OSS Interface Change Management Meeting April 12, 2005

Size: px
Start display at page:

Download "OSS Interface Change Management Meeting April 12, 2005"

Transcription

1 OSS Interface Change Management Meeting April 12, :00 AM 2:00 PM 1095 Avenue of the Americas, New York, NY Floor 15, Room Dial-In: (800) Agenda I. Welcome and Introductions (Jean Derrig) II. Special Projects (10:00 11:30) CMP Document (Beth Cohen/Peggy Rubino) LSOG 5,6 Sunset/LSOG 9 Implementation (Carol Yozzo/Susan Pistacchio) CABS Consolidation (Daniel Duris) End User Listing Project (Carol Yozzo) FTP Report Migration (Susan Pistacchio) Provider Notification Report (Carol Yozzo) Old LSI Retirement (Carol Yozzo) III. Departmental Discussion (11:30 11:45) WCCC Update (Nik Umrani) Training/Website Enhancements (Stephen Cuttle) IV. Change Control Items By Release (11:45 12:00) LUNCH V. PWG (1:00 2:00) Deferred from last month C Have multiple OCLs on the same BAN on a per LATA basis. (T5) C Provide access to resold Customer Service Records via EDI. (T5) C Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order. (T5) New Type 5 C Return Non-Pub or Non-List directory information on the DLR or CSI/CSR C Bill circuits by the States they service to the correct state BAN. C Create a simple system for requesting "aerial to burial" loop changes. C Integrate the validate collocation assignment step process. C Allow record order service address changes due to local government adjustments. C Allow a voice port without contacting the data provider when DSL is present. New Type 4 C Add Voice Mail Access Numbers to Wholesale Pre-Order Transaction C Query CLEC for invalid BAN1 or BAN2 entries on listing requests C Flowthru ACT=N With Ported in TN C Modification to LVR ( Listing Verification Report) East Process.

2 OSS Interface Change Management Meeting Summary Topic # 1 Discussion 67 CLEC to CLEC Migration 3/14/00 - CLEC to CLEC migration is a difficult task. The CLEC s expressed great concern with the sharing of customers CSR between them. - BA to hold a workshop in the first week of April. 4/11/00 - Several sessions are being held now on CLEC to CLEC migration within BA - Workshop scheduled for 5/16/00-5/9/00 - Workshop was held on 5/16. Workshop covered moving an end-user customer from one CLEC to another CLEC s requested Listings be discussed at the workshop - PSC attended the workshop as requested by the CLEC community - A workshop will be scheduled 6/13/00 - A CLEC to CLEC workshop was held on 6/26/00 10/8/02 - VZ recommends closing. CLEC recommends this topic remain open since NY State recently opened Phase 3 of the CLEC to CLEC migration proceedings 1/14/03 - Verizon requests closure or clarification of issue Page 2 of 60 February 2005 CMP Meeting

3 OSS Interface Change Management Meeting Summary Topic # 1 Discussion 3/11/03 - CLEC community requests a recap or summary of all change requests associated with CLEC to CLEC conversion listed here. The following Change Requests have either been completed or are pending that impact CLEC to Migrations. - CR IT# Flow Through SUP 2 for change of date due, North and South, all services.- Completed 12/ CR1187/1411-IT# Allow Level 5 Flow-Through on a Platform CLEC to CLEC migration- Completed 6/ CR IT# Process CLEC to CLEC Migration As Is at Level 5 - Completed 2/ CR IT# End User Level Listings Account - Phase 9- Candidate 4/ CR IT# CLEC to CLEC Migrations (Phase 1) - Committed 6/ CR IT# CLEC to CLEC Migrations Provider Notification (phase 2) Committed 6/ CR IT# Type 5 - Enhance xdsl Migration-Requirements will be worked with CR IT# Line share CTX FT VZ North- Not Scheduled - CR IT# Hot Cuts for xdsl Loops - Candidate 10/ CR IT# AOS Form for CLEC to CLEC Migrations - Not Scheduled 8/5/03 - CR IT# End User Level Listings Account - Phase 9- Committed 8/ CR IT# CLEC to CLEC Migrations (Phase 1) - Completed 6/ CR IT# CLEC to CLEC Migrations Provider Notification (phase 2) - Completed 6/ CR IT# Type 5 - Enhance xdsl Migration-Requirements will be worked with (Phase 4 Not Scheduled) - CR IT# Line share CTX FT VZ North- Completed 7/ CR IT# Hot Cuts for xdsl Loops - Candidate 4/ CR IT# AOS Form for CLEC to CLEC Migrations - Not Scheduled Page 3 of 60 February 2005 CMP Meeting

4 OSS Interface Change Management Meeting Summary Topic # 1 Discussion 1/13/04 Updates made to 8/5/03 to reflect change in status: - CR IT# End User Level Listings Account - Phase 9- Completed 8/ CR IT# Type 5 - Enhance xdsl Migration-Requirements will be worked with Completed October CR IT# Hot Cuts for xdsl Loops Completed October CR IT# AOS Form for CLEC to CLEC Migrations withdrawn and referred to Customer User Forum Update made to reflect December discussion of line share, line split and loop split migration scenarios. CLECs were asked to provide consensus input on pending Type 5 initiatives involving migration. CLECs provided Verizon with the following guidance. This chart represents all the potential migration scenarios discussed at the Verizon East Change Management meeting on December 9, Some of these are not currently supported with change requests. Some of the CRs represented here have not yet been rated by the industry and are so noted. A few of these were raised during the CMP meeting and were listed as potential requirements but have no CR supporting them. The CLECs undertook this effort still believing Verizon should act on the priority established in the CMP process, yet understanding that Verizon s request was intended to focus the available Verizon resources on highly rated CRs of a similar nature. This list represents a consensus among CLECs and also details the synergies that CLECs believe exist within the scenarios. These synergies are represented as notations in the Other column. The CLECs request Verizon convene a conference call if there are any required clarifications or if Verizon recognizes that the synergies represented by the CLECs do not exist. Note: Format of chart altered to fit available space. Page 4 of 60 February 2005 CMP Meeting

5 OSS Interface Change Management Meeting Summary From To What Changes Other Slide # 1 Line Sharing Line Splitting Change Voice and Data Single LSR CR CO (accomplishes priority 14 and 15 as a subset of this change) C VZW 2 POTS Service Line Splitting Change Voice and add Data Single LSR CR CO (will achieve Priority #3 and #8) C VZW 9 3 No Service Line Splitting Add Voice and add Data Single LSR CR CO (see Priority #2) C in VZW 4 POTS Service Digital or xdsl Loop Hot Cut & Reclassify Loop CR C POTS UNE Loop Digital or xdsl Loop Reclassify Loop Simultaneously with Hot Cut on single LSR 8 8 3

6 OSS Interface Change Management Meeting Summary 1/13/04 Other Notes: CR CO asks for acceptance of an LSR with Pending Activity. Covad discussed this with Verizon some time ago. The problem was the initial activity was instituted on the retail side, e.g., a customer moving in the same central office district. The result is the data provider gets a loss notification at the time of the move. The inherent problem here is a process problem. Should the retail side be forced to direct the end user to their data provider when they request a move from Verizon? If an end user calls Verizon to move when they have voice service from another carrier what happens? In meeting status, including the Loop Share Product there are 16 scenarios under review. Items 4,5,6 are currently under trial with one CLEC evaluating manual processes to reclassify analog to digital. Action items resulting from discussion include: - VZ request forecast of pent up and normalized demand for reclassify activity to assess need to automate the reclassify process. CLECs are requested to send the forecast to CMP. - CLECs request information on manual process that includes explanation of manual process and job aids - Broadview requested inclusion in manual pilot Items 7,11,12 and new loop share product are under review with goal of deploying in Group discussed product name because of differences between regulatory and CMP terms. Reference to Qwest Loop Split product was recommended. Items 1,2,3 are under review. Initial assessment considered large and complex with no commitment. CLECs encouraged Verizon that scope of line split scenarios not overly broad that line share or loop share scenarios. Items 8,9,10, 14,15 have not yet been reviewed. 2/10/04 The current status per initiative is reported per above. Verizon considers the Analog to Digital or xdsl loop was provisioned in October 2003 (#4). CLEC interested in the manual process in #5 and #6 are to contact CMP. Initial assessment of #8, 9, 10, 13,14 & 15 to be provided in April. 3/9/04 The February status remains the current status for the March CMP meeting, with the following exceptions. On February 11, three additional Type 5 change requests were received from Covad. These enhancements to be reviewed at the March CMP meeting. C Single LSR to migrate from Line Splitting to xdsl Capable Loop C Single LSR to move from LineShare to xdsl Capable Loop C Single LSR to move from UNE-P to xdsl Capable Loop

7 OSS Interface Change Management Meeting Summary April 13, 2004 June 20, 2004 Shared UNE Loop Product CR , C and C Scenario 7 Committed for June 04 A Phase 2 of the above was created to add flow through of these order types Candidate Aug 22, 2004 Single LSR for voice and Data Migration C Scenario 1 Candidate October 04 Single LSR to Re grade analog to digital C Scenario 7 Candidate October 04 Single LSR to Migrate Voice and Data C Scenario 2- Candidate October 04 Convert analog to digital via hot cut C Scenario 4- Candidate October 04 Shared UNE Loop product C Candidate October 04 Shared UNE Loop Product CR , C and C Scenario 7 Completed June 04. A Phase 2 of the above was created to add flow through of these order types Candidate Aug 22, 2004 Single LSR for voice and Data Migration C Scenario 1 Candidate October 04 Single LSR to Re grade analog to digital C Scenario 7 Candidate October 04 Single LSR to Migrate Voice and Data C Scenario 2- Candidate October 04 Shared UNE Loop product C Candidate October 04 Convert analog to digital via hot cut C Scenario 4- Candidate June /9/04 Single LSR for voice and Data Migration C Scenario 1 Not Scheduled. Single LSR to Re grade analog to digital C Scenario 7 Not Scheduled. Single LSR to Migrate Voice and Data C Scenario 2- Completed October 04 Shared UNE Loop product C Not Scheduled. Convert analog to digital via hot cut C Scenario 4- Not Scheduled.

8 OSS Interface Change Management Meeting Summary 1/11/05 From To What Changes CR # Status Other Information 1 Line Sharing Line Splitting Change Voice and Data 2 POTS Service Line Splitting Change Voice and add Data 3 No Service Line Splitting Add Voice and add Data C (E) C (W) Not Scheduled C (E) C (W) Implemented Oct'04 Single LSR, accomplishes priority 14 and 15 as a subset of this change Single LSR (will achieve Priority #3 and #8) C (E) C (W) Implemented Oct'04 Single LSR (see Priority #2) 4 POTS Service Digital or xdsl Loop Hot Cut & Reclassify Loop C (E) Pending requirements 5 POTS UNE Loop Digital or xdsl Loop Reclassify Loop C (E) Pending requirements Simultaneously with Hot Cut on single LSR 6 POTS UNE Loop Digital or xdsl Loop Reclassify Loop Post Migration 7 Line Sharing Loop Sharing Change Voice Provider 8 UNE-L Line Splitting Change Voice Provider C (E) Pending requirements C (E) C (W) Implemented Oct'04 Implemented Jun'04 After Hot Cut (implement C and this gets done) From UNE-L to UNE-P as Hot Cut (no CR issued to support this should be enabled by Priority #2) 9 Loop Sharing Line Splitting Change Voice Provider C (E) C (W) Implemented Oct'04 Implemented Jun'04 10 Retail Voice/Data DRL Voice becomes resale C (E) Pending requirements 11 Loop Sharing Loop Sharing Change voice Same Data 12 Line Splitting Loop Sharing 13 Line Splitting Resold Voice and CLEC Data UNE-P to Facilities based voice, same data C (E) C (W) Pending requirements C (E) C (W) Implemented Oct'04 Implemented Jun'04 Done as Voice Hot Cut to UNE-P Voice once C is implemented. requires C as prerequisite requires C as prerequisite UNE-P to Resold Voice, same data Reclassify Voice Service 14 Line Sharing Line Sharing Change Data Provider C (W) Not Scheduled Single LSR 15 Line Splitting Line Splitting Change Data Provider C (E) C (W) Not Scheduled Single LSR

9 OSS Interface Change Management Meeting Summary 3/08/05 From To What Changes CR # Status Other Information 1 Line Sharing Line Splitting Change Voice and Data 5 POTS UNE Loop Digital or xdsl Loop Reclassify Loop C (E) C (E) C (W) Not Scheduled Pending requirements Digital or xdsl 6 POTS UNE Loop Loop Reclassify Loop Post Migration C (E) Pending requirements Pending 10 Retail Voice/Data DRL Voice becomes resale C (E) requirements 11 Loop Sharing Loop Sharing Change voice Same Data 13 Line Splitting Resold Voice and CLEC Data C (E) C (W) Pending requirements Single LSR, accomplishes priority 14 and 15 as a subset of this change Simultaneously with Hot Cut on single LSR After Hot Cut (implement C and this gets done) requires C as prerequisite UNE-P to Resold Voice, same data Reclassify Voice Service 14 Line Sharing Line Sharing Change Data Provider C (W) Not Scheduled Single LSR 15 Line Splitting Line Splitting Change Data Provider C (E) C (W) Not Scheduled Single LSR 69 PONTRONICS 6/13/ Mettel has submitted a Type 5 change requesting functionality that is similar to PONTRONICS. Mettel feels that the system they are proposing would be a better choice Mettel would like a phased approach and easy availability to this system if implemented - AT&T would like BA Help Desk to have tools such as this to help limit trouble ticket turnaround time 08/08/00 - BA will look into scheduling a meeting on PONTRONICS 73 Prioritization Process Documentation 11/14/00 - CLECs would like a meeting to further discuss Pontronics with respect to a similar Change Request submitted by Mettel. - BA advised that when a meeting is scheduled, the CLEC community will be notified. 10/8/02 - VZ awaiting resolution. 1/14/03 - CMP Team cross relating issue with pending T5 to identify next step 2/11/03 - Verizon requests clarification of issue or closure. CLEC community object closure 8/08/00 - A workshop has been scheduled for September 8 th to discuss and document the prioritization process. There will be 3 CLECs attending the meeting as volunteers to review and provide feedback to the initial process document. Volunteers are Claudia Dressler, AT&T, Elliot Goldberg, Mettel, Tyra Colbert, MCI. 9/12/00 - A meeting was scheduled to discuss the prioritization process on 9/20/00 2/6/01 - BA recommends closing. 3/6/01 - BA recommends closing. Closing was not addressed at ICC Mtg held on 2/13/01 3/13/01 - CLECs request this item remain open 10/8/02 - VZ recommends closing. CLECs request a specific tie to a regulatory requirement in order for a change to be considered a Type 2. Item remains open pending Verizon investigation

10 OSS Interface Change Management Meeting Summary 2/11/03 - Verizon introduced DENY status for T5 change requests. The ability for Verizon to deny a T5 is not part of the CMP Agreement. Language supporting a Deny status needs to be addressed by a working group along with prioritization of Vz initiated change request as Type 1, Type 2, or Type 4. The use of DENY at this time indicated the CR is still open, but not being actively pursued for development. 4/18/03 - At the April CMP meeting, April 17 was selected as a meeting date to continue the discussion. On April 17 meeting notes were issued. The Agreement was reached to pursue action on the following items as part of the current CMP meeting schedule. The PWG session may extend when necessary to address these concerns. The following action items will be reflected in Topic #73. - Verizon to provide a detailed explanation for each T5 CR with a current status of Denied at the next CMP meeting. Verizon committed to revisit each initiative and to provide a more detailed explanation on why the CR is inactive. - CLECs agree to evaluate the explanation given and to either withdraw or escalate the CR. - CLECs agree to validate the importance of CRs and to withdraw any unnecessary enhancements. - CLECs request clarification of change requests types and continue to challenge the assignment of Type 2 when the flow through metric is being exceeded. The Type 2 designation should include a rationale. - CLECs expect a status of T5 CRs every month. - CLECs expect a 12 month rolling development schedule - CLECs expect a return to the former process of reviewing requirements associated with pending T5. 5/13/03 - PWG Requirements Review Session scheduled and conducted on May 21, /8/03 - Prioritization process discussed as Agenda Item at the request of the NY PUC staff. Discussion resulted in CLEC community agreeing to draft and revise new language for submission to Verizon at the August CMP meeting. 8/12/03 CLEC community submitted changes to Verizon via . The proposed new language was reviewed at the meeting. Verizon will provide a word document of the April 2001 CMP Agreement. The CLEC community will insert the proposed language in redline format. The redline version will be distributed to the CMP distribution list. Verizon to provide questions or comments at the September CMP meeting.

11 OSS Interface Change Management Meeting Summary 1/13/04 Updates to Topic 73 to reflect 4Q04 activity on this topic. September Verizon responds to CLEC suggested language. See CMP transcript. October Verizon provides additional language based on prior meeting. See CMP transcript. November Verizon clarifies additional language. See CMP transcript. December Verizon to produce redline version of CMP Agreement to memorialize agreements for January CMP meeting In meeting discussion, CLEC were disappointed with non delivery of redline. A commitment to distribute the redline by Jan 27 was made. This would allow CLEC input prior to Feb CMP meeting. 3/4/2004 Verizon s redline of CMP Agreement was distributed to CLEC community on January 28 th. On February 12 th a conference call was held to continue the discussion. CLECs to provide additional language to Verizon by February 27 th. A second call is scheduled for March 5. 4/23/04 Verizon distributed a revised redline of Section III regarding the Type 2 classification definition which reflected the discussion at the April 13, 2004 Change Management Meeting and which Verizon believed addressed the outstanding language issue. The CLECs were to collaborate on the proposed revision prior to the discussion at the May 11 Change Management meeting. 5/11/04 At the CMP meeting, the CLECs informed Verizon that they would not be discussing anything further on the document as one CLEC had sent a letter to the NY PSC asking for mediation. 6/8/04 In its response to a complaint about several Type 2 projects, the NY PSC clarified its position on Type 2 changes and advised the parties that it was not necessary for the PSC to be involved formally in ongoing efforts to revise the CMP document language. Verizon agreed to provide the next draft incorporating the statements of the NY PSC with the progress already made by the parties. 74 Wholesale Provisioning Tracking System (WPTS) 3/8/05 CLECs have requested to table the LSOG topic. CLECs will provide CLEC type 2 write up. 10/8/02 - VZ recommends closing. CLEC advised that the WPTS process for new loop was not in place and that this item should remain open pending resolution. VZ will have WPTS SME discussing status during Nov 12, 2002 CMP meeting. 1/14/03 - Awaiting confirmation of new loop WPTS capability 4/8/03 - The ability to status a new loop order in WPTS is targeted for June /8/03 - The New Loop capability was not added. Prospects are uncertain.

12 OSS Interface Change Management Meeting Summary 1/13/04 - The new loop capability is being internally tested. Deployment will include a CLEC test prior to full deployment. 85 End User Level Listing Project 5/13/03 - This issue was created at the May CMP meeting to provide a reference point for the many phases associated with this project. 07/8/03 - UNE Loop Listings will be converted to End User Listing Account with Class of Service LXR (residence) and LYB (business). This will provide a retail-like listing structure. - This project will be phased across the jurisdictions and includes BETA conversions. MD, DC and VA Beta conversions were completed in April and June releases. The remainder of MD, DC, VA and WV is scheduled for October 2003, - NY, MA, RI, NH, RI CT and VT Beta conversions are scheduled for August The remainder of conversion in those stated is scheduled in a phased approach between September 2003 and January NJ, PA and DE beta conversions are scheduled for October 2003, the remainder of conversions in those states is scheduled in a phased approach between November 2003 and March /13/04 Updated status - This project will be phased across the jurisdictions and includes BETA conversions. - MD, DC and VA Beta conversions completed in April, June and October 03 releases. - CLECs with MD, DC, VA and WV DL only scheduled for conversion Feb NJ, PA and DE beta conversions are rescheduled for Feb 04. Remaining NJ, PA, and DE conversions scheduled to begin April 04 - North (NY, MA, RI, NH, RI CT and VT) Beta conversions scheduled for March 04. Remaining conversions scheduled to begin May 04 3/9/ NJ, PA and DE beta conversions are rescheduled for March 04 from February. Remaining NJ, PA, and DE conversions scheduled to begin April 04 - North (NY, MA, RI, NH, RI CT and VT) Beta conversions scheduled for April 04. Remaining conversions not currently scheduled 4/13/04 - DE, NJ, PA beta phase 8 complete

13 OSS Interface Change Management Meeting Summary 6/16/04 - NJ, PA, DE Full conversion in progress. CLECs affected by fgte PA Conversion are being converted first. - North (NY, MA, RI, NH, RI CT and VT) Beta conversions scheduled for August 04. Remaining conversions will follow Beta. 8/14/04 - End User Listing conversion for CLECs affected by PA fgte Conversion has been completed. - Remaining NJ, PA, DE CLECs are in process of being converted. As of 8/27/04, conversion is just over 60% complete. All NJ, PA, DE CLECs are targeted for conversion by 9/30/04. - North (NY, MA, RI, NH, RI CT and VT) Beta conversion has been rescheduled for October 04. All eligible listings in NJ, PA, DE have been converted. North (NY, MA, RI, NH, RI CT and VT) Beta conversion is targeted for December, /14/04 North (NY, MA, RI, NH, RI, CT and VT) Beta conversion has been moved to Target date not yet available. 1/11/05 North (NY, MA, RI, NH, RI, CT and VT) Beta conversion target March Notification of Verizon Declared Emergency Conditions 2/8/05 North (NY, MA, RI, NH, RI, CT and VT) Beta conversion target March Beta conversion may take up to a month. Beta CLEC target readout at CMP Meeting May Full conversion target June /12/03 - CLECs reported two situations in July and early August where due date assignment into New York was suspended because of a Verizon declared emergency condition. CLECs asked for clarification as to 1) the media Verizon uses to notify the CLEC community of these changes, 2) additional information on the treatment of pipeline LSRs impacted by the emergency and 3) the use of unique error messages or response codes during emergency. 1/13/04 - Facility based providers should be participating in Federal and State emergency management plans and receive direct

14 OSS Interface Change Management Meeting Summary notification when a multi state, state, regional emergency situation is declared. Resale providers must monitor local conditions for the states they provide service. Restoration of service follows TSP guidelines with provisioning of new service suspended until service is restored. - Weather related local conditions are communicated via the jeopardy notification process. In meeting discussion, CLEC consider the communication of local, regional and national emergencies mutually beneficially especially to reduce incoming calls for status and escalation during the condition.

15 April 2005 Items by Release Report Release CR # / Initiative #/ Description of Change Request CR Type Data Added Page 15 of 60

16 April 2005 Items by Release Report Release CR # / Initiative #/ Apr 17, 2005 C Committed Moved from February 05 Description of Change Request CR Type Data Added Title: FTP Report Migration Description: Move reports on current FTP Report platform to a new platform that will eliminate storage, support, and maintenance issues. Impacted reports included: Provider Notification - VZ E (LLR Prod only) Listing Verification Report - VZ E and W CSR over 10K - VZ Ends Report - VZ E SAG - VZ E PSA - VZ E USOC to English VZ E DSL Extract VZ E 4 10/12/04 Project Timeline for Report Transition: Date Milestone Late April CLEC Workshop/Training to review ID process and report retrieval 5/2/05-5/13/05 BETA Testing Period May 16, 2005 Registration letter distributed including CLEC specific authorization code and other required information to establish new user ID and password. 5/16/05- Sign up period 6/17/05 CLECs should initiate new ID process upon receipt of letter. CLECs can begin using new process upon receipt of new user ID and password. 6/20/05- Parallel Operational User period 7/15/05 June 24, 2005 Notification sent to CLECs advising of FTP retirement in 2 weeks. July 15, 2005 FTP access for designate reports retired Business Narrative: Move reports on current FTP Report platform to a new platform that will eliminate storage, support, maintenance, data privacy and security issues. Reason: System Enhancement Ranking: 5 Process: Pre Order, Ordering Jurisdiction: North & South ; System: Primary Area: Other; LSOG Version: N/A Initiator: Susan Pistacchio, Verizon, 2/27/04 Page 16 of 60

17 April 2005 Items by Release Report Release CR # / Initiative #/ Apr 17, 2005 C Description of Change Request CR Type Data Added Title: Query CLEC When End User's Listing Already Exists 4 1/11/05 Committed Description: When a duplicate listing is found for the TN matching the request submitted by the CLEC, VZ will send a query to the CLEC advising of the duplicate listing. Reason: Improve Flowthrough Process: Ordering Jurisdiction: South Transaction: LSR Systems: LSI, EDI Primary Area: UNE Documentation: Ordering Error Codes Rating 3.4 Jun 19, 2005 C Initiator: Steve Manion, Verizon Title: Accept EBD for NP 2 2/8/05 Committed Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and VA. This phase will address implementing a new edit to ensure that the effective bill date provided is within 3 business days of the due date. This is required when the CLEC sends in a LSR and the Due Date interval is shorter than the required Due Date. Reason: The NY PSC Case 01-C-0095 footnote 104 and Virginia CC Docket No specifies that Verizon should cease billing the customer at the time the port actually takes place. Jurisdiction: North & South; System: LSI, EDI; Primary Area: UNE, LSOG Version: 5 and above Documentation Impact: LSOG 5 & 6 Order Business Rules Page 17 of 60

18 April 2005 Items by Release Report Release CR # / Initiative #/ Jun 19, 2005 C Description of Change Request CR Type Data Added Title: Add STATE field to Provider Notification Report 4 2/8/05 Committed Description: The purpose of this initiative is to add the STATE field to the Provider Notification Report (Line Loss). Note: The field addition is only to the LLRProd file. Process: Other Jurisdiction: VZ East Transaction: LSR Systems: Other Primary Area: Resale, UNE P, UNE Documentation: Ordering Business Rules Rating: 3.8 Jun 19, 2005 C Initiator: Susan Pistacchio, VZ Title: Modify DDPS Form 4 2/8/05 Committed Description: The purpose of this initiative is to update the DDPS form, which is designed to be used for ordering of DID, DOD, and PBX. Business rules changes and edits are being implemented to add clarity and allow CLECs to start using the form in place of the RS and PS form when ordering DIDs Reason: Business rules deficiencies brought to our attention by AT&T on the DDPS form. The entire form is being evaluated and changes made accordingly in order to add clarity to form. Process: Ordering Jurisdiction: VZ East Transaction: LSR Systems: LSI, EDI Primary Area: Resale, UNE, UNE P Documentation: Ordering Business Rules LSOG: 5 & above Rating: 3.6 Initiator: Susan Pistacchio, VZ Page 18 of 60

19 April 2005 Items by Release Report Release CR # / Initiative #/ Jun 19, 2005 C Description of Change Request CR Type Data Added Title: Verizon DSL over Resold Lines - Migration 2 3/8/05 Committed Description: Allow Verizon DSL and CLEC DSL over Resold Lines when migration is occurring from Verizon voice to CLEC Resold Line and Verizon Data already exists. Reason: MD Case PSC-8927 Order # Process: Ordering Jurisdiction: MD Transaction: LSR Systems: LSI, EDI Primary Area: Resale Documentation: Ordering Business Rules LSOG: 5 & above Jun 19, 2005 C Initiator: Susan Pistacchio, VZ Title: Sunset LSOG 5 EAST 3 2/8/05 Committed Description: Verizon currently supports LSOGs 5 and 6 and plans to implement LSOG 9 in October The purpose of this initiative is to establish an edit that will reject LSOG 5 requests with due dates after the October release date. LSRs with a DD after the October Release date would have to be submitted in LSOG 6 or LSOG 9 once it is implemented. Process: Ordering Jurisdiction: VZ East Transaction: LSR Systems: LSI, EDI Primary Area: Resale, UNE P, UNE Documentation: Ordering Business Rules Initiator: Susan Pistacchio, VZ Page 19 of 60

20 April 2005 Items by Release Report Release CR # / Initiative #/ Jun 19, 2005 C Description of Change Request CR Type Data Added Title: Prohibit New Listings on BAN Accounts 4 4/12/05 Committed Description: This initiative will add edits to prohibit the CLECs from adding new listings to the BAN Accounts. All new listings should be established as LWR/LYB accounts unless Toll Free. Reason: After the implementation of the End User Listing Project, the edit will prohibit CLECs from add listings to the BAN Accounts. Process: Ordering Jurisdiction: VZ East Transaction: LSR Systems: LSI, EDI Primary Area: UNE Documentation: Ordering Business Rules Rating: 3.8 Jun 19, 2005 C Initiator: Susan Pistacchio, VZ Title: Platform/Resale edit to return SUP on/after DD. 4 3/8/05 Committed Description: Currently all supplemental LSRs that are received on/after the DD are dropped to the NMC to be manually returned to the CLEC, with the exception of those LSRs in JEOP status. This initiative will automate the process of returning the invalid supplemental LSRs directly to the CLECs. The SUPs received for JEOPs will be processed as usual. Process: System Enhancement Jurisdiction: North & South Transaction: LSR Systems: LSI, EDI Primary Area: Resale, UNE P Documentation: Ordering Business Rules Rating: 2.7 Initiator: Steve Manion, VZ Page 20 of 60

21 April 2005 Items by Release Report Release CR # / Initiative #/ Jun 19, 2005 C Description of Change Request CR Type Data Added Title: BAN Editing on JB Requests 4 3/8/05 Committed Description: Query CLEC when BAN field on the LSR is populated with "N" on REQTYP JB, ACT D and query CLEC when BAN provided is for the listing account that cannot be disconnected. Reason: System Enhancement. Process: Ordering Jurisdiction: VZ East Transaction: LSR Systems: LSI, EDI Primary Area: UNE Documentation: Ordering Business Rules Rating: 3.5 Jun 19, 2005 C Initiator: Steve Manion, VZ Title: Query Resale for incorrect or missing class of service USOC(s) 4 4/12/05 Committed Description: The purpose of this initiative it to reject Resale ACT N, V, W if class of service USOCs are not populated in the feature detail for all lines, if USOCs are for incorrect market segment (i.e. RRM or RBM Platform USOCs are used in error) or if class of service USOCs and TOS do not match... Reason: System Enhancement. Process: Ordering Jurisdiction: VZ East Transaction: LSR Systems: LSI, EDI Primary Area: Resale Documentation: Ordering Business Rules Rating: 3 Initiator: Steve Manion, VZ Page 21 of 60

22 April 2005 Items by Release Report Release CR # / Initiative #/ Jun 19, 2005 C Description of Change Request CR Type Data Added Title: Validate and query for ACTL match to CLEC CCNA 4 3/8/05 Committed Description: Validate the 11 character ACTL against the CCNA to ensure the ACTL is correct for the CLEC submitting the request and is spelled correctly.. Reason: System Enhancement. Process: Ordering Jurisdiction: VZ South Transaction: LSR Systems: LSI, EDI Primary Area: UNE Documentation: Ordering Business Rules Rating: 2.4 Jun 19, 2005 C Initiator: Steve Manion, VZ Title: Query to CLEC when ACT=C and FA=N or D on main class of service USOC 4 4/12/05 Committed Description: For REQTYP DB, ACT=C, LNA=C query to CLEC when FA=N or D and FEA is RRM or RBM. CLECs are submitting feature activity of N or D against the main class of service USOC, especially when adding MWI Message Waiting Indicator or 3-way Call Blocking /RCU TWC. Reason: System Enhancement. Process: Ordering Jurisdiction: VZ South Transaction: LSR Systems: LSI, EDI Primary Area: UNE P Documentation: Ordering Business Rules Rating: 1.9 Initiator: Steve Manion, VZ Page 22 of 60

23 April 2005 Items by Release Report Release CR # / Initiative #/ Moved to Not C Scheduled Description of Change Request CR Type Data Added Title: FCC TRIENNIAL Network Modifications Description: This change request is to provide CLECs that have agreed to Verizon s terms and rates for routine network modifications, the ability to request a cost estimate for work activities needed to fulfill their request when they have been notified that there are no compatible facilities available for new wholesale services i.e., UNE-P, UNE Loops etc. In addition, processes will be modified to give CLECs the opportunity to cancel or authorize the estimated work activities provided from the cost estimate request and be billed for these services. 2 3/8/05 This phase will modify the existing process so that the Notification for Network Modification returns information at a TN or circuit level. Reason: Triennial Review Order FCC paragraphs Jurisdiction: VZ East System: EDI, LSI, CORBA Process: Pre-Order Transaction: Loop Qual Primary Area: UNE LSOG Version: LSOG 5 and above Documentation Impact: LSOG 5 & 6 Pre-Order Business Rules Page 23 of 60

24 Prioritization Working Group April 12, 2005 Logistics Time: 1:00 PM 2:00 PM Place: 1095 Avenue of the Americas, New York Room: Floor 15. Room Bridge: ( ) Chair: Jean Derrig Agenda I) Review Prior Meeting Summary notes page 25. II) Review deferred, new T5, and new T4 Change Requests see page 28. Deferred page 29. New Type 5 page 32. New Type 4 page 50. III) Status update on existing Change Requests - page 53. Notes: PWG Meeting Rules removed from monthly distribution. These rules are available in the CMP Agreement Section VI Prioritization Working Group Meeting. Page 24 of 60

25 Agenda Item I Review Prior Month Activity Summary February 8, 2005 Participants The participants included AT&T, ATX, Broadview, Choice One, Comcast, Conversent, Covad, COX, CTC, CTSI, MCI, Met Tel, Penn Telecom, Qwest, Sprint, Syniverse, Time Warner, Trinsic, VarTec and XO Communications. Change Request Summary Deferred CRs C Have multiple OCLs on the same BAN on a per LATA basis. (T5) C Provide access to resold Customer Service Records via EDI. (T5) C Restore functionality of Omit TN Field within Directory Portion of LSR. (T5) C Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order. (T5) Type 5 Rated C Ability to specify copper when ordering a loop. C Ability to use Non Standard Telephone number field on order submissions. C Replace the Provider Notification Report with the Provider Notification Form. Type 4 Rated C Query for Subsequent Activity on Suspended Accounts. Withdrawn C Require a service location when the location address does not match LIVEWIRE. (T4) C Restore functionality of Omit TN Field within Directory Portion of LSR. (T5) Page 25 of 60

26 Rating Breakdown Type 5 Rating System Impacting Type 5 Non-System Impacting Type Not Rated/Re-Rated 8 0 Cancelled/Withdrawn in Implemented/Completed in Cancelled/Withdrawn in Implemented/Completed in Cancelled/Withdrawn in Implemented/Completed in Cancelled/Withdrawn in Implemented/Completed in Total Page 26 of 60

27 Scheduling and Implementation History of CLEC Rated Type 4/5 Change Requests by Release Release Date Type 4 Scheduled/ Committed Type 5 Scheduled/ Committed Type 4 Implemented Type 5 Implemented January 20, February 17, April 21, May 19, June 16, August 18, October 20, November 17, December 22, February 15, March 15, April 19, May 17, June 21, August 16, October 18, December 20, February 22, June 20, July August October 17, February 20, April 17, June 19, Page 27 of 60

28 Agenda Item II Deferred and New Type 4/5 Change Requests Change Request Summary 1. Deferred CRs C Have multiple OCLs on the same BAN on a per LATA basis. (T5) C Provide access to resold Customer Service Records via EDI. (T5) C Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order. (T5) 2. Type 5 New C Return Non-Pub or Non-List directory information on the DLR or CSI/CSR C Bill circuits by the States they service to the correct state BAN. C Create a simple system for requesting "aerial to burial" loop changes. C Integrate the validate collocation assignment step process. C Allow record order service address changes due to local government adjustments. C Allow a voice port without contacting the data provider when DSL is present 3. Type 4 New C Add Voice Mail Access Numbers to Wholesale Pre-Order Transaction C Query CLEC for invalid BAN1 or BAN2 entries on listing requests C Flowthru ACT=N With Ported in TN C Modification to LVR (Listing Verification Report) East Process Page 28 of 60

29 1. Deferred Change Requests. Rank CR#/ Type 0 C Description of CR CLEC Ratings Status/Comments Title: Have multiple OCLs on the same BAN on a per LATA basis. Overall = STATUS: Deferred Type 5 Description: This initiative requests that Verizon produce a bill with charges rolled into one BAN per Lata. In addition, include CSR and bill in same mailing. Reason: By placing multiple OCLs on the same BAN, results will be cleaner bills, less bills, quicker cash receipts by Verizon. Process: Billing Jurisdiction: VZ East Transaction: N/A Systems: N/A Initiator: Debbie Allen, Cavalier AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = 03/08/05 No CLEC Representation Page 29 of 60

30 Rank CR#/ Type 0 C Description of CR CLEC Ratings Status/Comments Title: Provide access to resold Customer Service Records via EDI. Overall = STATUS: Deferred Type 5 Description: This initiative requests that Verizon provide access to resold Customer Service Records via EDI, so that LSRs can be populated completely and accurately allowing a port to flow through more quickly and efficiently. Reason: For resold accounts, the CSR information is not available and, as a result, the LSR cannot be completely populated and processed. Having the CSR information for resold accounts will greatly reduce fallout associated with porting and Directory orders. Process: Pre-order, Order Jurisdiction: VZ East Transaction: SAR Documentation: Business Rules Systems: EDI Primary Area: LNP Initiator: Carol Frike, Sprint AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = 3/08/05 Requires investigation of Legal Issues. Page 30 of 60

31 Rank CR#/ Type 0 C Type 5 Description of CR CLEC Ratings Status/Comments Title: Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order. Description: Assume as is. I would like to be able to add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order. Reason: The Provider Notification notifier can be processed, in an automated manner, by CLECs the same as other EDI notifiers are processed. The result will improve operations, lower costs, and reduce double billing situations. Documentation: Order Business Rules Process: Order Jurisdiction: VZ North Systems: LSR Primary Area: Resale Initiator: Pam Beattie, DSCI Overall = AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = STATUS: Deferred 03/08/05 No CLEC Representation Page 31 of 60

32 2. New Type 5 Change Requests. Rank CR#/ Type 0 C Type 5 Description of CR CLEC Ratings Status/Comments Title: Return Non-Pub or Non-List directory information on the DLR or CSI/CSR. Description: The listings that are Non-Pub or Non-List to be returned on the DLR or CSI/CSR. Reason: The CLEC will be able to process Directory Listings orders more accurately, decreasing the error return. This will reduces errors and supplements. This will decrease workload for both CLEC and Verizon. Process: Pre-Order Jurisdiction: VZ East Transaction: DLR, CSI/CSR Primary Area: UNE, Resale Systems: LSI, EDI, Corba Documentation: Pre-Order Business Rules Initiator: Carol Fricke, Sprint Overall = AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = STATUS: Page 32 of 60

33 Change Request Number:C Title: T5 Return Non-Pub or Non-List directory information on the DLR or CSI/CSR. Initiator Carol Frike Telephone Number Initiator Company Date request sent to Change Control Identify the States that are affected by this change Identify the products that are affected by this change Identify the processes that are affected by this change Identify the transactions that are affected by this change Sprint 2/9/05 DC, DE, MD, NJ, PA, VA, WV, CT, MA, NH, NY, RI LNP Pre-Order, Order LSR Identify the interfaces that are affected by this change Identify the LSOG versions that are affected by this change Describe the Change Describe the functionality that you would like to enhance Note: Describe what your Change Request is. Do not specify how to implement it. Provide an example that justifies the change Include attachments if available How will your company benefit from completing the Change Request? We would like the listings that are Non-Pub or Non-List to be returned on the DLR or CSI/CSR. When the customer wants to change something on their directory listing and they are a non-published or non-listed type listing we cannot see what is currently there to accurately fill out the order for the change. It will reduces errors and supplements. This will decrease workload for both Sprint and Verizon. Win-win for both companies. Page 33 of 60

34 Describe the proposed solution to the change How do you propose the Change Request can be implemented? What is the expected output resulting from the proposed solution? Return this information on either the Directory listing inquiry response or the Customer Service record Response. That we will be able to process Directory Listings orders more accurately, decreasing the error return. Interface Usability Benefit to CLECs Productivity Impact Cost/Time Explanation LSOG Conformity Remarks Refer Questions to: Page 34 of 60

35 Rank CR#/ Type 0 C Description of CR CLEC Ratings Status/Comments Title: Bill circuits by the States they service to the correct state BAN Overall = STATUS: Type 5 Description: In NE, Verizon has no MP in place for directing Loops to their proper state Master BANs and we are experiencing them being billed in multi state jurisdictions. Reason: CLEC will benefit by having the correct state circuits billed to the correct state BAN. Process: Order Jurisdiction: MA, NH, RI Transaction: LSR Primary Area: UNE Systems: LSI, EDI Documentation: Order Business Rules Initiator: Arthur Barone, Broadview Networks AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = Page 35 of 60

36 Change Request Number: C Title: T5 Bill circuits by the States they service to the correct state BAN. Initiator Arthur P. Barone Telephone Number Initiator Company Date request sent to Change Control Identify the States that are affected by this change Identify the products that are affected by this change Identify the processes that are affected by this change Broadview Networks 2/24/05 MA, NH, RI UNE Billing Identify the transactions that are affected by this change Identify the interfaces that are affected by this change Identify the LSOG versions that are affected by this change Describe the Change Describe the functionality that you would like to enhance Note: Describe what your Change Request is. Do not specify how to implement it. Provide an example that justifies the change Include attachments if available How will your company benefit from completing the Change Request? N/A In NE, Verizon has no MP in place for directing Loops to their proper state Master BANs and we are experiencing them being billed in multi state jurisdictions. eg. Broadview would like our MA Loop circuits to be billed on my MA Loop BAN, not on our New Hampshire Loop BAN. Examples were already provided to Bryan Weingarten WBCC My company will benefit by having the correct state circuits billed to the correct state BAN. Page 36 of 60

37 Describe the proposed solution to the change How do you propose the Change Request can be implemented? What is the expected output resulting from the proposed solution? Interface Usability Benefit to CLECs Productivity Impact Cost/Time Explanation LSOG Conformity Remarks By establishing a MP for future loop circuit additions that direct these Loops to the proper state Master BAN. Then correct the embedded base where circuits have been misdirected. The correct state circuits billed to the correct state BAN Refer Questions to: Page 37 of 60

38 Rank CR#/ Type 0 C Description of CR CLEC Ratings Status/Comments Title: Create a simple system for requesting "aerial to burial" loop changes. Overall = STATUS: Type 5 Description: ATX would like to have the process for a request to have a customers aerial loop buried work the same way that the Alternate Serving Wire Center process works. Reason: We are getting these requests more frequently, but the current process is not well defined. VZ and other CLECs will benefit Process: Order Jurisdiction: VZ East Transaction: LSR Primary Area: UNE Systems: LSI, EDI Documentation: Order Business Rules Initiator: Alex Kuhner, ATX AT&T = ATX = Bridgecom = Broadview = Cavalier = Choice One= Comcast = Conversent = Covad = Cox = CTSI= CTC = DSCI = First Line Comm= MCI = Met Tel = Ntelos = Penn Telecom= Qwest = REMI = Sprint = Synaverse = TalkAmerica= Time Warner = Trinsic = US LEC = VarTec = Xchange Telecom = XO = Page 38 of 60

39 Change Request Number: C Title:T5 Create a simple system for requesting "aerial to burial" loop changes. Initiator Alex Kuhner Telephone Number Initiator Company Date request sent to Change Control Identify the States that are affected by this change Identify the products that are affected by this change akuhner@atx.com Atx Communications 2/24/05 All East UNE Loop Identify the processes that are affected by this change Identify the transactions that are affected by this change Identify the interfaces that are affected by this change Identify the LSOG versions that are affected by this change Describe the Change Describe the functionality that you would like to enhance Note: Describe what your Change Request is. Do not specify how to implement it. Provide an example that justifies the change Include attachments if available How will your company benefit from completing the Change Request? We would like to have the process for a request to have a customers aerial loop buried work the same way that the Alternate Serving Wire Center process works. BTN customer wants wires moved from pole to a conduit underground and into the demarc We are getting these requests more frequently, but the current process is not well defined. Vz and other CLECs will benefit too. Page 39 of 60

July 2005 Items by Release Report

July 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

June 2005 Items by Release Report

June 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group September 14, 2005 Logistics Time: 1:00 PM 2:00 PM Place: 1095 Avenue of the Americas, New York Room: Floor 15. Room 15-01 Bridge: (800-566-2250) Chair: Jean Derrig Agenda

More information

OSS Interface Change Management Meeting September 14, 2004

OSS Interface Change Management Meeting September 14, 2004 OSS Interface Change Management Meeting September 14, 2004 10:00 AM 12:00 PM & 1:00 PM 2:00 PM 1095 Avenue of the Americas, New York, NY Floor 34, Room 34-17 Dial-In: (800) 347-6311 Agenda I. Welcome and

More information

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 5 Session 7 Agenda December 19, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 56 26 est C03-2347 385953 Enhance Held Order Process Eschelon 4.3 Not Scheduled 58 61 East

More information

PWG Change Request History. Type 5 Session 7 Agenda

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 Meeting Participants: The participants included AT&T Local, AT&T CA/TX, Covad, Cox, Eschelon, Integra. Nationsline, Paetec, Penn Telecom, and XO. 5 Session 7 Agenda Rank C/L East CR#

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:00 AM 12:00 PM CST Place: 600 Hidden Ridge, Irving, Texas Room: East Building, Floor 3, E03R02 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:15 AM 12:00 PM CST Place: 700 Hidden Ridge, Irving, Texas Room: W02R01 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda Agenda I) Review October

More information

November 2005 Items by Release Report

November 2005 Items by Release Report Oct 30, 2005 C04-0053 Title: RETAS pending status information transaction 5 6/14/05 386561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

PWG Change Request History

PWG Change Request History January 8, 2008 Meeting Participants: The participants included Accenture, AT&T Local, AT&T CA/TX, Broadview Networks, Cablevision, Comcast, Consolidated Communications, Covad, Cox, Eschelon, Granite,

More information

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007 5 Session 5 Agenda December 11, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 42 est 54641 Allow Service Recovery to be requested on repair trouble ticket Integra 4.6

More information

OSS Interface Change Management Meeting October 14, 2003

OSS Interface Change Management Meeting October 14, 2003 OSS Interface Change Management Meeting October 14, 2003 10:00 AM 12:00 PM 1095 Avenue of the Americas, New York, NY Fl/Rm. 26-36 Dial-In: (312) 461-9457 Agenda I) Welcome and Introductions (Tom Rodgers)

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

March 2003 OSS Interface Change Management Meeting

March 2003 OSS Interface Change Management Meeting 51 Wholesale Customer 2/08/00 - Bell Atlantic told the CLECs the Help Desk Hours of Operation. Care Center/ formerly - BA to have the handbook updated with the correct hours of the Help Desk. These hours

More information

OSS Interface Change Management Meeting November 12, 2003

OSS Interface Change Management Meeting November 12, 2003 OSS Interface Change Management Meeting November 12, 2003 10:00 AM 12:00 PM 1095 Avenue of the Americas, New York, NY Fl/Rm. 26-36 Dial-In: (312) 461-9457 Agenda I) Welcome and Introductions (Tom Rodgers)

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

October 2005 Items by Release Report

October 2005 Items by Release Report C04-005 Title: RETAS pending status information transaction 5 86561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution when the ticket

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 14 October 11 Draft Business Rules (73 days) 12/05/2003 04/02/ 07/30/ Draft Technical Specifications (66

More information

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting.

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting. October 14, 2009 Meeting Minutes Page 1 of 6 Changes of Interest Verizon reviewed enhancements to the Local Content on the Verizon Partner Solutions ( VPS ) Web site previously announced by the VPS Customer

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 5 1 2601 C02-2712 376792 E Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change orders when an end user moves to a new address in the

More information

2009 OPEN CUF ISSUES

2009 OPEN CUF ISSUES 2009 OPEN CUF ISSUES Table of Contents: #1 Review Verizon Changes Of Interest to CLEC Community... 2 #116 Transition of Idaho NMC to Virginia NMC... 4 Printed: 01/14/09 Page 1 #1 Review Verizon Changes

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-0032 #386535 Rating = NR Title: Retrofit for Corporate Rewards Description: The purpose of this initiative is to have Flow Through automate Corporate

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 Rank 1 CR#/ 2601 C02-2712 376792 E Description of CR CLEC Ratings Status/Comments Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change

More information

Prioritization of Change Requests CLEC Initiated (Type 5)

Prioritization of Change Requests CLEC Initiated (Type 5) 1 C03-1259 Title: T5 RESID Information on Provider Notification Overall = 5.0 STATUS: PENDING #384078 Description: RESID to be auto populated for all products when a Provider Notification is sent. Candidate

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 Rank 1 CR#/ 2601 C02-2712 376792 E/W Description of CR CLEC Ratings Status/Comments Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change

More information

December, 2002 OSS Interface Change Management Meeting

December, 2002 OSS Interface Change Management Meeting - 3/13/01 - CLECs request this item remain open 26 Backwards compatibility - 6/15/99 - TCs asked that backwards compatibility be discussed at the next Change Control meeting. - 7/14/99 - BA to work with

More information

Prioritization of Change Requests CLEC Initiated (Type 5)

Prioritization of Change Requests CLEC Initiated (Type 5) 1 C02-3149 Title: Outside Moves Overall = 4.8 Description: Use elements of the migration process to facilitate outside moves. The CLEC would first perform loop qualification to assure the service is viable

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-1790 #390501 Rating = NR MCI = Birch = HTC = SBC = Choice One = Trinsic = Eschelon = Allegiance/XO = Time W = Sprint = Grande = Comcast = Electric

More information

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5)

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5) N/A 01-0002 Title: Add central office CLLI codes to WISE loop qualification. Overall = 4.1 Description: SBC wants the Host/Remote SWC CLLI code for the end user s address to be returned, which increases

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release To be Rated C0-1132 #388718 Rating = NR AT&T = MCI = Birch = HTC = SBC = Choice One = Z-Tel = Eschelon = Allegiance/XO = Covad = VarTec = Cox = Title: Flow Through to Automate Disconnect Orders Without

More information

Verizon CLEC User Forum (CUF) Guidelines

Verizon CLEC User Forum (CUF) Guidelines Verizon CLEC User Forum (CUF) Guidelines Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for businessto-business discussion focused on improving communication and processes

More information

Implemented Change Requests CLEC Initiated (Type 5)

Implemented Change Requests CLEC Initiated (Type 5) N/A 01-0010A Title: CSI Complex Listings/DSL/Contractual Info/Hunt Group Overall = 4.7 (Includes the intent of CR#19, 20 and 21) 01-0070 #371537 CID# 371537 Description: Return to providing DL, Caption

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

VERIZON MARYLAND LLC 1. Performance Assurance Plan. Maryland

VERIZON MARYLAND LLC 1. Performance Assurance Plan. Maryland VERIZON MARYLAND LLC 1 Performance Assurance Plan Maryland Version 4.0 Implementation: April, 2016 Filing Date: November 23, 2015 1 Verizon Maryland LLC is the successor to Verizon Maryland Inc. TABLE

More information

Wholesale Platform Services Overview

Wholesale Platform Services Overview Overview In this document: Overview 2 Service Types 2 Before Completing Your Order 3 Other Information to Consider 4 Change Log 8 Frontier Communications Rochester, NY Jurisdiction: FTR13 Effective Date:

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

Charter EZPort User Guide

Charter EZPort User Guide Charter EZPort User Guide Version 2.4 September 14, 2017 Contents Document Information... 3 Version Notice and Change Log... 3 General... 6 Getting Started...7 System Requirements... 7 Initial Access Procedure...

More information

FairPoint Change Management Process

FairPoint Change Management Process FairPoint Change Management Process John Berard, Director Wholesale Services Portland, Maine September 16, 2010 Agenda Opening Remarks WebEx and Conference Call Etiquette Mute Phones when not speaking

More information

Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports. Verizon Reports

Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports. Verizon Reports Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports Verizon Reports April 1, 2003 Verizon PA C2C Guidelines 1 Category Function # of Metrics Pre-Ordering PO-1 PO-2 PO-3 PO-4 PO-5

More information

FairPoint Change Management Process Agenda & Opening Remarks

FairPoint Change Management Process Agenda & Opening Remarks FairPoint Change Management Process Agenda & Opening Remarks John Berard, Director, Wholesale Customer Relations Portland, Maine July 22, 2009 Agenda Opening Remarks WebEx and Conference Call Etiquette

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely,

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely, RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS PUBLIC SERVICE COMMISSION GREG R. WHITE JOHN D. QUACKENBUSH SALLY A. TALBERG COMMISSIONER CHAIRMAN COMMISSIONER MIKE

More information

Customer Wholesale Portal User Guide

Customer Wholesale Portal User Guide Customer Wholesale Portal User Guide Table of Contents Overview 2 Establishing a Super User (SU) 3 Bulk Loop Qualification Extract 6 Carrier-to-Carrier Reports 7 Customer Service Record (CSR) Over 10K

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 14 11 Draft Business Rules (73 days) 12/05/2003 04/02/ 07/30/ Draft Technical Specifications (66 days) 12/12/2003

More information

2007 CLOSED CUF ISSUES

2007 CLOSED CUF ISSUES 2007 CLOSED CUF ISSUES Table of Contents: # 85 CNR Process... 2 #91: E911 Updates... 5 # 96 Maintenance Dispatch Out Process Change... 8 #103 Reduce Repeated Truck Rolls... 10 #105 Vendor Meet Billing

More information

Fairpoint Communications. Maine, New Hampshire, and Vermont. Jeopardy Notification. Version 1.1

Fairpoint Communications. Maine, New Hampshire, and Vermont. Jeopardy Notification. Version 1.1 Fairpoint Communications Maine, New Hampshire, and Vermont Jeopardy Notification Version 1.1 December 2009 Table of Contents OVERVIEW..1.0 LSR JEOPARDY CODE DEFINITION 2.0 SAMPLE LSOG 9 JEOPARDY NOTIFICATION..3.0

More information

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines:

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines: Hot Cut This is a guideline that describes hot cuts that are either through an interconnection agreement or through a state tariff. The term "Hot Cut" is used in the local exchange industry to describe

More information

Verizon East Release Overview

Verizon East Release Overview Verizon East Release Overview Publication 04/07/2005 Version 1.1 05/05/2005 VERIZON Restricted Notice This Release Overview document is intended to provide an encapsulated look at initiatives scheduled

More information

DIRECT TESTIMONY OF BONNIE J. JOHNSON ON BEHALF OF INTEGRA TELECOM AUGUST

DIRECT TESTIMONY OF BONNIE J. JOHNSON ON BEHALF OF INTEGRA TELECOM AUGUST BJJ-11 INTEGRA CMP Oversight Committee Meeting Minutes January 10, 2005, 1-877-572-8687, Conference ID 3393947# 3:00 p.m. 4:00 p.m. Mountain Time PURPOSE This was the second meeting of the CMP Oversight

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

Resale at Retail Services Manual Section III. Pre-Ordering

Resale at Retail Services Manual Section III. Pre-Ordering 1.0 Introduction Pre-ordering information provides the Reseller certain information that may be needed when utilizing resold local exchange services. This information includes: Address Validation Service

More information

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES This document contains proprietary data and is the industrial property of Exiant Communications LLC. The reproduction or disclosure

More information

COMPETITIVE TELECOMMUNICATIONS PROVIDERS: ANNUAL REPORT TO THE LEGISLATURE Staff Report. Public Utility Commission of Oregon

COMPETITIVE TELECOMMUNICATIONS PROVIDERS: ANNUAL REPORT TO THE LEGISLATURE Staff Report. Public Utility Commission of Oregon COMPETITIVE TELECOMMUNICATIONS PROVIDERS: ANNUAL REPORT TO THE LEGISLATURE 2014 Staff Report Public Utility Commission of Oregon December 2014 EXECUTIVE SUMMARY ORS 759.050(9) requires the Public Utility

More information

Wholesale Advantage Voice Overview (Legacy Service Territory)

Wholesale Advantage Voice Overview (Legacy Service Territory) Wholesale Advantage Voice Overview (Legacy Service Territory) Carrier Services Frontier Communications Rochester, NY Effective: 12/20/2016 Revised: 11/07/2017 Contents Wholesale Advantage Voice Overview

More information

10. Unbundled Dark Fiber 10.1 General

10. Unbundled Dark Fiber 10.1 General Verizon New England Inc. Page 1 Second Revision Canceling First Revision 10.1 General 10.1.1 Description A. For purposes of this Part B, Section 10, the terms business line, fiber-based collocator, and

More information

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT IT Updates Maryland Health Benefit Exchange Board Meeting April 15, 2014 Presented by: Isabel FitzGerald Secretary, DoIT A service of Maryland Health Benefit Exchange Agenda Overview of process for CT

More information

IATF Transition Strategy Presenter: Cherie Reiche, IAOB

IATF Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy in April

More information

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015 Next Steps for WHOIS Accuracy Global Domains Division ICANN 53 24 June 2015 Agenda: Next Steps for WHOIS Accuracy Reporting System 1 2 3 Introduction and Implementation Approach Pilot Project and Lessons

More information

COLEMAN COUNTY TELEPHONE COOP, INC. LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

COLEMAN COUNTY TELEPHONE COOP, INC. LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES COLEMAN COUNTY TELEPHONE COOP, INC. LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES This document contains proprietary data and is the industrial property of Coleman County Telephone Coop, Inc. The reproduction

More information

FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES Updated: 10/19/2018 This document contains proprietary data and is the industrial property of Farmers Telecommunications.

More information

Frontier Communications CLEC User Forum (CUF) May 19, 2016

Frontier Communications CLEC User Forum (CUF) May 19, 2016 Frontier Communications CLEC User Forum (CUF) May 19, 2016 1 Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for business-to-business discussion focused on improving

More information

Embracing Competition Stakeholder Engagement Workshop no May 2018

Embracing Competition Stakeholder Engagement Workshop no May 2018 Embracing Competition Stakeholder Engagement Workshop no. 26 22 May 2018 Welcome and opening remarks Mark Adolphus, Director of Connections 2 Agenda 09:45 10:00 Coffee and registration 10:00 10:05 Welcome

More information

FedRAMP: Understanding Agency and Cloud Provider Responsibilities

FedRAMP: Understanding Agency and Cloud Provider Responsibilities May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration

More information

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy

More information

Customer Service Record (CSR) Inquiry Process

Customer Service Record (CSR) Inquiry Process Customer Service Record (CSR) Inquiry Process Carrier Services Frontier Communications Rochester, NY Effective: 11/05/2014 Revised: 10/25/2017 Contents Customer Service Record Inquiry... 3 Overview...

More information

EXHIBIT D. Section ACCESS TO OPERATIONAL SUPPORT SYSTEMS (OSS) 1.1 Description

EXHIBIT D. Section ACCESS TO OPERATIONAL SUPPORT SYSTEMS (OSS) 1.1 Description EXHIBIT D Section 1.0 - ACCESS TO OPERATIONAL SUPPORT SYSTEMS (OSS) 1.1 Description 1.1.1 Qwest has developed and shall continue to provide Operational Support System (OSS) interfaces using electronic

More information

Establish and Maintain Account Key Network and Service Decisions. Network Interconnections

Establish and Maintain Account Key Network and Service Decisions. Network Interconnections Establish and Maintain Account Key Network and Service Decisions Network Interconnections Establish CLEC-Consolidated Communications Inc. (CCI) Relationship: This section describes processes and procedures

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON ORDER NO. 08-408 ENTERED 08/08/08 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1354 In the Matter of ) ) QWEST CORPORATION ) ) Petition for Approval of Price Plan Pursuant ) to ORS 759.255. ) ORDER

More information

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA UNITED STATES OF AMERICA, v. Plaintiff, MICROSOFT CORPORATION, Civil Action No. 98-1232 (CKK) Next Court Deadline: May 12, 2006 Joint Status

More information

Wholesale Regulation: The Critical Role of the FPSC

Wholesale Regulation: The Critical Role of the FPSC 1 Wholesale Regulation: The Critical Role of the FPSC 2 Competitive Carriers of the South CompSouth was formed in November 2002 as a group of CLECs supporting competitive alternatives offered under the

More information

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT SUBJECT PARAGRAPH(S) PROFESSIONAL EXPERIENCE AND EDUCATIONAL BACKGROUND 2-4 PURPOSE OF AFFIDAVIT 5,6 SERVICE CENTERS DESCRIPTIONS

More information

PART 3 - Provisions - Southeast 1st Revised Page 1 SECTION 7 - Service Provisioning and Rate Conditions ACCESS SERVICE

PART 3 - Provisions - Southeast 1st Revised Page 1 SECTION 7 - Service Provisioning and Rate Conditions ACCESS SERVICE PART 3 - Provisions - Southeast 1st Revised Page 1 7.1 General Special Access (a.k.a. BellSouth SPA) service provides a transmission path to connect customer designated premises or a customer designated

More information

BERMUDA REGULATORY AUTHORITY (NUMBERING PORTABILITY) GENERAL DETERMINATION 2014 BR 8 / 2014

BERMUDA REGULATORY AUTHORITY (NUMBERING PORTABILITY) GENERAL DETERMINATION 2014 BR 8 / 2014 QUO FA T A F U E R N T BERMUDA REGULATORY AUTHORITY (NUMBERING PORTABILITY) GENERAL BR 8 / 2014 The Regulatory Authority, in exercise of the power conferred by section 62 of the Regulatory Authority Act

More information

Viveros Attachment W

Viveros Attachment W Viveros Attachment W DOCUMENT SWB PB/NB DESCRIP. WHERE FOUND WHEN CAN PROVIDE TO CLEC PRE-ORDERING Verigate User X X How to use Verigate. Verification Gateway (VERIGATE) is an online system which provides

More information

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP Executive Summary The Generic Names Supporting Organization (GNSO) unanimously approved at its meeting on

More information

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION In the Matter of: PETITION BY ALLTEL CORPORATION TO ) ACQUIRE THE KENTUCKY ASSETS OF ) CASE NO. VERIZON SOUTH, INCORPORATED ) 2001-399 SECOND

More information

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure.

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure. PAGE 1 of 11 PROCESS OBJECTIVE : To effectively manage all feedback (as defined in QM-00-01 / 02) and associated correction and corrective action in an effective and objective manner. Feedback includes

More information

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017 North American Portability Management, LLC Transition Oversight Manager TOEP Webcast November 7, 2017 Welcome to today s webcast Submit Questions for Q&A Webcast Issues Click the Q&A widget at the bottom

More information

We are filing herewith, for effect November 1, 2003, tariff material consisting of: Revision of

We are filing herewith, for effect November 1, 2003, tariff material consisting of: Revision of Theresa L. O Brien Vice President Regulatory Affairs October 2, 2003 234 Washington Street Providence, RI 02903 Phone: 401 525-3060 Fax: 401 525-3064 theresa.obrien@verizon.com Ms. Luly Massaro Commission

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

A47. BELLSOUTH REMOTE ACCESS SERVICE

A47. BELLSOUTH REMOTE ACCESS SERVICE AT&T TENNESSEE GENERAL EXCHANGE GUIDEBOOK First Revised Page 1 CONTENTS A47.1 BellSouth Remote Access Service 1 A47.1.1 General 1 A47.1.2 Terms and Conditions 1 A47.1.3 Rates and Charges 4 AT&T TENNESSEE

More information

Verizon New York Inc. Part B Section 13 Original Page 1 MOVES AND CHANGES

Verizon New York Inc. Part B Section 13 Original Page 1 MOVES AND CHANGES Original Page 1 A. GENERAL The Company reserves to itself the exclusive right of making changes in the location of its lines and equipment. When it is found that a move or change of such lines or equipment

More information

Provider Monitoring Process

Provider Monitoring Process Provider Monitoring Process This statewide provider monitoring process is applicable for all providers including direct vendors, Agency with Choice (AWC) Financial Management Services (FMS) providers and

More information

APPENDIX D MAINTENANCE AND REPAIR METRICS

APPENDIX D MAINTENANCE AND REPAIR METRICS APPENDIX D MAINTENANCE AND REPAIR METRICS APPENDIX D - MAINTENANCE AND REPAIR METRICS A - INTRODUCTION This Appendix discusses each of the Verizon PA s five (5) Maintenance and Repair metrics, which are

More information

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES BELLSOUTH LONG DISTANCE, INC. 2nd Revised Page 1 d/b/a AT&T Long Distance Service Effective: October 25, 2014 4.1 General Customers are billed based on their usage of the Company's services. Rates may

More information

JU Stakeholder Engagement Webinar

JU Stakeholder Engagement Webinar JU Stakeholder Engagement Webinar April 21, 2017 draft for discussion Agenda for April 21 st 9:00AM 10:30AM EDT The April 21 st agenda will include presentations and Q&A sessions on the following topics:

More information

SME License Order Working Group Update - Webinar #3 Call in number:

SME License Order Working Group Update - Webinar #3 Call in number: SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under

More information

ATNP Configuration Control Board (CCB) Procedures Document

ATNP Configuration Control Board (CCB) Procedures Document -WP/66 15 March 1996 AERONAUTICAL TELECOMMUNICATION NETWORK PANEL CCB Standing Document ATNP Configuration Control Board (CCB) Edited by CCB Chair SUMMARY This document contains detailed procedures to

More information

GENERAL CUSTOMER SERVICES TARIFF CONTENTS. S20.1 ISDN Primary Rate Interface (PRI) 2

GENERAL CUSTOMER SERVICES TARIFF CONTENTS. S20.1 ISDN Primary Rate Interface (PRI) 2 Citizens Telecommunications Company of West Virginia First Revised Page 1 d/b/a Frontier Communications of West Virginia Cancels Original Page 1 PSC WV No. 4 S20. INTEGRATED SERVICES DIGITAL NETWORK (ISDN)

More information

VIII PERFORMANCE ASSURANCE PLAN PENALTY PAYMENT CALCULATION

VIII PERFORMANCE ASSURANCE PLAN PENALTY PAYMENT CALCULATION VIII PERFORMANCE ASSURANCE PLAN PENALTY PAYMENT CALCULATION VIII PERFORMANCE ASSURANCE PLAN PENALTY PAYMENT CALCULATION This chapter describes DCI analysis activities involving the Verizon Pennsylvania

More information

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 July 30, 2010 Re: Q2 Quarterly

More information

Advanced Syllabus 2007 Release Plan

Advanced Syllabus 2007 Release Plan Advanced Syllabus Release Plan Milestone English Non-English The Advanced Syllabus distributed to National Boards for general release. Change tracked and Word versions released to National Boards for limited

More information

Case 1:98-cv CKK Document Filed 06/15/2006 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Case 1:98-cv CKK Document Filed 06/15/2006 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA Case 1:98-cv-01232-CKK Document 831-1 Filed 06/15/2006 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA UNITED STATES OF AMERICA, v. Plaintiff, MICROSOFT CORPORATION, Civil

More information

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note CDM Exemption Hydro One Networks' s ONLY HYDRO ONE S Description Filed Date Note J. J. J. TO PROVIDE NUMBERS OF NON-COMPLIANT APPLICATIONS REQUIRING AND NOT REQUIRING SITE ASSESSMENTS TO PROVIDE STAFFING

More information

9 - BellSouth Directory Assistance Access (D) (D)

9 - BellSouth Directory Assistance Access (D) (D) Four AT&T Plaza, Dallas, Texas 75202 2ND REVISED PAGE 9-1 CANCELS 1ST REVISED PAGE 9-1 ISSUED: APRIL 6, 2015 EFFECTIVE: APRIL 21, 2015 9 - BellSouth Directory Assistance Access (D) (D) 9.1 BellSouth Directory

More information

Verizon East Release Overview. February 2005 Release Publication 12/9/2004 Version 3 1/4/05

Verizon East Release Overview. February 2005 Release Publication 12/9/2004 Version 3 1/4/05 Verizon East Release Overview February 2005 Release Publication 12/9/2004 Change Log CR Revision Date Revision Summary Not Applicable 12/13/04 Page 3 revised explanation of documentation Not Applicable

More information

PART 2 - Provisions - Midwest, West, Southwest Original Page 1 SECTION 7 - Service Provisioning and Rate Conditions

PART 2 - Provisions - Midwest, West, Southwest Original Page 1 SECTION 7 - Service Provisioning and Rate Conditions PART 2 - Provisions - Midwest, West, Southwest Original Page 1 7. Special Access Service 7.1 Service Provisioning Special Access Service provides a transmission path to connect customer designated premises

More information

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols Project 2007-02 Operating Personnel Communications Protocols COM-002-4 Operating Personnel Communications Protocols Please DO NOT use this form. Please use the electronic comment form to submit comments

More information