SUPPLEMENTAL ECMS ADVANCED INFORMATION MARCH 24, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Size: px
Start display at page:

Download "SUPPLEMENTAL ECMS ADVANCED INFORMATION MARCH 24, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)"

Transcription

1 Updated March 8, 2016 BUTLER COUNTY SR 3020(296) #94932 PROPOSAL:$21.84 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 The description and location of the project is as follows: Project includes the addition of eastbound and westbound opposing left turn lanes on Freedom Road at the signalized intersection with Valley Forge and Parkwood Drives. This project also includes replacement of the existing traffic signal and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3020, SECTION 296, in Butler COUNTY Cranberry TOWNSHIP from approximately 0.2 miles east of the SR 3020/Powell Road intersection at segment 0020 offset 1227 to approximately 125 feet east of the SR 3020/Haines School Road/Laporte Drive intersection at segment 0030 offset DBE 7%, Anticipated Notice to Proceed , Required Completion PHILADELPHIA COUNTY SR 0000(PE2) # PROPOSAL:$20.76 The description and location of the project is as follows: The milling and resurfacing with bituminous material, general maintenance of various state roadways throughout Philadelphia County, Engineering District 6-0, Commonwealth of Pennsylvania. Anticipated Notice to Proceed , Required Completion LANCASTER COUNTY SR 1066(003) # PROPOSAL:$25.44 PLANS:$ X18:$ X36:$85.80 EXSTRUCT:$ X18:$ X36:$50.70 This project consists of the rehabilitation of the existing two-lane four-span bridge that carries SR 1066 (Landis Valley Road) over US 222. The work includes the repair of the existing prestressed concrete superstructure due to collision damage as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1066, SECTION 003, in LANCASTER COUNTY, MANHEIM TOWNSHIP, from Segment 0010 Offset 0000 to Segment 0010 Offset 0233, for an overall project length of linear feet (0.04 mile). Anticipated Notice to Proceed , Required Completion Updated March 4, 2016 DELAWARE COUNTY SR 3024(NPT) #87119 PROPOSAL:$22.32 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: sidewalk, curb, ADA curb ramp and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3024, SECTION NPT, in DELAWARE COUNTY Nether Providence TOWNSHIP from approximately Manchester Avenue at segment _0010 offset _0294 to approximately SR 252 at segment 0010 offset DBE 8%, Anticipated Notice to Proceed , Required Completion SOMERSET COUNTY SR 4031(001) # PROPOSAL:$20.88 PLANS:$ X18:$ X36:$50.70 The description and location of the project is as follows: This project is for the resurfacing of approximately miles of bituminous roadway and includes milling, guide rail & drainage upgrades, tree trimming & removal and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 4031, SECTION 001, in SOMERSET COUNTY, JENNER & CONEMAUGH TOWNSHIPS at the approximate location: SR Segment 0010, Offset 0000 to Segment 0090, Offset Anticipated Notice to Proceed , Required Completion

2 Updated February 24, 2016 SOMERSET COUNTY SR 56(003) #92616 PROPOSAL:$35.88 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$19.50 The description and location of the project is as follows: This project is located on SR 0056 in Cambria/Somerset Counties with minor structure rehabilitation on SR Work on SR 0056 includes concrete patching, diamond grinding, drainage & guide rail upgrades, minor structure rehabilitation, bituminous mill and overlay. Safety improvements will be performed, including signing and pavement marking upgrades, traffic signal upgrades and the installation of high tension cable median barrier, to prevent cross over crashes. Work on SR 1039 will include structure rehabilitation on 12th St Paint Creek Bridge (over SR 3015 Locust Street) including minor roadway approach work and other miscellaneous construction. All work in this contract is to be performed as indicated on the approved drawings included in the bid package for STATE ROUTE 0056, SECTION 003, in CAMBRIA & SOMERSET COUNTIES PAINT & RICHLAND TOWNSHIPS, PAINT & WINDBER BOROUGHS. DBE 7%, Anticipated Notice to Proceed , Required Completion BEDFORD COUNTY SR 4012(001) #96536 PROPOSAL:$21.96 PLANS:$ X18:$ X36:$74.10 The description and location of the project is as follows: This project is for the resurfacing of approximately 9.77 miles of bituminous roadway and includes milling, guide rail & drainage upgrades other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 4012, SECTION 001, in BEDFORD COUNTY, VARIOUS TOWNSHIPS at the approximate location SR Segment 0010, Offset 0000 to Segment 0120, Offset 2257 SR Segment 0010, Offset 0000 to Segment 0020, Offset 2999 SR Segment 0010, Offset 0000 to Segment 0020, Offset 2945 SR Segment 0120, Offset 0000 to Segment 0124, Offset Anticipated Notice to Proceed , Required Completion BLAIR COUNTY SR 4017(JGP) # PROPOSAL:$24.24 PLANS:$ X18:$ X36:$78.00 The description and location of the project is as follows: This work is for the construction of a new walkway including ADA ramps and traffic signal upgrades along Juniata Gap Road (SR 4017) from Wopsononock Avenue (SR 4015) to PSU Altoona Campus and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4017, SECTION JGP in BLAIR COUNTY, LOGAN TOWNSHIP, CITY OF ALTOONA. DBE 6%, Anticipated Notice to Proceed , Required Completion

3 SCHUYLKILL COUNTY SR 61(17S) # PROPOSAL:$18.60 PLANS:$9.12 The description and location of the project is as follows: Guide Rail update/upgrade project and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 61, SECTION 17S, in Schuylkill COUNTY in the Townships of Butler, East Brunswick, Eldred, Foster, Hegins, North Union, Porter, Rush, South Manheim, Union, Washington, West Brunswick, West Mananoy, and West Penn and the Boroughs of Gilberton from approximately SR 0061 in Seg Offset 1651 to Seg Offset 1927, SR 0895 in Seg 550 Offset 0530 to Seg Offset 1912, SR 0895 in Seg 0740 Offset 0247 to Seg Offset 0424, SR 1006 in Seg 0010 Offset 0473 to Seg Offset 1023, SR 1012 in Seg 0170 Offset 1728 to Seg Offset 2075, SR 1020 in Seg Offset 0142 to Seg Offset 0642, SR 2003 in Seg Offset 1061 to Seg Offset 1449, SR 2010 in Seg Offset 1971 to Seg Offset 1434, SR 2011 in Seg Offset 0240 to Seg Offset 2461, SR 2018 in Seg Offset 0429 to Seg Offset 0979, SR 3009 in Seg Offset 0497 to Seg 0080 Offset 1788, SR 4002 in Seg Offset 1593 to Seg Offset 1843, SR 4009 in Seg 0060 Offset 2243 to Seg Offset 3316, SR 4010 in Seg Offset 0278 to Seg Offset 0638, SR 4011 in Seg 0140 Offset 0029 to Seg Offset 0214, SR 4011 in Seg 0050 Offset 0669 to Seg Offset 0889, SR 4013 in Seg 0010 Offset 0024 to Seg Offset 0405, SR 4022 in Seg Offset 0617 to Seg Offset 1000, SR 4024 in Seg Offset 0096 to Seg 0080 Offset 0981, SR 4027 in Seg 0030 Offset 0764 to Seg Offset 0902, SR 4031 in Seg Offset 1640 to Seg 0020 Offset 0139, SR 4032 in Seg Offset 1906 to Seg 0070 Offset 0069, SR 4033 in Seg Offset 0056 to Seg Offset 1538, SR 4037 in Seg Offset 1917 to Seg 0100 Offset 1443 and in CARBON COUNTY in the Townships of Franklin, Lower Towamensing and Penn Forest from approximately SR 1001 in Seg Offset 2659 to Seg 0160 Offset 0205, SR 2004 in Seg Offset 1789 to Seg Offset 1826, SR 2007 in Seg Offset 0563 to Seg Offset 0597 for a total of appx 30,126 ft. (5.71 miles). DBE 6%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 0000 # PROPOSAL:$23.64 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the Installation of various safety improvements, including pavement markings, signing, delineation, signal upgrades, guiderail updates, and other miscellaneous construction, as indicated on the approved drawings contained in the Bid Package, on various STATE ROUTES in ALLEGHENY, BEAVER AND LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. Anticipated Notice to Proceed , Required Completion PHILADELPHIA COUNTY SR 1002(PAT) #17622 PROPOSAL:$28.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$54.60 The description and location of the project is as follows: The project is for the rehabilitation of the stone arch Adams Avenue Bridge and other miscellaneous construction, all as indicated on the drawings approved for STATE ROUTE 1002, SECTION PAT, in PHILADELPHIA COUNTY from approximately Crescentville Road at segment 0050 offset 0000 to approximately Newtown Avenue at segment 0050 offset Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 3

4 Updated February 24, 2016 MIFFLIN COUNTY SR 0000 # PROPOSAL:$23.40 PLANS:$ X18:$ X36:$66.30 The description and location of the project is as follows: For the improvement of a certain section of TOWNSHIP ROAD in MIFFLIN COUNTY, GRANVILLE TOWNSHIP, Commonwealth of Pennsylvania, TOWNSHIP ROUTE T-750. This project being situated as follows: In Granville Township on Township Route T-750 (Round House Road) in the area of Lewistown Junction, approximately 0.3 miles south of the intersection of SR 0103 and The project length is approximately 3,099 feet. For the reconstruction of Round House Road. Construction will require coordination of work with the Railroad. Construction will include Superpave Asphalt Mixture Designs for the base, binder and wearing courses, excavation, pavement base drain, pavement markings, and miscellaneous construction as indicated on the approved drawings included in the bid package. DBE 6%, Anticipated Notice to Proceed , Required Completion PERRY COUNTY SR 850(013) #92351 PROPOSAL:$22.32 PLANS:$ X18:$ X36:$ This project consists of a pavement overlay, drainage improvements, guiderail updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0850, SECTION 013, in PERRY COUNTY, NORTHEAST MADISON TOWNSHIP, from the intersection of SR 0850 (Fort Robinson Road) with SR 0274 (Sherman Valley Road) at Segment 0250 Offset 1880 to the intersection of SR 0850 (Fort Robinson Road) with SR 0017 (Tuscarora Path) at Segment 0154 Offset 1693, for an overall project length of 21, linear feet (4.00 miles). Anticipated Notice to Proceed , Required Completion WASHINGTON COUNTY SR 2012(0) # PROPOSAL:$21.48 PLANS:$4.80 The description and location of the project is as follows: Surface improvement contract of certain sections of various State Routes in Washington County. Construction consists of milling, superpave asphalt courses, base repair, pavement marking and other miscellaneous construction on all or portions of the selected State Routes, all as indicated on the approved drawings for various State Routes in Washington County. Anticipated Notice to Proceed , Required Completion Updated February 23, 2016 NORTHAMPTON COUNTY SR 2023(01B) #92018 PROPOSAL:$30.36 PLANS:$ X18:$ X36:$ Consists of the rehabilitation of the existing three span stone masonry arch structure over Bushkill Creek in City of Easton, Northampton County, PA. The structure length is approximately 178 feet consisting of two main spans and a third overflow span separated from the two main spans by an approximately 90 fill area retained by stone masonry walls. Each arch is approximately 85 feet in length along the barrel. The proposed rehabilitation includes installing corrugated steel arch liners grouted in place, installation of concrete kneewalls to support the arch liners and extend below streambed for scour protection, channel wall repairs, repointing of spandrel walls/ retaining walls, parapet repairs, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2023, SECTION 01B, in Northampton County, City of Easton from approximately Snyder Street intersection at segment 0010 offset 1287 to approximately College Avenue at SR 2025 SEC 01B segment 0010 offset Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR 3070(CT4) #

5 PROPOSAL:$25.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: construction of sidewalks, crosswalks, curb extensions, and bulb outs, traffic islands, lane re-striping, tree planting and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3070, SECTION CT4, in Chester COUNTY, Sadsbury TOWNSHIP from approximately Octorara Road at segment 0030 offset 1568 to approximately Independence Way/AIM Boulevard at segment 0050 offset DBE 2%, Anticipated Notice to Proceed , Required Completion SUSQUEHANNA COUNTY SR 171(M02) #89016 PROPOSAL:$24.84 PLANS:$3.84 This project is for the resurfacing of approximate total of miles of (12.47 Miles in Susquehanna County of 409 Fund ) and (4.99 Miles in Wyoming County of 409 Fund) and (9.05 Miles in Susquehanna County of Capital Fund) existing bituminous roadway on the following STATE ROUTES : (S.R Segment 0390 Offset 0000 to Segment 0440 Offset 0344 (2.26 MI), S.R Segment 0400 Offset 1100 to Segment 0450 Offset 3829 (2.32), S.R Segment 0180 Offset 0000 to Segment Offset 2884 (3.30 MI), S.R Segment 0290 Offset 0000 to Segment 0360 Offset 1166 (3.54), and STATE ROUTES (Capital): S.R Segment 0050 Offset 0000 to Segment 0160 Offset 1251 (5.82), S.R Segment 0700 Offset 2407 to Segment 0700 Offset 2822 (.08), S.R Segment 0710 Offset 0000 to Segment 0710 Offset 1627 (.31), SR 171 Segment 0711 Offset 0000 to Segment 0711 Offset 1695 (.31), S.R Segment 0460 Offset 0000 to Segment 0490 Offset 3304 (2.51) in SUSQUEHANNA COUNTY and 4.99 miles (409) of existing bituminous roadway on the following STATE ROUTE: (S.R Segment0130 Offset 0000 to Segment 0220 Offset 3014 in WYOMING COUNTY IN VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix Design Asphalt Scratch and Binder Leveling Course, Milling, Line Painting and Pavement Markings. Anticipated Notice to Proceed , Required Completion Updated February 18, 2016 WARREN COUNTY SR 1013(DOI) #97871 PROPOSAL:$18.96 PLANS:$2.40 For the construction or improvement of a certain section of STATE HIGHWAY in WARREN COUNTY, ELK TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 1013 SECTION DOI. This project being situated as follows: From approximately 2302 feet north of Coal Bed Rd. at Segment 0160 Offset 2303 then north to Pa./N.Y. State Line at Segment 0340 Offset For the bituminous overlay with Warm Mix Superpave Asphalt Mixture Designs 20' to 26' in width; also for guiderail, paved shoulders, and pavement markings all within a project length of 8.64 miles as indicated on the approved drawings. Anticipated Notice to Proceed , Required Completion ERIE COUNTY SR 5(261) #99730 PROPOSAL:$21.72 PLANS:$2.52 For the construction or improvement of a certain section of STATE HIGHWAY in ERIE COUNTY, GIRARD AND FAIRVIEW TOWNSHIPS AND LAKE CITY BOROUGH, Commonwealth of Pennsylvania, STATE ROUTE 0005 SECTION 261. This project being situated as follows: From approximately 261 feet west of intersection with Maple Ave. at Segment 0180 Offset 3106 then east to approximately 984 east of the intersection with SR at Segment 0290 Offset For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 22' to 56' in width; also for guiderail, ADA curb ramps, loop sensors, pedestrian pushbuttons and poles, and pavement markings all within a project length of 4.93 miles as indicated on the approved drawings. Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 271(0) #

6 PROPOSAL:$18.60 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Pavement preservation project that includes a bituminous overlay, guiderail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 271, SECTION 02R, in WESTMORELAND COUNTY FAIRFIELD AND LIGONIER TOWNSHIPS from SR 711 at segment 0010 offset 0000 to THE WESTMORELAND/SOMERSET COUNTY LINE at segment 0160 offset Anticipated Notice to Proceed , Required Completion NORTHUMBERLAND COUNTY SR 147(80M) #87908 PROPOSAL:$40.68 PLANS:$ X18:$ X36:$93.60 The description and location of the project is as follows: Resurfacing, rock slope protection, guide rail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 147, SECTION 80M, in NORTHUMBERLAND COUNTY, UPPER AUGUSTA AND LOWER AUGUSTA TOWNSHIPS from approximately 1.7 miles north of the intersection of SR 147 and SR 4022(Boyles Run Rd) at segment 0380 offset 2402 to approximately 0.3 miles south of the intersection of SR 147 and SR 159(S. Second St.) at segment 0500 offset Anticipated Notice to Proceed , Required Completion WAYNE COUNTY SR 191(SLD) #96818 PROPOSAL:$30.12 PLANS:$ X18:$ X36:$74.10 X-SEC:$ X18:$ X36:$46.80 This is a Design/ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in WAYNE COUNTY, BUCKINGHAM TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0191, SECTION SLD. The project being situated as follows From a point approximately 2.32 miles SOUTHEAST of the intersection with SR 0370 (Crosstown Highway) at Station to a point approximately 2.43 miles SOUTHEAST of the intersection with SR 0370 (Crosstown Highway) at Station along SR The project is the repair of a landslide along the hillside of SR Because of the slide, a portion of SR 0191 will also be reconstructed to repair damages to the roadway. The project will require the replacement of guide rail in the landslide area. A signalized lane closure will be utilized. The reconstructed roadway will match existing conditions and no new drainage systems will be included. Any drainage work will only include restoration of the existing ditches/swales/pipes. Other work includes bituminous paving, line painting and guiderail work, all contained within an overall project length of 434 linear feet (0.082 mile) as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed , Required Completion LACKAWANNA COUNTY SR 106(GRM) # PROPOSAL:$19.32 PLANS:$0.12 The description and location of the project is as follows: Lackawanna County Guide Rail Maintenance Group 4-16-GRM1 includes the installation, repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, median barrier, traffic impact attenuators and glare screen systems on VARIOUS STATE ROUTES throughout LACKAWANNA COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR 239(GRM) # PROPOSAL:$19.09 PLANS:$0.12 The description and location of the project is as follows: Luzerne County Guide Rail Maintenance Group 4-16-GRM2 includes the installation, repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, median barrier, glare screen and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout LUZERNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion VENANGO COUNTY - SR 322(B00) #

7 PROPOSAL:$23.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 EXSTRUCT:$ X18:$ X36:$50.70 The description and location of the project is as follows: Rehabilitation of the bridge carrying State Route 322 over Sugar Creek and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 322, SECTION B00, in Venango COUNTY Sugarcreek BOROUGH from approximately segment 140 offset 306 to approximately segment 140 offset Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated February 15, 2016 LYCOMING COUNTY SR 180(67M) #82310 PROPOSAL:$21.60 PLANS:$3.24 EXSTRUCT:$ X18:$ X36:$78.00 The description and location of the project is as follows: Microsurfacing, epoxy based surface treatment for bridge decks, rumble strips, pavement markings, neoprene strip seal dam, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 180, SECTION 67M from approximately 0.68 miles northeast of the intersection with State Route 2014 at Segment 0370 Offset 0953/Segment 0371 Offset 0959 to approximately 1.16 miles northwest of the intersection with State Route 2049 at Segment 0420 Offset 0837/Segment 0425 Offset 2400 in MONTOURSVILLE BOROUGH AND FAIRFIELD and MUNCY TOWNSHIPS, LYCOMING COUNTY and for STATE ROUTE 220, SECTION 186 from 0.52 miles east of the intersection with State Route 2014 at Segment 0230 Offset 1375/ Segment 0231 Offset 1450 to approximately 0.32 miles west of the intersection with State Route 15 at Segment 0300 Offset 0100/Segment 0301 Offset 0100 in WOODWARD TOWNSHIP and the CITY OF WILLIAMSPORT, LYCOMING COUNTY. Anticipated Notice to Proceed , Required Completion Updated February 12, 2016 FAYETTE COUNTY SR 51(24R) #87370 PROPOSAL:$23.40 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: milling, resurfacing, concrete patching, guide rail, delineation, ADA ramps, signal upgrades, signing, top of slope repair, drainage and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 51, SECTION 24R, in FAYETTE COUNTY CITY OF UNIONTOWN & NORTH UNION TOWNSHIP from approximately the intersection of SR 51 & SR 2040 at segment 0010 offset 0015 to approximately the intersection of SR 51 & SR 1043 at segment 0110 offset 0276 NB, segment 0111 offset 0374 SB. DBE 6%, Anticipated Notice to Proceed , Required Completion VENANGO COUNTY SR 0000 # PROPOSAL:$18.00 PLANS:$ X18:$ X36:$74.10 For the installation of All Weather Pavement Markings on various state routes throughout District 1-0. This work will be in various municipalities in the Counties of Crawford, Erie, Forest, Mercer, Venango, and Warren as indicated on the approved drawings. DBE 3%, Anticipated Notice to Proceed , Required Completion

8 TIOGA COUNTY SR 287(142) #97719 PROPOSAL:$25.08 PLANS:$ X18:$ X36:$62.40 The description and location of the project are as follows: This work is the milling and resurfacing of the existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch and wearing courses, guide rail, pavement markings, and other miscellaneous construction all within a length of 16,038 linear feet (3.04 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 287, SECTION 142 from approximately 2.7 miles northeast of the intersection with State Route 4039 at Segment 0600 Offset 2614 in MIDDLEBURY TOWNSHIP to approximately 1.20 miles southwest of the intersection with State Route 1030 at Segment Offset 2011 in TIOGA TOWNSHIP, TIOGA COUNTY. Anticipated Notice to Proceed , Required Completion Updated February 11, 2016 POTTER COUNTY SR 244(A04) #4896 PROPOSAL:$22.32 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in POTTER COUNTY, GENESEE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0244, SECTION A04. The project being situated as follows: Potter County on State Route 0244 from Segment 0250/Offset 2489 to Segment 0264/Offset 0330 near the Village of Ellisburg, for a total construction length of approximately 439 feet (0.083 miles). For the replacement of existing bridge with a box culvert. Construction includes superpave asphalt mixture design for the base, binder, and wearing courses, pavement base drain, guide rail, pavement markings, and miscellaneous construction as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 981(V10) #47478 PROPOSAL:$ PLANS:$ X18:$ X36:$1, X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: The scope of work will include full depth reconstruction and adding a center left turn lane from Arnold Palmer Drive to the Airport entrance; a new connector road between SR 2027 (Charles Houck Rd) and SR 0981 including a roundabout at the Airport entrance. This roadway improvement will replace the existing SR 0981/SR 2027 intersection. From the Airport entrance to T-881 (Airport Road), 3R (Resurfacing, Restoration, and Rehabilitation) criteria will be the basis for the roadway improvements. In addition, left turn lanes will be installed at the SR 0981/Bay Hill Drive intersection. Guide rail, pavement markings, signing and drainage will be updated within the project limits as well as other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 981, SECTION V10, in WESTMORELAND COUNTY UNITY TOWNSHIP from approximately 300 West of T-881 (Airport Road) at segment 0550 offset 1456 to approximately the intersection with T-952 (Arnold Palmer Drive) at segment 0600 offset DBE 6%, Anticipated Notice to Proceed , Required Completion

9 March 8, 2016 Updated February 9, 2016 SULLIVAN COUNTY SR 4008(019) # PROPOSAL:$16.32 PLANS:$ X18:$ X36:$74.10 The description and location of the project is as follows: Procuring and setting of pre-cast box culvert and inlet and outlet section, including grouting and posttensioning and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4008, SECTION 019, in SULLIVAN COUNTY, ELKLAND TOWNSHIP from approximately 1.8 miles east of the intersection with SR 4006 at segment 0080 offset 0350 to approximately 1.7 miles northwest of the intersection with SR 4007 at segment 0080 offset Anticipated Notice to Proceed , Required Completion Updated February 4, 2016 WARREN COUNTY SR 958(B03) #74576 PROPOSAL:$13.20 PLANS:$ X18:$ X36:$39.00 For the acquisition and installation of a Precast Reinforced Concrete Box Culvert and other miscellaneous construction, as indicated on the approved drawings for STATE ROUTE 0958, SECTION B03, in WARREN COUNTY, FREEHOLD TOWNSHIP over Branch of Little Brokenstraw Creek at Segment 0050 offset Anticipated Notice to Proceed , Required Completion ECMS ADVANCED INFORMATION MARCH 24, 2016 Updated February 3, 2016 MONROE COUNTY SR 0000 # PROPOSAL:$12.00 PLANS:$ X18:$ X36:$66.30 THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: PROCURING AND SETTING PRE-CAST BOX CULVERT AND INLET AND OUTLET SECTIONS INCLUDING GROUTING AND POST-TENSIONING AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 3021, SECTION 002, IN BRADFORD COUNTY, LEROY TOWNSHIP FROM THE INTERSECTION OF STATE ROUTE 3021 AND STATE ROUTE 414 AT SEGMENT 0010 OFFSET 0002 TO APPROXIMATELY 4.54 MILES SOUTHEAST OF THE INTERSECTION OF SR 3021 AND SR 3028 AT SEGMENT 0010 OFFSET ANTICIPATED NOTICE TO PROCEED , REQUIRED COMPLETION

Distracted driving citations continue to rise in Pennsylvania

Distracted driving citations continue to rise in Pennsylvania Infographic for Immediate Release April 7, 2017 Distracted driving citations continue to rise in Pennsylvania HARRISBURG Distracted driving citations increased by 52 percent statewide between 2014 and

More information

Distracted driving citations in Pennsylvania see significant jump

Distracted driving citations in Pennsylvania see significant jump Infographic for Immediate Release April 2, 2018 Distracted driving citations in Pennsylvania see significant jump HARRISBURG Distracted driving citations increased by 52 percent statewide in 2017 and have

More information

APPENDIX N. PACSES Domestic Relations Sections Locations. RFP Appendix N PACSES Domestic Relations Sections Locations Page 1 of 16

APPENDIX N. PACSES Domestic Relations Sections Locations. RFP Appendix N PACSES Domestic Relations Sections Locations Page 1 of 16 APPENDIX N PACSES Domestic Relations s Locations RFP 02-15 Appendix N PACSES Domestic Relations s Locations Page 1 of 16 Adams County Domestic Relations Adams 123 BALTIMORE ST GETTYSBURG PA 17325 County

More information

Pennsylvania Archaeological Site Survey Annual Site Reporting Activity in 2017

Pennsylvania Archaeological Site Survey Annual Site Reporting Activity in 2017 Commonwealth Keystone Building 400 North Street 2nd Floor Harrisburg, PA 17120 717.783.8947 Summary In 2017, 388 new archaeological sites were added to the (PASS) files. This represents a significant decrease

More information

SPRING 2014 PENN STATE POLL

SPRING 2014 PENN STATE POLL SPRING 2014 PENN STATE POLL Report of Methods Prepared by: Center for Survey Research May 2014 TABLE OF CONTENTS INTRODUCTION...1 METHODOLOGY...2 Instrument Development...2 Sample Design...2 RDD Landline

More information

SPRING 2015 PENN STATE POLL

SPRING 2015 PENN STATE POLL SPRING 2015 PENN STATE POLL Report of Methods BLUE POLL Prepared by: Center for Survey Research May 2015 TABLE OF CONTENTS INTRODUCTION...1 METHODOLOGY...2 Instrument Development...2 Sample Design...2

More information

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice 1 of 6 Date Generated: 10/30/2018 Projects Returned: 75 Let Date Contract ID Project ID Project Name Project Type County Route Work

More information

Fall 2012 PENN STATE POLL

Fall 2012 PENN STATE POLL Fall 2012 PENN STATE POLL Report of Methods Prepared by: Center for Survey Research November 2012 TABLE OF CONTENTS INTRODUCTION...1 METHODOLOGY...2 Instrument Development...2 Sample Design...2 RDD Landline

More information

XRMS XRMSSEG ROADWAY INVENTORY SEGMENTS

XRMS XRMSSEG ROADWAY INVENTORY SEGMENTS XRMS XRMSSEG ROADWAY INVENTORY SEGMENTS Agency Responsible: Bureau of Maintenance & Operations Contact: State road data: Bureau of Planning and Research, Geographic Information Division, 772-3305 Non-state

More information

PENNSYLVANIA AREA CAREER AND TECHNICAL EDUCATION SCHOOLS 2008 REPORT

PENNSYLVANIA AREA CAREER AND TECHNICAL EDUCATION SCHOOLS 2008 REPORT PENNSYLVANIA AREA CAREER AND TECHNICAL EDUCATION SCHOOLS 2008 REPORT PENNSYLVANIA DEPARTMENT OF EDUCATION BUREAU OF CAREER AND TECHNICAL EDUCATION March, 2009 Commonwealth of Pennsylvania Edward G. Rendell,

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

THERE S A WORLD OF TROUBLE OUT THERE. Where can you find solutions to help you be prepared?

THERE S A WORLD OF TROUBLE OUT THERE. Where can you find solutions to help you be prepared? THERE S A WORLD OF TROUBLE OUT THERE. Where can you find solutions to help you be prepared? MCM (MCM). We provide unmatched experience Mike McGrady began his career as a Pittsburgh paramedic and worked

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE

More information

HEALTHCHOICES BEHAVIORAL HEALTH PRIMARY CONTRACTORS Point of Contact LEHIGH/CAPITAL

HEALTHCHOICES BEHAVIORAL HEALTH PRIMARY CONTRACTORS Point of Contact LEHIGH/CAPITAL Scott Suhring, CEO Capital Area Behavioral Health Collaborative, Inc. 2300 Vartan Way, Suite 206 Harrisburg, PA 17110 Email: ssuhring@cabhc.org HEALTHCHOICES BEHAVIORAL HEALTH PRIMARY CONTRACTORS Point

More information

PA Health Care Cost Containment Council Special Requests 1 X=text 9=numeric

PA Health Care Cost Containment Council Special Requests 1 X=text 9=numeric SYSID Record Identifier System assigned unique record sequence number AMBULATORY/OUTPATIENT PROCEDURE LAYOUT YEAR Processing Year 008-011 X(4) Year Special Requests 1 X=text 001-007 X(7) Unique code for

More information

($ millions) DRPA Rebuild PATCO Cars

($ millions) DRPA Rebuild PATCO Cars Delaware River Port Authority of Pennsylvania and New Jersey () Rebuild PATCO Cars DBNUM: DR046 This project will provide for the replacement of PATCOʹs existing car fleet, through complete rebuilding

More information

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6 Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-04 County: King List of 17-04 Amendment Projects:

More information

DESIGN CRITERIA MEMORANDUM

DESIGN CRITERIA MEMORANDUM State Route 49 Realignment Study DESIGN CRITERIA MEMORANDUM ATTACHMENT G SR 49 Realignment Study STATE ROUTE 49 El Dorado to Coloma El Dorado County, CA DESIGN CRITERIA MEMORANDUM Introduction The El

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-109 Description Page 201.0403 REMOVE AND DISPOSE SIDEWALKS 1 201.0407 REMOVE AND DISPOSE PAVEMENT

More information

BID ITEM WORKBOOK COSTARS-3 IT Hardware BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-3 IT Hardware BIDDER/CONTRACTOR DATA BID ITEM WORKBOOK COSTARS-3 IT Hardware BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: PA Legislative House District Number 6351 W

More information

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE Town of Putnam Valley, Putnam County February 7, 2018 1 2 MEETING AGENDA Introductions (5 minutes)

More information

Stopgap Budget -- Est. Major School District Subsidy Distribution

Stopgap Budget -- Est. Major School District Subsidy Distribution Stopgap Budget -- Est. Major Total $ 3,126,758,314 Bermudian Springs SD Adams $ 3,486,702 February Conewago Valley SD Adams $ 5,293,487 February Fairfield Area SD Adams $ 1,852,777 Gettysburg Area SD Adams

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Survey Objectives. The Future of the Pennsylvania Dairy Industry with the Impact of Natural Gas. Summer 2011 The Center for Dairy Excellence

Survey Objectives. The Future of the Pennsylvania Dairy Industry with the Impact of Natural Gas. Summer 2011 The Center for Dairy Excellence The Future of the Pennsylvania Dairy Industry with the Impact of Natural Gas Summer 2011 The Center for Dairy Excellence Survey Objectives To provide a clear understanding of the future of dairy farming

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors October 2016 Agenda 1. Safety 2. Schedule

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

PENNSYLVANIA VOLUNTARY FIREFIGHTER CERTIFICATION

PENNSYLVANIA VOLUNTARY FIREFIGHTER CERTIFICATION PENNSYLVANIA VOLUNTARY FIREFIGHTER CERTIFICATION 2013 EXAM SCHEDULE January 1, 2013 - December 31, 2013 Exam dates and levels of certification are grouped by Field Exam Sites both chronological and alphabetical

More information

ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer

ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer Professional Background Education M.S.C.E, Civil Engineering- Transportation, Villanova University, Villanova, PA, 2012 B.S.C.E., Civil Engineering, Villanova

More information

2014 BOND PROGRAM UPDATE

2014 BOND PROGRAM UPDATE 2014 BOND PROGRAM UPDATE Presented to the City Council By the City Manager s Office August 11, 2015 1 Topics Previous Debt Programs 2014 Bond Program o Goals o Funding Commitments o Progress Communication

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

Commonwealth of Pennsylvania Public Safety Answering Point (PSAP) Inventory Report

Commonwealth of Pennsylvania Public Safety Answering Point (PSAP) Inventory Report Commonwealth of Pennsylvania Public Safety Answering Point (PSAP) Inventory Report Submitted to the Pennsylvania Emergency Management Agency (PEMA) March 30, 2016 TABLE OF CONTENTS EXECUTIVE SUMMARY...

More information

STUDY REPORT #1 ADDENDUM

STUDY REPORT #1 ADDENDUM STUDY REPORT #1 ADDENDUM 1.0 PURPOSE OF ADDENDUM This document is an addendum to Study Report #1: Sub-System Planning Alternatives. The purpose of this addendum is to bridge the gap between the initial

More information

Kansas Division. January 31, 2018

Kansas Division. January 31, 2018 Division January 31, 6111 SW 29 th, Suite 100 Topeka, 66614 (785) 273-2600 (785) 273-2620 (fax) www.fhwa.dot.gov/ksdiv/index.htm Catherine M. Patrick, P.E. State Transportation Engineer Department of Transportation

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15, 2016 Open House Response to Comments

Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15, 2016 Open House Response to Comments Final Design Township of Lower Makefield, Bucks County, Pennsylvania Township of Ewing, Mercer County, New Jersey Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15,

More information

How to Read the TIP Amendment Project Lis ngs

How to Read the TIP Amendment Project Lis ngs How to Read the TIP Project Lis ngs The project lis ng is a complete list of all projects in the TIP amendment. The state is noted in the heading. Bistate projects are listed first, followed by Kansas,

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015

AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015 AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015 M N D O T B R I D G E S T A T E A I D Page 1 PS1 - Simple Span Prestressed I Beam Example (BrR 6.7.1) 1. From the Bridge Explorer create

More information

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION itization Project itization Rank Name Score 1 Transportation Plan Update 64.85 2 Signal Timing Optimization 54.15 3 Intelligent Transportation System (ITS)

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

Pennsylvania One Call System, Inc.

Pennsylvania One Call System, Inc. Pennsylvania One Call System, Inc. Bill Kiger President & CEO 412.464.7111 wgkiger@pa1call.org Pennsylvania One Call System, Inc. Our purpose is to prevent damage to underground facilities. To promote

More information

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event Bentley OpenRoads Workshop 2017 FLUG Fall Training Event F-1E - QuickStart using OpenRoads ConceptStation Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Practice Workbook

More information

STATE STREET CORRIDOR

STATE STREET CORRIDOR CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1 = 20'-0 ADD-002 ISSUED FOR: MB/GSB PW/R RESIDENCE O/R /R W/R W/R /R /R /R /R /R NMSD Site Improvements Phase Scale: " = 0'-0" 06.0.05 MB/GSB BO ISSUED FOR: 4-000 REF: C-306 W/R W/R W/RW/R W/R W/R W/R W/R FO ADD-00 SKC-049 W/R W FO T R NMSD Site

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

Paul DiGiacobbe, PE, DBIA MASER Consulting Ryan Putt, PE HNTB Corporation Kevin Poad, PE HNTB Corporation

Paul DiGiacobbe, PE, DBIA MASER Consulting Ryan Putt, PE HNTB Corporation Kevin Poad, PE HNTB Corporation Paul DiGiacobbe, PE, DBIA MASER Consulting Ryan Putt, PE HNTB Corporation Kevin Poad, PE HNTB Corporation Introduction Using LiDAR to Manage Safety Assets SPEED the acquisition phase is being performed

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2017 Agenda 1. Safety 2. Schedule

More information

Caltrans Connect Opt-In

Caltrans Connect Opt-In Caltrans Connect Opt-In Caltrans Connect: Connect Overview: Connect is a feature that lets you manage which projects you're interested in, lets you manage which projects you've opted in on, which projects

More information

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM Date of Meeting: May 2, 2017 # I-2 SUBJECT: Quarterly Metrorail Construction Status Report ELECTION DISTRICTS: Ashburn/Broad Run STAFF CONTACTS: Alan

More information

Bentley ConceptStation Workshop 2017 FLUG Spring Training Event

Bentley ConceptStation Workshop 2017 FLUG Spring Training Event Bentley ConceptStation Workshop 2017 FLUG Spring Training Event 430 - QuickStart using OpenRoads ConceptStation Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Practice

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

5,952 SF - 172,012 SF

5,952 SF - 172,012 SF 5,952 SF - 350 N. PENNSYLVANIA AVE. PENN BUSINESS CENTER WILKES-BARRE, PENNSYLVANIA VERY AFFORDABLE OFFICE & INDUSTRIAL SPACE JUST 1 MILE FROM THE CROSS VALLEY EXPRESSWAY (SR 309)! DIRECTIONS TO PENN BUSINESS

More information

The Piedmont Corridor

The Piedmont Corridor Richard E. Mullinax, PE, PTOE, CPM 27 March 2018 Piedmont Corridor Part of Federal Southeast Corridor 1992 Federal Railroad Administration designated Southeast High Speed Rail Corridor Important Freight

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

Overview September 7, 2017

Overview September 7, 2017 Overview September 7, 2017 Purpose The purpose of this presentation is to provide an overview of the changes to the required deliverables and workflow for developing plans and models for Illinois DOT projects

More information

Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc.

Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. ABSTRACT OF BIDS SAP 023-601-027 April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. Estimated 14070 Hwy 52S 2948 271st Ave. 2092 Hwy 9W Total

More information

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana March 2011 Prepared for: URS Corporation 2020 E. First Street, Suite #400 Santa Ana, CA 92705 Tel:

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

Section 7.I: Estimates Backup. 7.I Estimates Back-Up Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State

More information

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities - Central Corridor Rail-Volution - Weaving Transit into Existing Communities Management Committee, October 31, 2009 June Improving 11, 2008 mobility Easing congestion Strengthening our communities Twin

More information

Dakota County Transportation CIP Process Requests from cities/townships

Dakota County Transportation CIP Process Requests from cities/townships City of Apple Valley Letter: e-mail w/traffic Engineer City of Apple Valley Engineer coordinating CIP Project County Traffic Staff is in the process of assessing Requests directly with Dakota County Traffic

More information

INPUT DATA PROCEDURES

INPUT DATA PROCEDURES 79 SECTION 7 INPUT DATA PROCEDURES This section describes the forms and message boxes used to enter input data for an RSRAP optimization problem. These forms and message boxes implement Steps 1 through

More information

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic

More information

REDISCOVERING AN ENGINEERING MARVEL: SURVEYING THE DELAWARE, LACKAWANNA & WESTERN RAILROAD S CLARKS SUMMIT TO HALLSTEAD CUTOFF

REDISCOVERING AN ENGINEERING MARVEL: SURVEYING THE DELAWARE, LACKAWANNA & WESTERN RAILROAD S CLARKS SUMMIT TO HALLSTEAD CUTOFF REDISCOVERING AN ENGINEERING MARVEL: SURVEYING THE DELAWARE, LACKAWANNA & WESTERN RAILROAD S CLARKS SUMMIT TO HALLSTEAD CUTOFF Gerald M. Kuncio Byways to the Past Harrisburg, PA June 14, 2018 Between 1912

More information

Appendix D Supportive Transportation Materials

Appendix D Supportive Transportation Materials Appendix D Supportive Transportation Materials D.1. Stakeholder Input and Coordination As noted in Section 1.7 of the main Master Plan document, there have been several opportunities for stakeholders to

More information

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008 Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View Minnesota Pavement Conference February 14, 2008 1 The Situation 2 WSDOT policy, in essence, mandated use of BSTs

More information

Construction Projects Report Starting Oct 02-08, 2017

Construction Projects Report Starting Oct 02-08, 2017 Construction Projects Report Starting Oct 02-08, 2017 road closures Barthold Rd at Intersection of I35 Service Rd going West 700' will be closed (Jun 12-Oct 15) lane closures Street / Intersection Detour

More information

SWLRT Corridor Management Committee. November 26, 2018

SWLRT Corridor Management Committee. November 26, 2018 SWLRT Corridor Management Committee November 26, 2018 1 Today s Topics Approval of Minutes Chair s Update Getting Ready for Construction LONP Activities Communication & Outreach 2 Overall Project Schedule

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

Criteria: State: Indiana County: ALL COUNTIES ID #: All. Results: 363 records found.

Criteria: State: Indiana County: ALL COUNTIES ID #: All. Results: 363 records found. Criteria: State: Indiana County: ALL COUNTIES ID #: All Results: 363 records found. Name ID# Type Score Designation Date Update Date Adams CountyNo MUAs in this county. Allen County Southside Fort Wayne

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

Sewer System Capital Budget Process

Sewer System Capital Budget Process Sewer System Capital Budget Process Presentation to New Castle County Council Department of Special Services Committee Meeting Jason P. Zern, P.E. Operations Engineer March 1, 2016 1 Outline Review Asset

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

Users Guide for Estimation

Users Guide for Estimation Users Guide for Estimation Estimation Version 3.00/3.01 October 2017 [Type here] Phone: (352) 381-4400 Fax: (352) 381-4444 info@infotechfl.com www.infotechfl.com AASHTOWare is a registered trademark and

More information

ATTACHMENT 3 UTILITY INFORMATION

ATTACHMENT 3 UTILITY INFORMATION ATTACHMENT 3 UTILITY INFORMATION about:blank Page 1 of 2 4/28/2017 CDC 00000 POCS MM/DD/YY TT:TT:TT 20170931228-000 NEW XCAV DSGN ============PENNSYLVANIA UNDERGROUND UTILITY LINE PROTECTION REQUEST============

More information

Prime Contractor DBE Solicitation Effort Help Guide

Prime Contractor DBE Solicitation Effort Help Guide Bureau of Clean Water Prime Contractor DBE Solicitation Effort Help Guide The DBE solicitation process does not require you to hire a certain number of DBE firms and does not have goals. The purpose of

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

COMMISSION POLICY POLICY #9.16

COMMISSION POLICY POLICY #9.16 COMMISSION POLICY POLICY #9.16 SUBJECT: Public Right-of-Way Encroachments and Regulations for Mailboxes and Newspaper Delivery Boxes DATE ADOPTED PAGE (BCC MINUTES) February 19, 2008 Page 26 OBSOLETE VERSIONS

More information

COUNTY

COUNTY Retail employment and wages, 2000- (private) CPI -> 1.09698 1.09698 pop % pop of dollars total chg 2000- avg ann chg 2000- in county county in CD in 2000 2000 Cochise AZ8 County 117,755 117,755 100.00%

More information

Corridor Management Committee. January 14, 2016

Corridor Management Committee. January 14, 2016 Corridor Management Committee January 14, 2016 1 Today s Topics 2 Regional METRO System Overview 2016 Project Overview: Key Activities and Milestones Municipal Consent Schedule Design Resolution Schedule

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

Summary Listing of Ohio LTAP elearning Courses

Summary Listing of Ohio LTAP elearning Courses Summary Listing of Ohio LTAP elearning Courses In recent years, the Ohio Local Technical Assistance Program (LTAP) Center has added many online courses also called elearning, or Web-based training (WBT)

More information

LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys

LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys 2 I. What is LiDAR? II. Benefits of LiDAR III. PennDOT Case Studies IV. Best Practices/Lessons Learned V. Questions 3 4 LiDAR for Engineering

More information

NCHRP Project Median Cross-Section Design for Rural Divided Highways

NCHRP Project Median Cross-Section Design for Rural Divided Highways NCHRP Project 22-21 Median Cross-Section Design for Rural Divided Highways Acknowledgements NCHRP Projects Officer, Ray Derr Project Team Midwest Research Institute PI Jerry Graham Pennsylvania Transportation

More information

ITS Wisconsin Transportation Conference October 23, 2018

ITS Wisconsin Transportation Conference October 23, 2018 ITS Wisconsin Transportation Conference October 23, 2018 1 2 3 FACILITY HIGHLIGHTS Skidpad VDA Main Campus Handling Courses North Campus 7.5 Mile Oval 4 NORTH CAMPUS HIGHLIGHTS Emissions Laboratory Impact

More information

Geometric Layout for Roadway Design with CAiCE Visual Roads

Geometric Layout for Roadway Design with CAiCE Visual Roads December 2-5, 2003 MGM Grand Hotel Las Vegas Geometric Layout for Roadway Design with CAiCE Visual Roads Mathews Mathai CV32-3 This course describes and demonstrates various tools for defining horizontal

More information

APPENDIX E. Expenditures by Department

APPENDIX E. Expenditures by Department APPENDIX E Expenditures by Department 199 AIRPORT 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal

More information

2017 ANNUAL REPORT

2017 ANNUAL REPORT INFRASTRUCTURE UPGRADES ECONOMIC DEVELOPMENT PUBLIC SAFETY IMPROVED APPEARANCE 2017 ANNUAL REPORT www.stonemountaincid.com Stone Mountain Community Improvement District BOARD OF DIRECTORS Chairman Joe

More information

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM PPM #17, 2003 SUBJECT: Mailbox Installation in County Rights of Way Problem: Highway and roadside safety is the primary reason

More information

ADDENDUM NO. 03. Include this signed and dated addendum to your proposal.

ADDENDUM NO. 03. Include this signed and dated addendum to your proposal. ADDENDUM NO. 03 To City of College Park RFP PD 051514 - MMSCN ADVERTISEMENT for MONITORING & MAINTENANCE OF SURVEILLANCE CAMERAS & NETWORK Please note the following additions/changes to this bid. Include

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

Medically Underserved Areas/Populations (MUA/P) And Primary Care Health Professional Areas (HPSA) May, 2010

Medically Underserved Areas/Populations (MUA/P) And Primary Care Health Professional Areas (HPSA) May, 2010 Allen Southside Fort Wayne SA 955 MUA CTs 11, 15, 17, 18, 20, 21, 27-30 53.5 Allen Fr. Wayne-Inner City 1189991855 Geographic CTs 11-18, 20, 21, 23, 25-27, 29-31, 40 9 Allen Neighborhood Health Clinics,

More information

Bankruptcy filing pop % pop of weighted by county's rate per 1000 in county county in CD in County

Bankruptcy filing pop % pop of weighted by county's rate per 1000 in county county in CD in County Bankruptcy, to CD Bankruptcy filing pop % pop of weighted by county's rate per 1000 in county county in CD in filing rate per 1000 share of CD chg 2000- COUNTY district pop district county 2000 2004 2000

More information

APPENDIX F. Expenditures by Year

APPENDIX F. Expenditures by Year APPENDIX F Expenditures by Year 209 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal 90% 2,700,000 3,000,000

More information