Prioritization of Change Requests CLEC Initiated (Type 5)

Size: px
Start display at page:

Download "Prioritization of Change Requests CLEC Initiated (Type 5)"

Transcription

1 1 C Title: Outside Moves Overall = 4.8 Description: Use elements of the migration process to facilitate outside moves. The CLEC would first perform loop qualification to assure the service is viable to the new address and then issue a change order to move the service to the new address. Process: Order, Provisioning; Jurisdiction: West; System: WISE GUI, EDI; Primary Area: All; LSOG Version: All SBCT = P Allegiance = P Eschalon = P VarTec = 5 12/17/02 Put on hold per initiator pending further review. CR moved from Oct 03 to. 11/19/02 Internal discussion taking place. 10/15/02 New to List. Rated by CLECs. 2 C for Jun 03 3 C Initiator/Date: Michael Clancy, Covad, 10/04/02 Title: Due Date for Pre-Ordered Loops Description: Ability to pre-order loops and get a due date for installation in the pre-order environment. Process: Pre-order; Jurisdiction: West; System: WISE, EDI; Primary Area: All; LSOG Version: All Initiator/Date: Art Chavez, SBC, 03/25/02 Title: UNE DSO Standard Interval Overall = 4.7 SBCT = 5 VADI = 4 Allegiance = 5 XO = 5 Eschalon = 5 VarTec = 4 Electric LW = 5 DSET = P Overall = /21/03 Initiator agreed to the following as a close enough approximation of original CR intent: For POTS orders, the ability exists to view available Due Dates and select the preferable one. For nondesigned services, we can provide a look-ahead function. For designed loops, we don t have the tables etc. necessary to provide due dates, but can give the next available Due Date, but unable to provide alternatives. 12/17/02 Summary of BRD provided to CLECs. 08/26/02 Business Requirements Document (BRD) completed. 08/08/02 Business Application Design (BAD) session held. 06/10/02 Scheduled as a candidate for the June /16/02 New to List. CR expanded during Apr Mtg to include: UNE Loops/All Types, All Production pre-order interfaces, and designed and non-designed in the respective sections of CR. Rated by CLECs. Description: Change the UNE DSO provisioning interval to 5 business days. Create a standard provisioning interval in Verizon footprint. Process: Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All Initiator/Date: Michael Clancy, Covad, 10/01/02 SBCT = 4 Allegiance = 5 Eschalon = 5 VarTec = P 01/27/03 Moved to 11/19/02 Referred to Process Group. 10/15/02 New to List. Rated by CLECs. Page 1 of 15

2 4 C Title: Improved Loop Qual Information for DLC Overall = 4.7 for Oct 03 5 C Description: Review existing Verizon records to update data in Loop Qual OSS and bulk extract. Process: Pre-Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All Initiator/Date: Michael Clancy, Covad Communications, 12/02/02 Title: 2 Day Line Sharing Interval Eschalon = P Overall = 4.5 STATUS: New 01/31/03 Final Review of BRD. 01/24/03 Business Requirements Documentation session held. 01/06/03 CR was scheduled as a candidate for Oct /17/02 New to List. Rated by CLECs. Type 4 CR C appeared to serve the same purpose as this CR with the exception of the provision for an ISDN flag. It was decided to revise this CR with only the ISDN flag as an enhancement to CR C , and to apply the same rating that was given to C Description: Change the standard Line Sharing interval to 2 days from 3 days. This will match the best in class among ILECs line sharing interval currently offered and will be consistent with migration intervals. Process: Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All SBCT = 4 Allegiance = P Eschalon = P VarTec = P 11/29/02 Referred to Process Group. 10/15/02 New to List. Rated by CLECs. 6 C Initiator/Date: Michael Clancy, Covad, 10/01/02 Title: FTP Loss Notification Report Overall = 4.5 STATUS: New for Feb 04 Description: Create a line loss report accessible through the FTP gateway used for the Verizon East Line Loss report. Process: Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All Initiator/Date: John Boshier, Covad, 01/28/03 AT&T = P WorldCom = P SBCT = P Allegiance = 5 Eschalon = P VarTec = P Covad = 4 ChoiceOne = P 01/21/03 New to List. Rated by CLECs. Page 2 of 15

3 7 C Title: Hunt Group Data at Account Level Overall = 4.4 for Jun 03 Description: Hunt Group information fed back to the CLEC would be available at the account level rather than at the WTN. Process: Pre-order, Order; Jurisdiction: West; System: WISE, EDI, Corba; Primary Area: All; LSOG Version: All Initiator/Date: Cheryl Peterson/Bob Buerrosse, AT&T/Allegiance, 05/02/02 SBCT = 5 VADI = P Alleginace = 5 Covad = 3.5 VarTec = 4 01/21/03 Doug Tomlinson gave a status, indicating that this CR will be a 2 phase process, with the first phase relating to the backend processes and scheduled for the June. However, the second phase will be a clean-up of the embedded base and has not yet been given any time estimates. 12/17/02 Doug Tomlinson will be asked to give anupdate during the Jan mtg. 10/15/02 Doug Tomlinson reported on this CR. Doug notes that the HTSEQ field on the CSI will carry information, if entered correctly at the time the Retail SO is processed. Doug confirmed CLEC instances where there has been disagreement between the IOSCs and what the customers ordered. Enhancements to the retail system are pending to create edits that will catch this data discrepancy. 09/17/02 Scheduled as a candidate for the June 03. BAD session scheduled for 9/ /21/02 New to List. Rated by CLECs. In discussion of this CR, CLECs recognized that this would do nothing for cleaning up the embedded base field, and therefore, any benefit from the implementation of this CR would not be seen for quite a while. Page 3 of 15

4 A Title: Access to view Directory Listings Overall = 4.3 OMT CR# C for Oct 03 Description: Establishment of a new interface providing CLECs access to view NOCV listings that belong to them via database. Would allow CLEC to proof new listings, making corrections at the time they are put into the systems. Process: Currently no process in place other than hard proof sheets from Directory Company; Jurisdiction: West; System: GUI, EDI, CORBA, CSI, and TBD; Primary Area: NOCV Listings; LSOG Version: 4 Initiator/Date: Carolyn House/Jodi Oomkes, USX/Choice One, 01/11/01; Mike Salazar, AT&T, championed this CR with modifications at 4/17 meeting. Sprint = 4 Rhythms = 4 VADI = Pass Time Wrnr = 4 01/21/03 A Listing Verification Report Database will be available in March for the East, with hopes of the same being available later in the West. This is a separate interface into the Directory Company. 11/12/02 CR has been revised from outcome of Conference Call on 10/30/02. 10/28/02 CR rescheduled as candidate for October 03. CR referred internally to determine benchmark strategy of change requests. 10/15/02 Conference Call scheduled for 10/30/02 at 3pm CST to discuss what additional information the CLEC community wanted. 09/17/02 CR introduced in August as an interim solution to this CR was cancelled by initiator. 08/07/02 Allegiance submitted C as an Interim Solution to Directory Listing Access. 06/10/02 No revision or new CR has been received to date. Original CR has been scheduled as a candidate for Jun /21/02 Discussion on a revised and/or new CR to be submitted for implementation in the interim of the project now under development. Funding is not available in 2002 for this project and CR is included as a 2003 funding expectation. The interim solution would be an excel report, such as being currently used in the East. 02/25/02 A Business Case has been completed for VZ East where at least 4 options are being considered on how to proceed. VZ West will be completing a like Business Case and will follow VZ East s lead for the present. 02/11/02 CR moved from Feb 03 release and placed in unassigned. 02/04/02 CR was slotted as candidate for a Feb 03 release. 01/15/02 Initiator requests that VZ West move forward with CR instead of waiting on project decision from VZ East. 12/12/01 A project to create a national listing repository accessible via WISE now being discussed at a VP level. No decision/dates at this time. 11/15/01 No change in status 10/16/01 Project running into major obstacles. No schedule for either VZE or VZW. Update expected in December. 09/14/01 No change 08/21/01 VZ East running into difficulty for implementing project for 3/02, and have pushed back to 6/02. Page 4 of 15

5 07/17/01 Verizon will be holding a directory listings workshop in September in Irving. More detailed info will be available at a later date. 06/19/01 A plan is being developed for the entire Verizon footprint. More info to follow in July/August. 05/15/01 Awaiting funding commitment. 04/17/01 Championed by AT&T, after modification (removed LMS wording). CLECs rated at April Mtg. 03/21/01 No representation 02/20/01 New to list. Will rate at March mtg. 9 C Committed for Feb C for Oct 03 Title: Single PON-Level SAR (Phase 1) Description: To receive a final SAR version that includes all work completed for a single PON. Process: Order; Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: All; LSOG Version: All Initiator/Date: Cheryl Peterson, AT&T, 03/07/02 Title: Single PON-Level SAR Follow-up (Phase 2) Description: The return to CLECs will be changed. Prior to implementation of C , CLECs received multiple SARs for a single LSR. C caused only the final SAR to be sent to the CLEC. Others were to be available to the CLECs via WISE. This initiative will cause all SARs to be accumulated and sent to the CLEC upon final completion. Initiator/Date: Initiative from previous CR , 10/18/02 Overall = 4.3 WorldCom = D SBCT = 4 VADI = 4 Allegiance = 4 Overall = 4.3 STATUS: IMPLEMENTED 02/18/03 Implemented on 2/10/03 with February. 10/28/02 Correction made to matrix reflecting Initiator information. 10/15/02 Discussion of this CR exposed the fact that the SAR that would be sent out with the CR s implementation would list only the last service order that completed, and CLECs would have the option of viewing all SOs via WISE. CLECs pointed out that the original intent was to also have the SAR list an accumulation of all associated SOs. Consensus was reached to continue on with this enhancement for Feb 03 and follow up with a second initiative to summarize the completion notice. The second initiative will not be rated, but will bear the same rating as this CR. 06/10/02 CR scheduled as candidate for Feb /29/02 Business Application Design (BAD) session scheduled for April 8-10, /19/02 New to List. Rated by CLECs. 12/17/02 Referred to Process Group. 11/19/02 Escalated to be included in the June /11/02 Scheduled as candidate for Oct /18/02 Initiative from previous CR: C Will carry the same rating as C Page 5 of 15

6 11 C Title: Data End User Migrations Overall = 4.2 for Oct C Description: Verizon East implemented a change to support Data Migrations some months ago. This request is to implement the same process in Verizon West. Initiator/Date: Michael Clancy, Covad, 10/01/02 Title: Additional Bulk Pre-Qualification Info SBCT = 3 Allegiance = P Eschalon = 4 VarTec = 4 Overall = /21/03 CM will follow-up with a possible resolution that has been implemented to satisfy this request. 12/17/02 Referred to Process Group. 10/15/02 New to List. Rated by CLECs. STATUS: New 13 C Description: Add the information that exists in CSI to the Bulk Pre-Qualification information database. Process: Pre-Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All Initiator/Date: Michael Clancy, Covad Communications, 12/02/02 Title: CLEC Changes to CSI AT&T = 4 SBCT = 4 Allegiance = 4 Eschalon = P Overall = /21/03 Implementation stopped by Verizon Legal. 12/17/02 New to List. Rated by CLECs. Decision was made to move forward with rating even though VZ Legal has indicated that no information on UNE-P or existing DSL information would not be included on a loop qual transaction or Bulk Loop Extract. Description: The means should be provided for a CLEC (with valid LOA) to initiate changes to the end-user s CSI, when necessary in order to migrate end-user to the same CLEC s service. Process: Pre-Order; Jurisdiction: West; System: CSI, EDI/CORBA Primary Area: All; LSOG Version: All Initiator/Date: Linda Peterman/Bob Buerrossee, Choice One/Allegiance, 09/04/02 AT&T = 3 WorldCom = 3 SBCT = 3 Allegiance = 5 VarTec = 3.5 Covad = P ChoiceOne = 5 Call One = P 01/21/03 Conference call to be set up with Process Group and Initiator, and Tom to revisit the examples provided from the CLECs. 12/17/02 Further discussions to take place with Process Group and initiator. 10/29/02 Examples requested and received. Now awaiting additional information. 09/17/02 New to List. Rated by CLECs. Page 6 of 15

7 14 C Title: Line Sharing LSR Against Pending Overall = 3.5 for Oct C Description: Achieve a parallel process to have DSL service working by at least the day after POTS service is installed. Process: Pre-order, Order; Jurisdiction: West; System: WISE, EDI; Primary Area: All; LSOG Version: All Initiator/Date: Karen dubourg, VADI, 01/02/02 Title: Interval for T1 UNE Description: Standardize the provisioning interval for UNE T1 Loops at 9 days, matching VZ East s provisioning interval, resulting in a Standard Operating Environment for Verizon transactions. Process: Order, Provisioning; Jurisdiction: West; Systems: Primary Area: All; LSOG Version: All Initiator/Date: Michael Clancy, Covad, 08/09/02 AT&T = 2.5 WorldCom = 3 SBCT = 3 VADI = 5 Allegiance = 3 Eschalon = 3 Overall = 3.4 AT&T = 3 WorldCom = 3 SBCT = 2 Allegiance = 4 VarTec = P DSET = P 01/21/03 Waiting on magnitude accessment. 12/17/02 Scheduled as a candidate for the Oct /07/02 Conference Call held to discuss the requested specifics of CR. 10/11/02 CR Revised. No significant changes to requirements, therefore, negating the need to re-rate. 09/17/02 No change in status. VZ W researching any similar CR in the East. 06/18/02 Initiator indicated that a short term process was pending. 06/10/02 No change in status. 05/21/02 CLECs are requested to identify instances to support need for this enhancement. 04/16/02 CR moved to pending short term process improvement efforts by initiator. 02/21/02 Final SRS signed off and baselined and scheduled to be loaded into EDMS on 2/22/02. 02/18/02 Formal Inspection on the SRS (Software Requirements Specification) scheduled for 2/19/02. 02/08/02 Scheduled as candidate for Oct 02 release. 02/08/02 CR currently being discussed due to previous conference calls within the East and possible escalations. 01/16/02 Revised CRs received 01/15/02 New to List 12/17/02 Referred to Process Group. 09/17/02 Awaiting follow-up from VZ East. 08/20/02 New to list. Rated by CLECs. Page 7 of 15

8 OMT CR# C Title: CLEC Access to Scheduling Description: Allegiance needs to confirm the order activity scheduled for a given date, 48 hours or less in advance. Process: Order; Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: All; LSOG Version: All Initiator/Date: Bob Buerrosse, Allegiance Telecom, 07/05/01 Overall = 3.3 AT&T = 2 SBCT =.5 Sprint = 3 VADI = 4.5 Time Wrnr = 4 Allegiance = 5 Cox = 3 Eschalon = 4 01/21/03 First CLECs began WPTS training the week of 01/27/03. Anyone interested in training needs to contact Training and Education. WPTS link can be found on the Web Site under Local Service Providers: Tools and Applications, and scroll down to find Wholesale Provisioning Tracking System (WPTS): 11/19/02 CR will be left in open status until WPTS has been delivered. 10/23/02 WPTS was introduced at the Operations Meeting. CLECs were provided with a demo and invited to request USER Ids and other training. Verizon proposes that this CR be closed. 10/15/02 CR remains on the Development Schedule as a placeholder. WPTS deployment plans will be discussed at the Operational Meeting. It is anticipated that this will satisfy the needs of the CR, and that CLECs will be invited to beta test the system this quarter. 08/08/02 Deployment plans for WPTS in West are underway. Targeting October for walk-though of WPTS with CLEC community. 05/21/02 No change in status. 05/08/02 During Interim CMP CC: VZ indicated understanding of CLEC request to expand the WPTS status capability across the footprint. WPTS is one example of a successful test of an LNP provisioning system being gradually expanded across territories served by like operational systems. Because VZ E&W do not share common operational support systems, expansion of WPTS may require extensive system enhancement and possibly the creation of a new SPTS-like system. The WPTS graphical user interface does not currently auto generate status notifications. Enhancement of WPTS to auto-generate EDI and CORBA status notification messages will be evaluated as a candidate for the initial deployment. VZ is currently planning and evaluating options. Additional information should be available in 4Q02. AT&T and Allegiance noted the above status as unacceptable. Escalation of the issues will continue. AT&T also questioned understanding of request did not require WPTS deployment. Allegiance wanted access to internal system used by NMC to obtain status. AT&T wants EDI notification of status, not look up of status as currently performed. 04/15/02 Bob Buerrosse escalated CR. 03/19/02 Bob Buerrosse reported that Allegiance will be initiating Page 8 of 15

9 escalation process. 11/15/01 No change in status. 10/16/01 WPTS is not feasible in the West due to coordination/programming challenge being much greater with little payoff. 09/14/01 - Business Case is being written to have WPTS available in the West. Waiting on reply from Business Owners. 08/21/01 Waiting on feedback from Customer Relations/Network Operations 07/17/01 New to List. Rated by CLECs 07/09/01 Response from CLEC received. 07/06/01 Letter sent to CLEC for clarification Page 9 of 15

10 OMT CR# Title: ID UNE-P, ISDN & XDSL in Bulk Loop Qual Description: A Service Identifier needs to be included with all associated Working Telephone Numbers in the West Bulk Loop Qualification Extract. Example: Identify UNE-P, ISDN and XDSL already on line. Process: Order; Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: All; LSOG Version: All Initiator/Date: Tonya D Antonio-Patton, VADI, 07/29/01, 05/08/02 Overall = 3.3 AT&T = 4 WorldCom = 2 SBCT = P Sprint = 2 VADI = 5 Allegiance = D ICG = P Eschalon = P BTI = P 11/19/02 Implementation stopped by Verizon Legal. Challenge underway by Covad. 10/15/02 All Bulk Loop Qual Extract CRs scheduled for implementation Nov 26 are under review. A complication has been raised and so the implementation of these CRs is on hold until the questions can be resolved. All Service identifiers are on-hold pending development of generic notifiers. 09/17/02 CR has been removed from the November 26 implementation. John Rudden spoke to the possible revision or cancellation of this CR due to being challenged by Legal for Carrier Proprietary Rules. The issue deals with the level of specificity. John will discuss with Legal a modification of this CR to make the indicators generic. Change Mgmt will report back to the CLECs. 06/10/02 - CR will be implemented with a Flash Cut. All regions will go the 2 nd week in November. 06/10/02 CR has been escalated for implementation in the Oct /21/02 - Included in the discussion of Bulk Loop CRs for a Phased Approach beginning in Oct, or All at Once in February. 05/08/02 During an interim CMP Conference Call, it was agreed to modify wording of the CR to remove ISDN in request, since ADVSVC Service Type Code indicates ISDN. With ISDN removed, CR will be considered as a candidate for the Oct 02 release. 03/19/02 Conf Call to be set up with VADI to walk thru the report. 03/06/02 CR has been rescheduled as candidate for Feb 03 release. 03/05/02 Per Network Operations: this info is already contained in the Bulk Loop Qual Extract. Last 2 items in pipe delimited report meet the needs of the CR. Example of extract forwarded to initiator of CR for agreement. 01/15/02 No change in status 11/15/01 for October 02 release. 10/16/01 Rated by CLECs. 08/21/01 New to List. No representation at Aug mtg. Page 10 of 15

11 18 C for Oct 03 Title: Query Against Pending Activity Description: Ability to query against ILEC pending activity rather than just the CSR. Process: Pre-order, Order; Jurisdiction: West; System: WISE, EDI; Primary Area: All; LSOG Version: All Initiator/Date: Karen dubourg, VADI, 01/02/02 Overall = 3.3 Eschalon = 1 AT&T = 2 WorldCom = 3 SBCT = 3 VADI = 5 Allegiance = 4 01/21/03 Waiting on magnitude accessment. 12/17/02 Scheduled as candidate for Oct /07/02 Conference Call held to discuss the requested specifics of CR. 10/11/02 CR Revised. No significant changes to requirements, therefore, negating the need to re-rate. 09/17/02 No change in status. VZ W researching any similar CR in the East. 06/18/02 Initiator indicated that a short term process was pending. 05/21/02 CLECs are requested to identify instances to support need for this enhancement. 04/16/02 Moved to pending short term process improvement efforts by initiator. 04/0402 Rescheduled as a for Feb /27/02 JAD (Joint Application Design) session scheduled for Mar /08/02 Scheduled as a for Oct 02 02/08/02 CR currently being discussed due to previous conference calls within the East and possible escalations. 01/16/02 Revised CRs received 01/15/02 New to List Page 11 of 15

12 Not in DB Title: No Facilities Jeopardy Update Description: The No Facility Process requires the CLEC to resubmit an order within 30 days if the order is Jep d back with no facilities. Allegiance would like to see a more proactive response from Verizon, telling when the relief date will be for facilities if known, and provide updates if the date for relief is extended beyond the original date, or if facilities become available earlier. Process: Order; Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: All; LSOG Version: All Initiator/Date: Bob Buerrosse, Allegiance Telecom, 08/09/01 Overall = 3.1 AT&T = 1 WorldCom = 3 SBCT = 1 Sprint = 4 VADI = 4.5 Allegiance = 5 Eschalon = 3 BTI = P ICG = P 01/21/03 Will be included in Conference Call between Process Group and Allegiance to discuss CR C /17/02 Referred to Process Group 11/19/02 It was noted that this issued was not discussed during the Operations Meeting, and is still an issue with Allegiance. CLECs have asked for clarification of No Build Policy and requested that it be placed on the web-site. 09/17/02 Added to agenda for the Operations Meeting to be held in October. 04/16/02 Allegiance working with VZ Account Team to satisfy their request with a different approach. 03/19/02 Bob Buerrosse reported that Allegiance will be initiating escalation process. 11/15/01 No change in status. 10/16/01 Rated by CLECs. VZW s consistent policy has been to not provide this info to CLECs. VZ not required to build facilities to accommodate CLEC svc requests and providing planning info would be considered proprietary. IP Support does not support changing the current process, since OSP will not pursue or launch wo s or provide follow-ups and updates on facility relief. VZ does not provide relief for NO FAC conditions for UNE Wholesale activity. Note: VZE does not provide the requested info or follow-up. 08/21/01 Will not be rated until Sept Mtg Page 12 of 15

13 C Title: ANI Test at DD-2 (Due Date Minus 2) Description: Allegiance is requesting that Verizon perform an Automatic Number Identification (ANI) test at DD-2 on the CLEC collocation pin & lug, to ensure the dial tone and correct telephone numbers are received on the Verison side of the colocation. If there is no dial tone or the ANI doesn't match, VZW will notify the CLEC of jeopardy. The jeopardy notification will be an electronic notification based on the method used to send the LSR. Process: Order; Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: All; LSOG Version: All Initiator/Date: Bob Buerrosse, Allegiance Telecom, 07/05/01 Overall = 3.0 AT&T = 2 WorldCom = 3 SBCT = 2 Sprint = 3 VADI = 3 Time Wrnr = P Allegiance = 5 Cox = 3 Eschalon = 3 12/17/02 Referred to Process Group. 10/16/02 Status provided at the Operations Mtg was VZ West was seriously considering ANI Test at DD-2. No commitment. The ANI Test is an East process. 09/17/02 Added to agenda for October Operations Meeting. 08/08/02 Deployment of the process cannot be confirmed in the West at this time. 06/24/02 Scheduled as candidate for Jun /08/02 During Interim CMP CC: VZ stated that the ANI Test at DD-2 does not replace the CLEC s obligation to maintain accurate connecting facility assignments and to provision their dial tone services w/ the due date in mind. VZ understands the CLEC request to expand the DD-2 ANI test process across the footprint, however VZ cannot commit to DD-2 ANI deployment in the West at this time. The DD-2 process is another example of a successful test of a provisioning process being gradually expanded across territories served by like operational systems. Because VZ E&W do not share common operational support systems, expansion of the process will require extensive procedural, system enhancement and possibly creation of new systems. VZ is currently planning and evaluating options. Additional information should be available in 4Q02. AT&T and Allegiance noted the above status as unacceptable. Escalation of the issues will continue. Allegiance wanted access to internal system used by NMC to obtain status. AT&T wants EDI notification of status, not look up of status as currently performed. 03/19/02 Bob Buerrosse reported that Allegiance has initiated escalation process. 11/15/01 No change in status. 10/16/01 There is currently no procedure for the CO to know 2 days in advance what is due, nor is there a procedure to capture the CO time required to perform this function. A procedure would be required between the NCPC and the CO to provide this requirement on a source document. This additional step would require a new procedure and significant additional resources in both the NCPC and the CO. 09/14/01 - Business Case is being written to have WPTS available in the West. Waiting on reply from Business Owners. 08/21/01 Waiting on feedback from Customer Relations/Network Page 13 of 15

14 Operations 07/17/01 New to List. Rated by CLECs 7/09/01 Response from CLEC received. 07/06/01 Letter sent to CLEC for clarification OMT CR# On Hold and Currently Under Review Title: Flag FX in Bulk Loop Qual Description: The ILEC should identify Foreign Exchange accounts in the Bulk Loop Qual Extract. Process: Jurisdiction: West; System: WISE, EDI, CORBA; Primary Area: LSOG Version: All Initiator/Date: Tonya D Antonio-Patton, VADI, 6/7/01 Overall = 3.0 VADI = 5 AT&T = 2 WorldCom = 3 SBCT = 2 Sprint = 2 Time Wrnr = P Allegiance = 4 Cox = P Eschilon = P 11/19/02 Implementation stopped by Verizon Legal. Challenge underway by Covad. 10/15/02 All Bulk Loop Qual Extract CRs scheduled for implementation Nov 26 are under review. A complication has been raised and so the implementation of these CRs is on hold until the questions can be resolved. All Service identifiers are on-hold pending development of generic notifiers. 06/10/02 - CR will be implemented with a Flash Cut. All regions will go the 2 nd week in November. 05/21/02 Included in the discussion of Bulk Loop CRs for a Phased Approach beginning in Oct, or All at Once in February. 02/22/02 Initiative # created and project has been released for IAB Assessment. (SPM ID E1408A5, same as CR#C ) 02/20/02 Final Review for Business Requirements Document (BRD). 02/14/02 Business Application Designed (BAD) session was held. 01/15/02 No change in status 11/15/01 CR has been rescheduled as a candidate for the October 2002 release. 10/16/01 CR has been rescheduled as a candidate for the June /14/01 No change 08/21/01 - Trying to sync up with CR#2120 from the East, which contains the same request. Waiting on input from Prod Mgr. for Feb release. 07/17/01 Rated by CLECs. 07/12/01 Recovered from Banyan. Page 14 of 15

15 22 C Title: Interval for Designed ISDN Overall = 2.6 Description: Change the provisioning interval in Verizon West to match Verizon East for UNE T1. Process: Order; Jurisdiction: West; System: Primary Area: All; LSOG Version: All Initiator/Date: Michael Clancy, Covad Communications, 12/30/02 SBCT = 1 Time Wrnr = 1 Allegiance = 1 Eschilon = P VarTec = P ChoiceOne = 1 01/21/03 New to List. Rated by CLECs. Page 15 of 15

Prioritization of Change Requests CLEC Initiated (Type 5)

Prioritization of Change Requests CLEC Initiated (Type 5) 1 C03-1259 Title: T5 RESID Information on Provider Notification Overall = 5.0 STATUS: PENDING #384078 Description: RESID to be auto populated for all products when a Provider Notification is sent. Candidate

More information

Implemented Change Requests CLEC Initiated (Type 5)

Implemented Change Requests CLEC Initiated (Type 5) N/A 01-0010A Title: CSI Complex Listings/DSL/Contractual Info/Hunt Group Overall = 4.7 (Includes the intent of CR#19, 20 and 21) 01-0070 #371537 CID# 371537 Description: Return to providing DL, Caption

More information

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5)

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5) N/A 01-0002 Title: Add central office CLLI codes to WISE loop qualification. Overall = 4.1 Description: SBC wants the Host/Remote SWC CLLI code for the end user s address to be returned, which increases

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:15 AM 12:00 PM CST Place: 700 Hidden Ridge, Irving, Texas Room: W02R01 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda Agenda I) Review October

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:00 AM 12:00 PM CST Place: 600 Hidden Ridge, Irving, Texas Room: East Building, Floor 3, E03R02 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda

More information

November 2005 Items by Release Report

November 2005 Items by Release Report Oct 30, 2005 C04-0053 Title: RETAS pending status information transaction 5 6/14/05 386561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 5 Session 7 Agenda December 19, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 56 26 est C03-2347 385953 Enhance Held Order Process Eschelon 4.3 Not Scheduled 58 61 East

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

PWG Change Request History. Type 5 Session 7 Agenda

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 Meeting Participants: The participants included AT&T Local, AT&T CA/TX, Covad, Cox, Eschelon, Integra. Nationsline, Paetec, Penn Telecom, and XO. 5 Session 7 Agenda Rank C/L East CR#

More information

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting.

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting. October 14, 2009 Meeting Minutes Page 1 of 6 Changes of Interest Verizon reviewed enhancements to the Local Content on the Verizon Partner Solutions ( VPS ) Web site previously announced by the VPS Customer

More information

PWG Change Request History

PWG Change Request History January 8, 2008 Meeting Participants: The participants included Accenture, AT&T Local, AT&T CA/TX, Broadview Networks, Cablevision, Comcast, Consolidated Communications, Covad, Cox, Eschelon, Granite,

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-0032 #386535 Rating = NR Title: Retrofit for Corporate Rewards Description: The purpose of this initiative is to have Flow Through automate Corporate

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-1790 #390501 Rating = NR MCI = Birch = HTC = SBC = Choice One = Trinsic = Eschelon = Allegiance/XO = Time W = Sprint = Grande = Comcast = Electric

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release To be Rated C0-1132 #388718 Rating = NR AT&T = MCI = Birch = HTC = SBC = Choice One = Z-Tel = Eschelon = Allegiance/XO = Covad = VarTec = Cox = Title: Flow Through to Automate Disconnect Orders Without

More information

2009 OPEN CUF ISSUES

2009 OPEN CUF ISSUES 2009 OPEN CUF ISSUES Table of Contents: #1 Review Verizon Changes Of Interest to CLEC Community... 2 #116 Transition of Idaho NMC to Virginia NMC... 4 Printed: 01/14/09 Page 1 #1 Review Verizon Changes

More information

July 2005 Items by Release Report

July 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

June 2005 Items by Release Report

June 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

October 2005 Items by Release Report

October 2005 Items by Release Report C04-005 Title: RETAS pending status information transaction 5 86561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution when the ticket

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group September 14, 2005 Logistics Time: 1:00 PM 2:00 PM Place: 1095 Avenue of the Americas, New York Room: Floor 15. Room 15-01 Bridge: (800-566-2250) Chair: Jean Derrig Agenda

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 5 1 2601 C02-2712 376792 E Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change orders when an end user moves to a new address in the

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 14 October 11 Draft Business Rules (73 days) 12/05/2003 04/02/ 07/30/ Draft Technical Specifications (66

More information

OSS Interface Change Management Meeting September 14, 2004

OSS Interface Change Management Meeting September 14, 2004 OSS Interface Change Management Meeting September 14, 2004 10:00 AM 12:00 PM & 1:00 PM 2:00 PM 1095 Avenue of the Americas, New York, NY Floor 34, Room 34-17 Dial-In: (800) 347-6311 Agenda I. Welcome and

More information

OSS Interface Change Management Meeting April 12, 2005

OSS Interface Change Management Meeting April 12, 2005 OSS Interface Change Management Meeting April 12, 2005 10:00 AM 2:00 PM 1095 Avenue of the Americas, New York, NY Floor 15, Room 15-01 Dial-In: (800) 566-2250 Agenda I. Welcome and Introductions (Jean

More information

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007 5 Session 5 Agenda December 11, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 42 est 54641 Allow Service Recovery to be requested on repair trouble ticket Integra 4.6

More information

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT SUBJECT PARAGRAPH(S) PROFESSIONAL EXPERIENCE AND EDUCATIONAL BACKGROUND 2-4 PURPOSE OF AFFIDAVIT 5,6 SERVICE CENTERS DESCRIPTIONS

More information

OSS Interface Change Management Meeting October 14, 2003

OSS Interface Change Management Meeting October 14, 2003 OSS Interface Change Management Meeting October 14, 2003 10:00 AM 12:00 PM 1095 Avenue of the Americas, New York, NY Fl/Rm. 26-36 Dial-In: (312) 461-9457 Agenda I) Welcome and Introductions (Tom Rodgers)

More information

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines:

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines: Hot Cut This is a guideline that describes hot cuts that are either through an interconnection agreement or through a state tariff. The term "Hot Cut" is used in the local exchange industry to describe

More information

OSS Interface Change Management Meeting November 12, 2003

OSS Interface Change Management Meeting November 12, 2003 OSS Interface Change Management Meeting November 12, 2003 10:00 AM 12:00 PM 1095 Avenue of the Americas, New York, NY Fl/Rm. 26-36 Dial-In: (312) 461-9457 Agenda I) Welcome and Introductions (Tom Rodgers)

More information

March 2003 OSS Interface Change Management Meeting

March 2003 OSS Interface Change Management Meeting 51 Wholesale Customer 2/08/00 - Bell Atlantic told the CLECs the Help Desk Hours of Operation. Care Center/ formerly - BA to have the handbook updated with the correct hours of the Help Desk. These hours

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 Rank 1 CR#/ 2601 C02-2712 376792 E/W Description of CR CLEC Ratings Status/Comments Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change

More information

Verizon CLEC User Forum (CUF) Guidelines

Verizon CLEC User Forum (CUF) Guidelines Verizon CLEC User Forum (CUF) Guidelines Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for businessto-business discussion focused on improving communication and processes

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 Rank 1 CR#/ 2601 C02-2712 376792 E Description of CR CLEC Ratings Status/Comments Title: Standalone Digital UNE Loop Outside Moves through a Single Order rocess Description: CLECs cannot process change

More information

December, 2002 OSS Interface Change Management Meeting

December, 2002 OSS Interface Change Management Meeting - 3/13/01 - CLECs request this item remain open 26 Backwards compatibility - 6/15/99 - TCs asked that backwards compatibility be discussed at the next Change Control meeting. - 7/14/99 - BA to work with

More information

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last

More information

VERIZON MARYLAND LLC 1. Performance Assurance Plan. Maryland

VERIZON MARYLAND LLC 1. Performance Assurance Plan. Maryland VERIZON MARYLAND LLC 1 Performance Assurance Plan Maryland Version 4.0 Implementation: April, 2016 Filing Date: November 23, 2015 1 Verizon Maryland LLC is the successor to Verizon Maryland Inc. TABLE

More information

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES BELLSOUTH LONG DISTANCE, INC. 2nd Revised Page 1 d/b/a AT&T Long Distance Service Effective: October 25, 2014 4.1 General Customers are billed based on their usage of the Company's services. Rates may

More information

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely,

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely, RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS PUBLIC SERVICE COMMISSION GREG R. WHITE JOHN D. QUACKENBUSH SALLY A. TALBERG COMMISSIONER CHAIRMAN COMMISSIONER MIKE

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

FairPoint Change Management Process Agenda & Opening Remarks

FairPoint Change Management Process Agenda & Opening Remarks FairPoint Change Management Process Agenda & Opening Remarks John Berard, Director, Wholesale Customer Relations Portland, Maine July 22, 2009 Agenda Opening Remarks WebEx and Conference Call Etiquette

More information

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015 Next Steps for WHOIS Accuracy Global Domains Division ICANN 53 24 June 2015 Agenda: Next Steps for WHOIS Accuracy Reporting System 1 2 3 Introduction and Implementation Approach Pilot Project and Lessons

More information

Fairpoint Communications. Maine, New Hampshire, and Vermont. Jeopardy Notification. Version 1.1

Fairpoint Communications. Maine, New Hampshire, and Vermont. Jeopardy Notification. Version 1.1 Fairpoint Communications Maine, New Hampshire, and Vermont Jeopardy Notification Version 1.1 December 2009 Table of Contents OVERVIEW..1.0 LSR JEOPARDY CODE DEFINITION 2.0 SAMPLE LSOG 9 JEOPARDY NOTIFICATION..3.0

More information

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

Council, 8 February 2017 Information Technology Report Executive summary and recommendations Council, 8 February 2017 Information Technology Report Executive summary and recommendations Introduction This report provides the Council with an update into the work of the Information Technology Directorate

More information

Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports. Verizon Reports

Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports. Verizon Reports Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports Verizon Reports April 1, 2003 Verizon PA C2C Guidelines 1 Category Function # of Metrics Pre-Ordering PO-1 PO-2 PO-3 PO-4 PO-5

More information

Viveros Attachment W

Viveros Attachment W Viveros Attachment W DOCUMENT SWB PB/NB DESCRIP. WHERE FOUND WHEN CAN PROVIDE TO CLEC PRE-ORDERING Verigate User X X How to use Verigate. Verification Gateway (VERIGATE) is an online system which provides

More information

Customer Wholesale Portal User Guide

Customer Wholesale Portal User Guide Customer Wholesale Portal User Guide Table of Contents Overview 2 Establishing a Super User (SU) 3 Bulk Loop Qualification Extract 6 Carrier-to-Carrier Reports 7 Customer Service Record (CSR) Over 10K

More information

PUBLIC VERSION AFFIDAVIT OF VICTORIA MURRAY

PUBLIC VERSION AFFIDAVIT OF VICTORIA MURRAY PUBLIC VERSION AFFIDAVIT OF VICTORIA MURRAY TABLE OF CONTENTS SUBJECT PROFESSIONAL EXPERIENCE AND EDUCATIONAL BACKGROUND PARAGRAPH(S) 3-4 PURPOSE OF AFFIDAVIT 5-6 LSC LSC Description LSC Organization &

More information

Undergraduate Admission File

Undergraduate Admission File Undergraduate Admission File June 13, 2007 Information Resources and Communications Office of the President University of California Overview Population The Undergraduate Admission File contains data on

More information

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017 North American Portability Management, LLC Transition Oversight Manager TOEP Webcast November 7, 2017 Welcome to today s webcast Submit Questions for Q&A Webcast Issues Click the Q&A widget at the bottom

More information

Porting Timeline and Process

Porting Timeline and Process Porting Timeline and Process CallTower New Service Provider (CallTower ) Old Service Provider (Losing ) On first thought, moving your phone numbers from provider to provider seems like a simple idea. But

More information

10. Unbundled Dark Fiber 10.1 General

10. Unbundled Dark Fiber 10.1 General Verizon New England Inc. Page 1 Second Revision Canceling First Revision 10.1 General 10.1.1 Description A. For purposes of this Part B, Section 10, the terms business line, fiber-based collocator, and

More information

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT IT Updates Maryland Health Benefit Exchange Board Meeting April 15, 2014 Presented by: Isabel FitzGerald Secretary, DoIT A service of Maryland Health Benefit Exchange Agenda Overview of process for CT

More information

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast December 12, 2017

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast December 12, 2017 North American Portability Management, LLC Transition Oversight Manager TOEP Webcast December 12, 2017 Welcome to today s webcast Submit Questions for Q&A Webcast Issues Click the Q&A widget at the bottom

More information

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online CIMA Asia Interactive Timetable 2017 2018 Live Online Version 1 Information last updated 09 October 2017 Please note: Information and dates in this timetable are subject to change. CIMA Cert BA Course

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

Frontier Communications CLEC User Forum (CUF) May 19, 2016

Frontier Communications CLEC User Forum (CUF) May 19, 2016 Frontier Communications CLEC User Forum (CUF) May 19, 2016 1 Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for business-to-business discussion focused on improving

More information

FedRAMP: Understanding Agency and Cloud Provider Responsibilities

FedRAMP: Understanding Agency and Cloud Provider Responsibilities May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration

More information

Wholesale Platform Services Overview

Wholesale Platform Services Overview Overview In this document: Overview 2 Service Types 2 Before Completing Your Order 3 Other Information to Consider 4 Change Log 8 Frontier Communications Rochester, NY Jurisdiction: FTR13 Effective Date:

More information

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online CIMA Asia Interactive Timetable 2018 Live Online Information version 8 last updated 04/05/18 Please note information and dates are subject to change. Premium Learning Partner 2018 CIMA Cert BA Course Overview

More information

EASA Data Entry in REDCap. December 2016

EASA Data Entry in REDCap. December 2016 ES Data Entry in REDCap December 2016 genda Roll call genda Review Timelines Orientation to REDCap Form Walk-through Including Data Entry Scenarios Data Dictionary Sending Data Upcoming Questions Timelines

More information

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Discussion July 12 th, 2017

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Discussion July 12 th, 2017 North American Portability Management, LLC LNPA Transition Contingency Rollback Industry Discussion July 12 th, 2017 Agenda Introduction Transition overview, definition of rollback, and background Rollback

More information

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES This document contains proprietary data and is the industrial property of Exiant Communications LLC. The reproduction or disclosure

More information

Responding to an RFP/RFQ/RFI in The Global Fund Sourcing Application Supplier Instructions

Responding to an RFP/RFQ/RFI in The Global Fund Sourcing Application Supplier Instructions Responding to an RFP/RFQ/RFI in The Global Fund Sourcing Application Supplier Instructions Version 1.1 The Global Fund 26-MAR-2018 P a g e 2 1. Contents 1. Contents... 2 2. Purpose and Scope... 3 3. Background...

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure.

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure. PAGE 1 of 11 PROCESS OBJECTIVE : To effectively manage all feedback (as defined in QM-00-01 / 02) and associated correction and corrective action in an effective and objective manner. Feedback includes

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

T Mobile Manual Contract Cancellation Fee 2012

T Mobile Manual Contract Cancellation Fee 2012 T Mobile Manual Contract Cancellation Fee 2012 As of April 5, 2012 there is a limit on the amount of data that can be used while a See your device's user manual for directions on how to update device settings

More information

PART 19 - Unbundled Network Elements and Number Portability SECTION 6 - Number Portability Original Sheet No. 1

PART 19 - Unbundled Network Elements and Number Portability SECTION 6 - Number Portability Original Sheet No. 1 PART 19 - Unbundled Network Elements and Number SECTION 6 - Number Original Sheet No. 1 1. SERVICE PROVIDER NUMBER PORTABILITY (cont d) A. DESCRIPTION Service Provider Number - Location Routing Number

More information

National Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B

National Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B National Pooling Administration Contract #FCC13C0007 2 nd Revised Change Order Proposal #3B (Development and Support of the PAS NPAC API) March 8, 2017 Neustar, Inc. 21575 Ridgetop Circle Sterling VA,

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

FairPoint Change Management Process

FairPoint Change Management Process FairPoint Change Management Process John Berard, Director Wholesale Services Portland, Maine September 16, 2010 Agenda Opening Remarks WebEx and Conference Call Etiquette Mute Phones when not speaking

More information

Due Diligence Checklist #20

Due Diligence Checklist #20 INDEX Page Summary Implementation of TTC & Coroner s Jury Recommendations...i Coroner s Jury Recommendations... 1 Signals Design... 4 Note: This updated checklist contains updates to recommendations that

More information

Verizon Change Management Meeting. Moderator: Evelyn Go August 11, :00 pm ET

Verizon Change Management Meeting. Moderator: Evelyn Go August 11, :00 pm ET Verizon Change Management Meeting Moderator: Evelyn Go August 11, 2009 2:00 pm ET Coordinator: Welcome and thank you for standing by. All lines will be open and interactive throughout today s conference.

More information

Compliance Enforcement Initiative

Compliance Enforcement Initiative Compliance Enforcement Initiative Filing and Status Update November 2, 2011 Rebecca Michael Status of the Filings NERC filed several components of the Compliance Enforcement Initiative on September 30,

More information

The IDN Variant TLD Program: Updated Program Plan 23 August 2012

The IDN Variant TLD Program: Updated Program Plan 23 August 2012 The IDN Variant TLD Program: Updated Program Plan 23 August 2012 Table of Contents Project Background... 2 The IDN Variant TLD Program... 2 Revised Program Plan, Projects and Timeline:... 3 Communication

More information

APPENDIX D MAINTENANCE AND REPAIR METRICS

APPENDIX D MAINTENANCE AND REPAIR METRICS APPENDIX D MAINTENANCE AND REPAIR METRICS APPENDIX D - MAINTENANCE AND REPAIR METRICS A - INTRODUCTION This Appendix discusses each of the Verizon PA s five (5) Maintenance and Repair metrics, which are

More information

JU Stakeholder Engagement Webinar

JU Stakeholder Engagement Webinar JU Stakeholder Engagement Webinar April 21, 2017 draft for discussion Agenda for April 21 st 9:00AM 10:30AM EDT The April 21 st agenda will include presentations and Q&A sessions on the following topics:

More information

Harnessing the Power of Visibility

Harnessing the Power of Visibility Harnessing the Power of Visibility Isaac Cronkhite VP Enterprise Analytics Great Lakes AIM August, 17 2017 1 Informed Visibility Update 2 What is Informed Visibility? IV is a near real-time enterprise

More information

2007 CLOSED CUF ISSUES

2007 CLOSED CUF ISSUES 2007 CLOSED CUF ISSUES Table of Contents: # 85 CNR Process... 2 #91: E911 Updates... 5 # 96 Maintenance Dispatch Out Process Change... 8 #103 Reduce Repeated Truck Rolls... 10 #105 Vendor Meet Billing

More information

Prepared Testimony of. Bohdan R. Pankiw. Chief Counsel Pennsylvania Public Utility Commission. before the

Prepared Testimony of. Bohdan R. Pankiw. Chief Counsel Pennsylvania Public Utility Commission. before the Prepared Testimony of Bohdan R. Pankiw Chief Counsel Pennsylvania Public Utility Commission before the Pennsylvania Senate Consumer Protection and Professional Licensure Committee and Pennsylvania Senate

More information

Embracing Competition Stakeholder Engagement Workshop no May 2018

Embracing Competition Stakeholder Engagement Workshop no May 2018 Embracing Competition Stakeholder Engagement Workshop no. 26 22 May 2018 Welcome and opening remarks Mark Adolphus, Director of Connections 2 Agenda 09:45 10:00 Coffee and registration 10:00 10:05 Welcome

More information

9 - BellSouth Directory Assistance Access (D) (D)

9 - BellSouth Directory Assistance Access (D) (D) Four AT&T Plaza, Dallas, Texas 75202 2ND REVISED PAGE 9-1 CANCELS 1ST REVISED PAGE 9-1 ISSUED: APRIL 6, 2015 EFFECTIVE: APRIL 21, 2015 9 - BellSouth Directory Assistance Access (D) (D) 9.1 BellSouth Directory

More information

How to Port Numbers with Twilio

How to Port Numbers with Twilio How to Port Numbers with Twilio Table of Contents Overview Why Port Numbers to Twilio Best Practices for Porting with Twilio Instructions on How to Port with Twilio Porting Types Port Request Rejections

More information

ATNP Configuration Control Board (CCB) Procedures Document

ATNP Configuration Control Board (CCB) Procedures Document -WP/66 15 March 1996 AERONAUTICAL TELECOMMUNICATION NETWORK PANEL CCB Standing Document ATNP Configuration Control Board (CCB) Edited by CCB Chair SUMMARY This document contains detailed procedures to

More information

Interim Report Technical Support for Integrated Library Systems Comparison of Open Source and Proprietary Software

Interim Report Technical Support for Integrated Library Systems Comparison of Open Source and Proprietary Software Interim Report Technical Support for Integrated Library Systems Comparison of Open Source and Proprietary Software Vandana Singh Assistant Professor, School of Information Science, University of Tennessee,

More information

Colligo Briefcase for Mac. Release Notes

Colligo Briefcase for Mac. Release Notes Colligo Briefcase for Mac Release Notes Contents Technical Requirements... 3 Release 7.5 06 Oct0ber 2017... 4 New in this Release... 4 Release 7.5 18 May 2017... 4 New in 7.5... 4 Issues 7.5... 5 Known

More information

Grid Security Policy

Grid Security Policy CERN-EDMS-428008 Version 5.7a Page 1 of 9 Joint Security Policy Group Grid Security Policy Date: 10 October 2007 Version: 5.7a Identifier: https://edms.cern.ch/document/428008 Status: Released Author:

More information

WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January ICANN GDD Operations NORC at the University of Chicago

WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January ICANN GDD Operations NORC at the University of Chicago WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January 2016 ICANN GDD Operations NORC at the University of Chicago Webinar Agenda 1 2 3 WHOIS ARS Background Phase 2 Cycle 1:

More information

Customer Service Record (CSR) Inquiry Process

Customer Service Record (CSR) Inquiry Process Customer Service Record (CSR) Inquiry Process Carrier Services Frontier Communications Rochester, NY Effective: 11/05/2014 Revised: 10/25/2017 Contents Customer Service Record Inquiry... 3 Overview...

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

National Smart Metering Program Testing Framework Work Stream Actions Log

National Smart Metering Program Testing Framework Work Stream Actions Log - ustomer section of the table Description / Progress Source/Origin Workstream/ owner Who By When Status Reporting 20090923 4 TFWG need to feed into the BPPWG the issues about service levels and performance

More information

Privacy and Proxy Service Provider Accreditation. ICANN58 Working Meeting 11 March 2017

Privacy and Proxy Service Provider Accreditation. ICANN58 Working Meeting 11 March 2017 Privacy and Proxy Service Provider Accreditation ICANN58 Working Meeting 11 March 2017 Agenda 13:45-15:00 15:00-15:15 15:15-16:45 Timeline Check; Policy Document Update; Third- Party Requests Break PSWG

More information

FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES Updated: 10/19/2018 This document contains proprietary data and is the industrial property of Farmers Telecommunications.

More information

Georgia Public Service Commission

Georgia Public Service Commission Georgia Public Service Commission 244 WASHINGTON STREET SW ATLANTA, GEORGIA 30334-5701 (404) 656-4501 OR 1 (800) 282-5813 SUMMARY OF 5778-U DATA REQUEST 2 JANUARY 2005 REPORT The Commission established

More information

MA SREC-II Extension Application Instructions

MA SREC-II Extension Application Instructions MA SREC-II Extension Application Instructions Qualification in SREC-II Less than or equal to 25 kw Systems interconnected on or before January 8, 2017 Original SREC-II factors Systems interconnected after

More information

September 2010 November 2010 Area 14 Training Catalog

September 2010 November 2010 Area 14 Training Catalog September 2010 November 2010 Area 14 Catalog Art Ciesla, C.B.A. Area Quality Leader Coordinator Email: Art_Ciesla@apd.state.fl.us (863) 413-3374 Instructions for registering for training: If you're from

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) The New Jersey Board of Public ) Utilities Petition for Delegated ) CC Docket No. 95-116 Authority to Implement

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.bid.ci.norwalk.ct.us. Adobe Acrobat reader is required to view this document.

More information