Future City Hall Space Recommendation Recommendation Committee of the Whole recommends that Common Council approve the Offer to Amending Existing

More information

U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers

U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers Table of Contents 1 Introduction... 3 2 Finding Your Growth Manager and USPS Online Resources... 4 2.1 Find

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER Supports Item No. 2 P&E Committee Agenda September 20, 2007 ADMINISTRATIVE REPORT Report Date: August 31, 2007 Author: Gordon Foy Phone No.: 604.873.7306 RTS No.: 06810 VanRIMS No.: Meeting

More information

Hennepin Avenue Downtown

Hennepin Avenue Downtown Hennepin Avenue Downtown Construction Kick-off Meeting Stakeholders, Owners, Managers January 14 & 17, 2019 Agenda Summary Background Principles Scope, Schedule, Budget Construction Utilities Roadway What

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

Dallas Streetcar Central Link Locally Preferred Alternative Selection

Dallas Streetcar Central Link Locally Preferred Alternative Selection Dallas Streetcar Central Link Locally Preferred Alternative Selection Mobility Solutions, Infrastructure & Sustainability Committee August 28, 2017 Tanya Brooks, Assistant Director Mobility and Street

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

PUBLIC WORKS FY

PUBLIC WORKS FY PUBLIC WORKS FY 2014-15 PUBLIC WORKS MISSION Maintain and enhance the livability and sustainability of Lane County s natural and built environments by providing safe and cost effective public infrastructure

More information

Adopted by La Mesa City Council July 9, 2013 Resolution

Adopted by La Mesa City Council July 9, 2013 Resolution Adopted by La Mesa City Council July 9, 2013 Resolution 2013-059 Table of Contents ACKNOWLEDGEMENTS... A-1 INTRODUCTION... I-1 Vision... I-1 Background... I-1 Citizen Participation... I-3 Planning in La

More information

Page 1 of 1 Clause 4, Report 8, By-Law Number A By-Law to Approve the 2018 Capital Budget

Page 1 of 1 Clause 4, Report 8, By-Law Number A By-Law to Approve the 2018 Capital Budget Page 1 of 1 Clause 4, Report 8, By-Law Number -19 A By-Law to Approve the Passed: December 19, 2017 The Council of The Corporation of the City of Kingston hereby enacts as follows: 1. That the following

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

Sewer System Capital Budget Process

Sewer System Capital Budget Process Sewer System Capital Budget Process Presentation to New Castle County Council Department of Special Services Committee Meeting Jason P. Zern, P.E. Operations Engineer March 1, 2016 1 Outline Review Asset

More information

INCENTIVE PAY SCHEDULES

INCENTIVE PAY SCHEDULES INCENTIVE PAY SCHEDULES Certificates and Licenses: All Town Departments (except Fire Department) $25 per month for each eligible certificate or license up to a maximum of $100 per month Fire Department

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

26 th Street North and Old Dominion Drive Master Planning Task Force

26 th Street North and Old Dominion Drive Master Planning Task Force 26 th Street North and Old Dominion Drive Master Planning Task Force Presentation to Arlington Joint Facilities Advisory Commission October 24, 2018 Site Master Planning Task Force On September 2018, the

More information

Corridor Management Committee. January 12, 2017

Corridor Management Committee. January 12, 2017 Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major

More information

Priority Ranking. Timeframe

Priority Ranking. Timeframe Table G - 1. Actions Identified for by the () (From Ramsey County Master Action Chart) Action 1 All- Hazards Preparedness & Response Support Continue to ensure that all Ramsey County residents are aware

More information

Priority Ranking. Timeframe

Priority Ranking. Timeframe Table G - 11. Actions Identified for by the () (From Ramsey County Master Action Chart) Action 1 All- Hazards Preparedness & Response Support Continue to ensure that all Ramsey County residents are aware

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

5 YEAR CAPITAL IMPROVEMENT SPENDING PLAN

5 YEAR CAPITAL IMPROVEMENT SPENDING PLAN CITY OF COMPTON 5 YEAR CAPITAL IMPROVEMENT SPENDING PLAN 1 st Draft DECEMBER 4, 2018 COMPTON MUNICIPAL WATER DEPARTMENT ENTERPRISE WATER FUND PROJECTS COMPTON MUNICIPAL WATER BACKGROUND The Compton Municipal

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

STATE STREET CORRIDOR

STATE STREET CORRIDOR CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals

More information

KEEPING YOU OUT IN FRONT

KEEPING YOU OUT IN FRONT URBACON DATA CENTRE SOLUTIONS KEEPING YOU OUT IN FRONT A next generation data centre in the core of downtown Toronto DOWNTOWN DATA CENTRE 281 FRONT STREET TORONTO, ON 1 2 X URBACON BUILDING GROUP 70 Lake

More information

THE BILLY BISHOP TORONTO CITY AIRPORT PEDESTRIAN TUNNEL CONNECTING INVESTORS, TRAVELLERS AND CITIZENS

THE BILLY BISHOP TORONTO CITY AIRPORT PEDESTRIAN TUNNEL CONNECTING INVESTORS, TRAVELLERS AND CITIZENS THE BILLY BISHOP TORONTO CITY AIRPORT PEDESTRIAN TUNNEL CONNECTING INVESTORS, TRAVELLERS AND CITIZENS BILLY BISHOP TUNNEL FUN FACTS It s an award-winner International Tunnelling & Underground Space Association

More information

White Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017

White Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017 White Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017 As operators have demanded increasing levels of power density

More information

Facilities Master Plan Toronto Public Library Board Consultation

Facilities Master Plan Toronto Public Library Board Consultation STAFF REPORT INFORMATION ONLY Facilities Master Plan Toronto Public Library Board Consultation Date: May 28, 2018 20. To: From: Toronto Public Library Board City Librarian SUMMARY The purpose of this report

More information

PISMO BEACH COUNCIL AGENDA REPORT

PISMO BEACH COUNCIL AGENDA REPORT PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: REVIEW OF INFORMATION TECHNOLOGY (IT) STATUS AND IT STRATEGIC PLAN IMPLEMENTATION UPDATE. RECOMMENDATION: 1. Receive the IT Status and Implementation Update.

More information

Introduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you.

Introduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you. Introduction Over the last few years, gigabit Internet has moved from idea to reality, with dozens of communities working hard to build networks with speeds capable of supporting the future of the Internet.

More information

Approval of Navy Yard Chiller Joint Development Agreement

Approval of Navy Yard Chiller Joint Development Agreement Planning, Program Development and Real Estate Committee Item V B July 9, 2015 Approval of Navy Yard Chiller Joint Development Agreement Washington Metropolitan Area Transit Authority Board Action/Information

More information

PUBLIC WORKS. 1oo. DiEital Fee Schedules. Effective January 1, 2008

PUBLIC WORKS. 1oo. DiEital Fee Schedules. Effective January 1, 2008 PUBLIC WORKS Geographic Information Systems DiEital Fee Schedules Effective January 1, 2008 Date Advertised 12103/07 In (Publication) Daily Business Journal Public Hearing Date Approved as to form: David

More information

Bus Rapid Transit in Montgomery County

Bus Rapid Transit in Montgomery County Bus Rapid Transit in Montgomery County Presentation to the Transportation Planning Board Technical Committee June 1, 2018 Item #8 Agenda What is Bus Rapid Transit (BRT)? Montgomery County s BRT Network

More information

Riverside Public Utilities Long Range Space Plan. Board of Public Utilities 12/07/12

Riverside Public Utilities Long Range Space Plan. Board of Public Utilities 12/07/12 Riverside Public Utilities Long Range Space Plan Board of Public Utilities 12/07/12 Long Term Goals Centralize staff location(s) for 650 positions Increase security for critical 24/7 operations Optimize

More information

CITY OF WINSTON-SALEM, NORTH CAROLINA Public Safety Needs Assessment Study Phase One EXECUTIVE SUMMARY

CITY OF WINSTON-SALEM, NORTH CAROLINA Public Safety Needs Assessment Study Phase One EXECUTIVE SUMMARY EXECUTIVE SUMMARY I. Documentation and Current Conditions Establishment Process II. Existing Public Safety Facilities Analysis III. Space Allocation, Co-Location and Potential Site Location Analysis IV.

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24

More information

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

Dealing With a Disaster and Its Effect on the Utility Operation

Dealing With a Disaster and Its Effect on the Utility Operation Nashville Electric Service Dealing With a Disaster and Its Effect on the Utility Operation UTA Fall Conference Florence, Alabama October 12-14, 2011 Outline Who We Are Typical Emergency Response Challenges

More information

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION BALTIMORE UTILITY ASSET MANAGEMENT DIVISION Baltimore City s Asset Management Program Sustainable Best Management Practices in Transportation Workshop July 16, 2013 Rudy S. Chow, P.E. Bureau Head Alfred

More information

S T A F F R E P O R T

S T A F F R E P O R T S T A F F R E P O R T Meeting Date: 04 Jul 2017 To: Prepared By: Reviewed/Approved By: Department Report No: Subject: Corporate Strategic Plan: Mayor and Members of Council Lynn Phillips Tim Blake, Valerie

More information

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION CAPITAL OUTLAY FUND PROPOSED 2017-2018 2016-2017 ACCOUNT BUDGET BUDGET COMMENTS CODE DESCRIPTION REVENUE 4.4110.000.000 County Appropriation - Initial 2,827,745 882,525 4.4110.000.000 County Appropriation

More information

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 17 Block North Portal Drive NW Study Area and Location District PSA Ward ANC Phase Description 4 41

More information

This page intentionally left blank.

This page intentionally left blank. 2017 Capital Budget Revised December 5, 2016 1 This page intentionally left blank. 2 City of Shaker Heights Capital Summary 2017 Police Department Equipment $ 591,000 Fire Department Equipment 583,000

More information

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for

More information

Communications Design Challenges for the

Communications Design Challenges for the Communications Design Challenges for the Edmonton North LRT Extension Syl Santo, RCDD ITS Designer / Engineering Coordinator Stantec Consulting Presenter Background Syl Santo, RCDD Over 27 years of experience

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

Infrastructure and Asset Management. and Asset Management

Infrastructure and Asset Management. and Asset Management Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 1 W elcome to Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 2 1 About Emad Elbeltagi Structure and delivery Assessment Course

More information

Best Practice in Engineering Maintenance. Municipal Engineering Foundation Victoria USA & Canada Study Tour 2016

Best Practice in Engineering Maintenance. Municipal Engineering Foundation Victoria USA & Canada Study Tour 2016 Best Practice in Engineering Maintenance Municipal Engineering Foundation Victoria USA & Canada Study Tour 2016 Best Practice in Engineering Maintenance u Service Delivery Models u Planning u Innovation

More information

Halifax Regional Municipality

Halifax Regional Municipality Halifax Regional Municipality Challenge Leverage existing IT infrastructure to design a high-definition surveillance system that helps protect corporate assets across the Halifax Regional Municipality

More information

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE SITE COMPARISON CHART CITY Bellevue County Kirkland Kirkland Redmond ADDRESS 555 116th Ave. Lane 118th Ave. 14955 90th St. ACREAGE 5.6 10.7 7.5 5.5 7.2 to 11.6 ACRES ZONING COMMERCIAL LIGHT INDUSTRIAL

More information