1 2007 CLOSED CUF ISSUES Table of Contents: # 85 CNR Process... 2 #91: E911 Updates... 5 # 96 Maintenance Dispatch Out Process Change... 8 #103 Reduce Repeated Truck Rolls #105 Vendor Meet Billing Issue #107 FTTP/Two LSRs #109 Jeopardy for Incorrect NC/NCI Codes No Conditioning Required #110 NC/NCI Codes Required on Line Share to Line Split Orders #111 DSL Port Intervals #112 UNE-L Maintenance Tickets #113 Smart Jack Installations # 114 Porting of DIDs Riding on a PRI 32 OPERATIONAL SUMMIT ISSUES/DISCUSSION TOPICS #1 Reducing the Rate of Failures on Cut-Thru Orders #2 On New Installations, Verizon Does Not Always Connect the Inside Wire to the NID #3 Joint Acceptance Testing Not Always Completed #4 Expand the Process for NODR Billing for Wholesale Advantage Printed: 01/22/08 Page 1

2 # 85 CNR Process CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC NAME: Z-Tel Communications, Inc. 2. INTERNAL CONTACT & PHONE NUMBER: Peggy Rubino (813) SUBMISSION DATE: September 15, SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 5. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 6. SELECT STATE(S) WHERE ISSUE OCCURS: Ancillary Services (OS/DA/DL, etc.) Other General Issue Connecticut Maryland New Jersey Rhode Island Washington, DC Delaware Massachusetts New York Vermont West Virginia Maine New Hampshire Pennsylvania Virginia Entire Footprint 7. DESCRIBE THE ISSUE: At the August CMP meetings (East and West), Verizon introduced C to make contact information required rather than optional to minimize repeat dispatches. The CLECs generally supported this request with the caveat that a process be developed to ensure that calls are actually made to the contact number prior to Verizon declaring a no access or customer not ready condition. The process should include some confirmation provided to Verizon by the CLEC that the customer or premises is unavailable, and ideally that confirmation would flow to the wholesale bills to reduce the number of disputes regarding this issue. 8. PROVIDE EXAMPLE(S): 9. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: Covad and Verizon have an agreement under which Covad will provide a confirmation number when it is unable to reach the customer to arrange access. A similar process could be used for other CLECs. Printed: 01/22/08 Page 2

3 CUF REVIEW DATE: 5/11/ Issue Accepted? Yes / No If No, give reason:. 11. Assigned Issue # 85 and Entitled: CNR Process. 12. Other CLECs Supporting Issue: Mettel. 13. Issue Closed: 5/9/ Agree to Disagree GENERAL MEETING MINUTES 5/9/2007 It was agreed to close this issue. This issue is aligned with Operations Summit Issues #2 and #3, which were closed 5/9/07. See Discussion Topics. 3/14/2007 Covered under Discussion Topics. 12/13/2006 Covered under Discussion Topics. 9/13/2006 Covered under Discussion Topics. 7/12/2006 Covered under Discussion Topics. 5/10/2006 No new updates were reported from the March meeting except that Tom Delaney had received some data from a few CLECs and was working with those companies individually. Verizon is still in need of more examples from the other CLECs but the expectation is there will more data now available to the CLECs with the addition of TT data on the BDT effective April 16, 2006 in the East. 3/15/ Included as part of Discussion Topics. 1/11/2006 Tom Delaney reported that Elliot Goldberg (Mettel) provided him with a copy of the FCC order regarding Carrier-to-Carrier measurements. According to the order the Commission recommended that CLECs and Verizon work together to design a process that will benefit all with regard to CNRs. Mettel feels that the Commission is requesting that Verizon work with the CLEC to determine how Verizon would handle CNRs. 11/9/2005 Tom Delaney advised that he has received samples from Elliot Goldberg (Mettel) and has advised all that he will hold internal discussions and provide feedback at the next CUF session. the process of reviewing them. He will reach out to Elliot to discuss further following his research and review. 9/13/2005 Tom Delaney explained that the issue is a serialization process for POTS lines. Verizon does not do this with POTS. Tom advised that the technician will attempt to call the contact listed on the LSR. He further explained that in the Retail side of the house, the technician will leave a card. CLECs requested that the Verizon technician call them when they are at the premise. Tom advised that our process is for Technicians to attempt to call. Mettel argued that the Verizon Technicians do not call and as a result, Mettel is getting billed for No Access. Verizon asked Mettel for samples of when the Verizon Technician did not follow the process so that appropriate investigation can be performed 7/13/05 Zina Beverly, sitting in for Tom Delaney, reported that Tom is still reviewing the process and does not have additional information to offer at this time. Zina requested that the issue remain open until Tom s return. 5/11/05 - Tom Delaney reported that Verizon will not change existing process. Mettel asked if Verizon would object to having the Vz Technician contact the CLEC and provide the CLEC Service Order or Repair Ticket numbers. Tom informed all that he will research and provide feedback at the next CUF meeting. 3/7/05 VZ s wholesale CNR process is in parity with retail. Mettel expressed concern though about being billed for CNRs that they did not believe were CNRs. VZ agreed to leave issue open awaiting additional review by VZ senior management. 1/12/05 Preliminarily, VZ is not able to implement serial number process (this is part of the process that has been set up for DSL) for voice. Retail voice does not have a CNR process so it may not be appropriate to establish a CNR process for wholesale voice. Tom to ensure VZ senior level agreement on this position. 11/10/04 This issue is being addressed by a VZ internal team. Tom Delaney expects a readout in approximately 4 weeks. Readout will be sent as soon as it is available. 9/15 A CNR process is followed on DSL, but not on POTS, UNE-P, etc. CLECs specified that they would like this process for provisioning and maintenance. Tom Delaney has submitted the CUF s request for this process to Printed: 01/22/08 Page 3

4 be implemented on POTS, UNE-P, etc to a VZ team that is looking a process changes that will reduce unproductive dispatches. Tom will interface between the internal team and the CUF. Printed: 01/22/08 Page 4

5 #91: E911 Updates CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC NAME: MCI 2. INTERNAL CONTACT & PHONE NUMBER: Lissa Provenzo SUBMISSION DATE: 3/2/05 4. SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 5. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 6. SELECT STATE(S) WHERE ISSUE OCCURS: Ancillary Services (OS/DA/DL, etc.) Other General Issue Connecticut Maryland New Jersey Rhode Island Washington, DC Delaware Massachusetts New York Vermont West Virginia Maine New Hampshire Pennsylvania Virginia Entire Footprint 7. DESCRIBE THE ISSUE: To improve the current process to update E911 discrepancies or update street address that has been renumbered. Current process is to send a Move order to correct the E911 or renumbered street address discrepancies, which interfere with the customer service. Steven Cuttle and the NMC requested this go to the CUF. The NMC has been requesting this for over a year to the policy procedure SMEs at Verizon. 8. PROVIDE EXAMPLE(S): 9. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: Create a process that allows updates without sending a Move order to VZ CUF REVIEW DATE: 3/7/05 Printed: 01/22/08 Page 5

6 10. Issue Accepted? Yes / No If No, give reason:. 11. Assigned Issue # 91 and Entitled: E911 Updates. 12. Other CLECs Supporting Issue: AT&T, RNK, Broadview 13. Issue Closed: _7/11/ Agree to Disagree: GENERAL MEETING MINUTES 7/11/07 - The initiative to provide CLECs the ability to submit an LSR for a Records order (ACT = R) requesting an E911 service address update was completed in June, and there are no open issues. Two notifications were sent to the carrier community and the information was also posted on the VPS Web Site. It was agreed to close this issue. 5/9/07- The initiative for this issue is scheduled for the June 2007 release. In addition the manual process for updating addresses in the West will still be available until October /14/07 Margaret Detch reported that the initiative for this issue is still scheduled for the June 2007 release. 12/13/2006 Peter Bahr reported that an initiative is scheduled for the June 2007 release for record orders to be issued by the CLECs for UNE-P and Resale address updates. He also encouraged the CLECs to update the Customer Profile Database with contact names as Verizon will be contacting the CLECs when a 911 call is made and an address discrepancy is found. This issue will remain in the CUF until the initiative is completed. 9/13/2006 Verizon has nothing new to report and continues to work on developing a footprint wide solution. Verizon hopes to have feedback for the long term process by the December CUF meeting. 7/12/2006 Verizon is continuing to work on developing a footprint wide process, however, Verizon has not yet been able to identify an efficient and cost effective automated solution. The current trial that is underway in the South Region is a very manual process and does not have internal buy-in to be deployed footprint wide. 5/10/2006 The original trial is continuing in the Verizon South region, however, a workable process that could be deployed footprint wide has not been identified. The trial model involves a number of manual handoffs, which is not supportable on a larger scale. The internal Verizon team continues to work with impacted groups in VZ to identify a plan that will work across the footprint. The CLEC sub team will be reconvened when VZ has a workable plan to present. 3/15/2006 Rosemary Hernandez advised that the trial is continuing in the South. However, it will not be rolled out in other States unless there is agreement from the operations centers. Meetings are underway with the operations centers in an effort to create a method for E-911 address discrepancy corrections. Another sub committee meeting will be held when more information is known about the trial in the South or further roll out of the process. 1/11/2006 Beth Cohen reported the trial is continuing. The Local Service Provider Form has been updated to include the CLEC s E-911 Contact information. Trinsic requested that a subcommittee meeting be scheduled since one has not taken place for some time. Beth advised that Rosemary Hernández will set one up and notify the Subcommittee team prior to the next CUF session. 11/9/ Rosemary Hernandez advised that the subcommittee meetings continue to take place. Per the last meeting, the trial in the South continues to run smoothly and CLECs have provided feedback to the subcommittee team of their satisfaction with the trial. Rosemary advised that PLM is still in the data gathering phase and will not be opening the trial to other states pending further review. In addition, Rosemary mentioned that the Profile Management team is now looking at modifying the Local Services Profile form to add a field whereby the CLEC may enter E-911 contact information. 9/13/ Rosemary Hernández reported that the trial is ongoing and progressing very well. CLECs that have tried the new process have commented that it is an improvement over the previous process. Kathy Rysak discussed the trial and the form being used in place of the LSR. She also mentioned that the trial is solely for E- 911 address discrepancies. Any other type of address discrepancy would need to follow the normal business rules procedures. The trial has been extended as additional data needs to be gathered to determine if expanding to other Verizon states should take place. Kathy advised that she will report on progress at the next CUF session. 7/13/ Rosemary Hernández reported that there have been on going meetings with a CLEC subgroup and Verizon E-911 PLM to discuss the address discrepancy issue. Peter Bahr and Kathy Rysak provided information regarding a trial that Verizon was willing to partake in with several interested CLECs. The trial consisted of Printed: 01/22/08 Page 6

7 providing E-911 PLM with a form to correct address discrepancies vs. issuing LSRs to accomplish the same. The trial will only target the MidAtlantic states at this time. Kathy advised that part of the trial was to get "good" contact information from the CLECs and provided a list of CLECs which she needs contact information from. The new form to correct address discrepancies will be included with the minutes. Rosemary has reached out to the Profile Management Team to inquire as to whether it would be possible to update the Local Service Profile Form to include E-911 CLEC contact information and will provide an update at the next CUF meeting. This issue will remain open until all States are included. Printed: 01/22/08 Page 7

8 # 96 Maintenance Dispatch Out Process Change CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC NAME: Trinsic Communications, Inc. 2. INTERNAL CONTACT & PHONE NUMBER: Peggy Rubino (813) SUBMISSION DATE: June 28, SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 5. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 6. SELECT STATE(S) WHERE ISSUE OCCURS: Ancillary Services (OS/DA/DL, etc.) Other General Issue Connecticut Maryland New Jersey Rhode Island Washington, DC Delaware Massachusetts New York Vermont West Virginia Maine New Hampshire Pennsylvania Virginia Entire Footprint 7. DESCRIBE THE ISSUE: Verizon is closing out DPO trouble tickets as Test OK without dispatching out and without contacting the CLECs prior to closing. 8. PROVIDE EXAMPLE(S): PAD , NYB487165, MDCH468869, NYB IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: VZ should dispatch out on trouble tickets opened by the CLEC as DPO, or contact the CLEC to discuss test results if the CLEC is dispatching incorrectly. CUF REVIEW DATE: 7/13/2005 Printed: 01/22/08 Page 8

9 10. Issue Accepted? Yes / No If No, give reason:. 11. Assigned Issue # 96 and Entitled: Maintenance Dispatch Out Process Change. 12. Other CLECs Supporting Issue: Mettel, MCI. 13. Issue Closed: 5/7/ Issue Moved to Another Forum: 15. Agree to Disagree GENERAL MEETING MINUTES 5/9/07- During the March CUF meeting, Verizon kept this issue open for Peggy Rubino of Trinsic to check with her operations people. Peggy did not have any additional input. Cathy Gorman moved to close this issue, and Peggy Rubino agreed. 3/14/07 Tom Delaney reported that he reviewed this issue with Bruce Nugent and there are no general issues with the front end close out process. He moved to close the issue. Peggy Rubino of Trinsic requested that this issue remain open until she checks with her operations people. Verizon agreed to do so. 12/13/2006 Verizon reported that one CLEC sent in trouble ticket information on a Wholesale Advantage customer. Tom Delaney reported that the front end close out rate is approximately 85% with no new trouble tickets received. Only 15% of tickets that are closed out in the front end come in for testing. He confirmed that Verizon does have an automated system that calls customers to advise them when tickets are closed and that the process was reviewed on the RCMC process review call held previously during the year. He will check with Bruce Nugent to see if any CLECs have gone to him. 9/13/2006 On July 19 th, a conference call was held to review the RCMC process. This issue is being left open to continue to monitor the scrubbing process to ensure that tickets are not closed inappropriately. 7/12/2006 A conference call was scheduled to review the RCMC process on July 19 at 3PM ET. Notification will be sent via the CUF Mailbox. 5/10/2006 The CLECs would like to set up a meeting to review the process flows, originally distributed in November of 2004 to the community, with the East RCMC and West VRCC. Tom explained that there is a restructuring effort underway by Verizon to combine the two groups into one Maintenance center handling the footprint. He agreed to contact Peggy Rubino to coordinate a meeting between the CLECs and the RCMC before the next CUF meeting. Tom also advised that any CLEC interested in reviewing their data tickets should contact him to set up a meeting. 3/15/2006 Tom Delaney still has the action to meet with the CLECs on this topic. 1/11/2006 Tom Delaney advised that he had not had time to meet with the CLEC participants but will schedule a meeting before the next CUF session. 11/9/2005 Tom Delaney advised that he had a general call on Friday Nov. 4 th, with Peggy Rubino, Trinsic and other CLECs. He s received a request for additional sessions from other CLECs. Mettel requested a chart to use as a guide. Tom advised that Verizon is in the process of developing one. Additional details will be provided at the next CUF session. 9/13/ Peggy Rubino advised that the RCMC is closing tickets without contacting Trinsic and requested to see the Verizon written process that would describe when the tickets should be closed. Tom Delaney offered to hold a CLEC specific meeting to review the overall process and/or individual meetings with CLECs about their specific tickets. Interested CLECs should contact Tom or Rosemary so meetings with the appropriate Verizon subject matter experts can be arranged. 7/13/05 - VZ agreed to accept this as a new issue in order to review existing Maintenance Dispatch Out Procedures for determining if what Trinsic and other CLECs are requesting may be accommodated. Printed: 01/22/08 Page 9

10 #103 Reduce Repeated Truck Rolls CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC Name: Optimum Global Communications 2. CLEC Contact, Phone Number and Address: 3. Alternate CLEC Contact, Phone Number and Address (Optional): 4. SUBMISSION DATE: 12/19/2005 Stephen Hayes shayes@thelocalphonecompany.net 5. SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 6. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 7. SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Entire Footprint Or Check off Specific State(s) Below: Indiana New Hampshire Pennsylvania Maine New Jersey Pennsylvania - W Maryland New York Rhode Island Massachusetts North Carolina South Carolina Michigan Ohio Texas Nevada Oregon Vermont Virginia Virginia-W Washington Washington DC West Virginia Wisconsin 8. DESCRIBE THE ISSUE: Dispatched technicians close order (repair or installation) as working and tagged at Network Interface when the line is not in fact tagged and working at the interface. Printed: 01/22/08 Page 10

11 9. PROVIDE EXAMPLE(S): For line # , two dispatches after loop drop failed to provide dial tone to end user. VZ reported good to NID on third resulting in charge to CLEC. All three dispatches were to wrong address resulting in a vendor meet at the correct address. Customer dial tone was established on the fourth try. 10. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: When a Verizon technician goes to customer premise for an installation or repair, technician will call designated toll free number at company. Company will immediately call back the technician at the newly installed/repaired line to confirm completion and location of the Network Interface. CUF REVIEW DATE: 1/11/ Issue Accepted? Yes / No If No, give reason:. 12. Assigned Issue # 103 and Entitled: Reduce Repeated Truck Rolls. 13. Other CLECs Supporting Issue: Blue Casa, Choice One, McGraw. 14. Issue Closed: 5/9/ Issue moved to another Forum:. 16. Agree to Disagree GENERAL MEETING MINUTES 5/9/07- It was agreed to close this issue. This issue is aligned with Operations Summit Issues #2 and #3, which were closed 5/9/07. See Discussion Topics. 3/14/2007 Covered under Discussion Topics. 12/13/2006 Covered under Discussion Topics. 9/13/2006 Covered under Discussion Topics. 7/12/2006 Covered under Discussion Topics. 5/10/2006 Tom Delaney reported out that the Verizon Installation/Maintenance team is continuing to work with Optimum Global on their specific issues. The issue in general is part of the broader discussion topic about field operational activities. 3/15/2006 Included as part of Discussion Topics. 1/11/2006 Stephen Hayes (Optimum Global) advised that Verizon Technicians are closing out tickets or completing orders as being tagged at the demark and working, without verification. As a result, Optimum has to redispatch. Beth Cohen stated that she, Kathryn Kalajian, and Tom Delaney would talk with senior managers to inform them of the field operations concerns being raised by the CUF and report back at the next meeting. Printed: 01/22/08 Page 11

12 #105 Vendor Meet Billing Issue CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC Name: Optimum Global Communications 2. CLEC Contact, Phone Number and Address: 3. Alternate CLEC Contact, Phone Number and Address (Optional): 4. SUBMISSION DATE: Stephen Hayes, shayes@thelocalphonecompany.net Will McCarthy, SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 6. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 7. SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Entire Footprint Or Check off Specific State(s) Below: Indiana New Hampshire Pennsylvania Maine New Jersey Pennsylvania - W Maryland New York Rhode Island Massachusetts North Carolina South Carolina Michigan Ohio Texas Nevada Oregon Vermont Virginia Virginia-W Washington Washington DC West Virginia Wisconsin 8. DESCRIBE THE ISSUE: Dispatch charges are being assessed when a vendor meet is held soon after the original dispatch and the trouble is found to be with the Verizon equipment. Printed: 01/22/08 Page 12

13 9. PROVIDE EXAMPLE(S): Trouble Ticket MAAV82215 opened on 3/25/2005 for line # result good to DMARC, tagged. TT# MAAV opened 3/30/2005 for a vendor meet as Verizon tech had performed work at the wrong location. Result aerial multiple PLC to correct dropped service. A charge appeared on the 6/06/05 UNE-P invoice for MAAV82215 (but not for MAAV825796), was claimed by Optimum on 6/16/05, and denied by Verizon WBCC on 7/28/05. Claim went into escalation at that time, however the claims associate had never heard of the term vendor meet. Claim escalation finalized denial reversed on 11/07/05. Trouble Ticket MAAT opened on 12/22/2004 for line # result OK to NID, DT good to NID. Optimum tech dispatched for inside wiring discovered that there was no dial tone at NID. TT# MAAT was opened on 12/28/2004 as a vendor meet result repaired at NID, tagged, DT. On the 2/06/2005 UNE-P invoice, a charge was assessed for MAAT but not for MAAT Claim was filed on 6/30/2005, denied and escalated on 7/28/2005. Again, claims associate was not familiar with vendor meets. Claim escalation finalized denial reversed on 11/07/ IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: 1. Root cause needs to be investigated and addressed on why related trouble tickets are not having charge code (1200 series VZ Trouble Disposition Code) changed to non-chargeable code. 2. Insure education claims associates and management on vendor meets and removal of previous charges when the dispatched trouble was found to be in the Verizon side. CUF REVIEW DATE: 1/11/ Issue Accepted? Yes / No If No, give reason:. 12. Assigned Issue # 105 and Entitled: Vendor Meet Billing Issue. 13. Other CLECs Supporting Issue: McGraw, Choice One and IDT. 14. Issue Closed: 3/14/ Issue moved to another Forum:. 16. Agree to Disagree GENERAL MEETING MINUTES 3/14/2007 It was agreed to close this issue. This issue is aligned with Operations Summit issue #4, which was closed 3/14/07. See Discussion Topics. 12/13/2006 Covered under Discussion Topics. 9/13/2006 Covered under Discussion Topics. 7/12/2006 Tom Delaney confirmed that he reviewed the vendor meet tickets with the Verizon billing group. There should be no charge if the meet results in a trouble found. This issue is associated with several Operations Summit issues; i.e. mailbox solution (discrepancies between TT disposition code and narrative) and the NODR process. Therefore, it was determined that this issued will be grouped under Discussion Topics. 5/10/2006 Tom Delaney advised the CLECs that he would have the Verizon Billing group review Vendor Meet ticket information and provide a read out at the next meeting. He also will contact Will McCarthy from Optimum Global following the meeting to discuss their specific billing issues. 3/15/2006 Tom advised that CLECs should not be charged for a second visit when the second visit is as a result of the initial visit not resolving the initial issue. He will review the tickets with the WBCC and provide feed back at the next CUF session. Printed: 01/22/08 Page 13

14 1/11/2006 Stephen Hayes (Optimum Global) advised that Optimum Global submitted billing claims regarding Vendor Meet issues. Stephen stated that there is nothing on the claim form where one could advise that the claim was due to a Vendor Meet. Tom Delaney advised that he would look into the process to determine if Vendor Meet tickets are treated differently. With regard to RCMC trouble tickets, he will find out if there is disposition code that would identify Vendor Meet requests. He will provide his findings at the next CUF session. Printed: 01/22/08 Page 14

15 #107 FTTP/Two LSRs CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1 CLEC Name: AT&T Texas 2 CLEC Contact, Phone Number and Terri Mansir, , terri.mansir@att.com Address: 3 Alternate CLEC Contact, Phone Number and Address (Optional): Barry Queen, , barry.queen@att.com 4 SUBMISSION DATE: May 24, SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 6 SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 7 SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Entire Footprint Or Check off Specific State(s) Below: Indiana New Hampshire Pennsylvania Maine New Jersey Pennsylvania - W Maryland New York Rhode Island Massachusetts North Carolina South Carolina Michigan Ohio Texas Nevada Oregon Vermont Virginia Virginia-W Washington Washington DC West Virginia Wisconsin Printed: 01/22/08 Page 15

16 8 DESCRIBE THE ISSUE: As Verizon has converted customers over to their fiber network in Texas, technicians are separating the NID from the loop for re-use with Verizon s FIOS offering. When AT&T Texas submits a BB LSR with an ACT of V to install a UNE-L & LNP VZ End User to our network, VZ returns a reject back to the CLEC as Product not Available. VZ states they are unable to reconnect or install a new copper loop on this initial LSR since VZ is unable to convert its End User to the CLEC as they are currently served by Fiber to the PREM (FTTP). VZ is requiring the CLEC to submit 2 additional LSR s to convert the End User to the CLEC s network. The first LSR is to install a dry copper loop on an AB LSR with an ACT of N. Once the new loop has been installed and the LSR has profiled, the CLEC must then submit a second LSR to port the End User s telephone number over to the CLEC. In actuality, this is creating a 3 LSR process, because the first LSR receives a reject with a Product Unavailable description. This process is creating unnecessary delays in converting the End User to the CLEC along with the additional cost to the CLEC required to process multiple LSRs for this order activity. 9 PROVIDE EXAMPLE(S): AT&T Texas has already provided through its Verizon Account Management team multiple spreadsheets with examples to Verizon. These examples can be provided to the CUF as needed. 10 IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: AT&T Texas proposes that Verizon reconnect the NID to the loop and the subsequent porting of the End User occur on a single LSR with no more than a 5 business day due date. CUF REVIEW DATE: 7/12/ Issue Accepted? Yes / No If No, give reason:. 12 Assigned Issue # 107 and Entitled: FTTP/Two LSRs. 13. Other CLECs Supporting Issue:. 14. Issue Closed: 5/9/ Issue moved to another Forum:. 16. Agree to Disagree Printed: 01/22/08 Page 16

17 GENERAL MEETING MINUTES 5/9/07- At the March meeting, Verizon left this issue open for further input from Barry Queen of AT&T Texas who was not at the March meeting. Barry said he is not comfortable with the cumbersome process of issuing two and sometimes three orders. Verizon explained (as noted in previous minutes) that Verizon s process does not require three LSRs if the pre order check is done before the LSRs are submitted, however the process is not designed to accept one order due to potential out-of-service conditions. In addition, there are currently very low volumes of activity for FTTP port orders where a two LSR process is required. Cathy Gorman moved to close this issue as agree to disagree which Barry agreed. Customers stated that they may reopen this issue if the volume of FTTP port orders increase. 3/14/2007 Verizon researched the CSR process and reported that after a service order is completed, it takes two to three days for the CSR to be updated. Verizon moved to close this issue. Terri Mansir from AT&T said Barry Queen s input is needed before closing this issue. Verizon agreed to keep this issue open for Barry s input. 12/13/2006 Verizon s has no new information to report and will provide a read out in March at the next CUF meeting. 9/13/2006 Verizon s current practice is to connect the inside wire directly to the ONT and remove the copper drop and NID. When the inside wire cannot be swung to reach the ONT, a cross connect is made between the NID and the ONT and the NID becomes part of the FIOS network. Using the NID as part of the FIOS network also ensures proper bonding and grounding of the inside wire from the network and eliminates foreign voltage. If the NID is used in the FIOS network, the copper drop is disconnected. If the NID is not used, both the copper drop and NID are removed. The removal of the drop and NID eliminates the need to inventory and maintain two sets of equipment. Verizon is currently charging for the dispatch to install the loop and NID, however, there are two initiatives to suppress the charges that are tentatively scheduled for the December release. Verizon also checked with the NMCs to determine if the two orders could be related to shorten the interval. Related PONS cannot be issued for LSRs with different due dates. However, the West intervals have been reduced and using the pre order tools to check facilities will inform the CLEC whether the address is served by fiber and therefore eliminating the first order. Two orders are still required, one for the loop installation and the second for LNP. AT&T clarified that regardless of the expected improvement in intervals, they want to have the loop installation and number porting completed on the same day via one (1) LSR. Verizon explained that it does not have the capability to accept one order and agreed to look at its internal processes to determine if the loop installation and number porting could be completed on the same day via one (1) LSR. Verizon also agreed to investigate the CSR process after a number is ported. 7/12/2006. This issue was presented at the July meeting and accepted into the CUF as issue # 107. Verizon agreed to review the policy issue regarding the removal of the NID for fiber overlay. Verizon also agreed to check with the NMCs to determine if the two orders could be related in order to shorten the interval. Printed: 01/22/08 Page 17

18 #109 Jeopardy for Incorrect NC/NCI Codes No Conditioning Required CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC NAME: Integra Telecom 2. INTERNAL CONTACT & PHONE NUMBER: 3. SUBMISSION DATE: Laurie Fredricksen 4. SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 5. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) Ancillary Services (OS/DA/DL, etc.) Other General Issue 6. SELECT STATE(S) WHERE ISSUE OCCURS: Verizon West States of Washington and Oregon 7. Connecticut Maryland New Jersey Rhode Island Washington, DC Delaware Massachusetts New York Vermont West Virginia Maine New Hampshire Pennsylvania Virginia Entire Footprint DESCRIBE THE ISSUE Integra has recently starting seeing JEP s for incorrect NC/NCI codes when we have used the correct NC/NCI codes based on the loop qual at the time we submit our order. 8. PROVIDE EXAMPLE(S): PON RL DSL was ordered with the correct NC/NC codes of LXC- 02QB9.00A to remove LC based on the loop qual. The day after the due date, we received a JEP notice saying the loop meets Verizon requirements for DSL and the conditioning was not required, the CKT should be ARSU, not ARFU. 9. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: Integra proposes that if an LSR is submitted using NC/NCI codes for conditioning and Verizon is able to find facilities that do not require conditioning that they complete the order with out JEP ing the order back to the CLEC. This would allow our end users to get the service they have ordered on the expected due date. CUF REVIEW DATE: 12/13/ Issue Accepted? Yes / No If No, give reason:. Printed: 01/22/08 Page 18

19 11. Assigned Issue #109 and Entitled: Jeopardy for Incorrect NC/NCI Codes-No Conditioning Required. 12. Other CLECs Supporting Issue:. 13. Issue Closed: 5/9/ Issue moved to another Forum:. 15. Agree to Disagree Printed: 01/22/08 Page 19

20 GENERAL MEETING MINUTES 5/9/07-. This issue had been left open from the March meeting in order for CLECs to provide additional examples. No further examples have been submitted by the CLECs. Laurie Fredericksen of Integra agreed that the issue can be closed. 3/14/2007 Verizon reviewed the samples from Integra (four orders) and AT&T (33 orders). Only one sample from Integra was an example of Issue 109 where Verizon sent a late jeopardy notice advising Integra that conditioning was not required and requested Integra to sup the order with new NC/NCI codes. Cathy Gorman explained that the CLEC shouldn t be losing the due date. Verizon explained that if Engineering follows current procedures and the CLEC sups the order within 24 hours, the CLEC should be able to keep the original due date. Verizon s current policy allows one day for Engineering to review the order in queue and five days for Construction to complete the conditioning. In this case, Engineering should have returned the jeopardy within 24 hours to the CLEC for a sup, and since conditioning was not required, the original due date could have been retained. If more of these situations arise, Verizon will go back to Engineering to provide coaching on the process. Integra wanted to know why it had to sup the order to begin with if the loop qual database gave Integra the information.. Beth Abesamis explained that it could be a timing issue as the loop qual database is continuously updated. Beth Cohen concurred that the information changes regularly. Beth Abesamis requested CLECs provide examples of orders in which they put conditioning codes and Verizon jep d back the order that the conditioning code is not needed. Cathy Gorman then reviewed the research on the remaining order samples provided by the CLECs. Two thirds of the samples were examples of orders where the CLEC did issue the LSR with the correct NC/NCI codes for conditioning. Verizon failed to provide the correct information back to the CLEC advising that a work order was required and the due date needed to be lengthened. Verizon is providing coaching to Engineering and NMC employees to review the correct codes and handling of these types of orders. In addition, Verizon has an initiative pending that will care for this issue by identifying NC/NCI codes that require longer due dates and will provide the CLECs with the longer due date upfront. The initiative is a candidate for the October 2007 release. The rest of the samples were for CLEC orders where conditioning was not required and excessive bridge tap needed to be removed. The samples were too old for Verizon to verify if the LQ information was accurate. Verizon will keep this issue open and encourages the CLECs who are experiencing this problem to send current samples to the CUF mailbox so Verizon can investigate. 12/13/2006 Integra Telecom presented a new issue involving the receipt of jeopardy notices for incorrect NC/NCI codes when the correct codes were used based on the loop qual at the time the order was submitted. In the example they provided, the jeopardy notice advised Integra that conditioning was not required and they were requested to sup the order with new NC/NCI codes. Integra proposes that if Verizon can find facilities that do not require conditioning, that the order be completed without a jeopardy notice being sent. The issue was accepted into the CUF as issue # 109 but the proposed resolution is not accepted. Verizon believes there may be a timing issue between the time when the loop qual is complete and when the order is submitted. Verizon agreed to review examples that were submitted and to determine if the same due date can be retained even if a supplemental order is required Printed: 01/22/08 Page 20

21 #110 NC/NCI Codes Required on Line Share to Line Split Orders CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC Name: TC3 Telecom 2. CLEC Contact, Phone Number and Dale Horn, , dale.horn@tc3net.com Address: 3. Alternate CLEC Contact, Phone Number and Address (Optional): 4. SUBMISSION DATE: 10/23/ SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access OTHER (Please Specify): Resale 6. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 7. SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or UNE Specials/IOF (Local Tariffs) Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Indiana Maine Maryland Massachusetts Michigan Nevada Entire Footprint Or Check off Specific State(s) Below: New Hampshire Pennsylvania Virginia New Jersey Pennsylvania - W Virginia-W New York Rhode Island Washington North Carolina South Carolina Washington DC Ohio Texas West Virginia Oregon Vermont Wisconsin Printed: 01/22/08 Page 21

22 8. DESCRIBE THE ISSUE: Converting line share to line split, requires line split NC/NCI to match the line share NC/NCI code. This causes unnecessary work for both CLEC and Verizon in addition to possible double billing. 9. PROVIDE EXAMPLE(S): Let's say the customer originally requested DSL service in November, At that time, the customer's phone line had 1 load coil on it. A line share DSL PON was submitted in WISE with an NC/NCI code that requested the removal of that load coil. Using this code, the WISE system due dates the order out 11 working days. This allows time for engineering to create a work order to have the load coil removed and schedule manpower to do the work. The load coil was removed and the order completed providing the customer DSL service. Now, in 2006, the customer decides to migrate the phone service as well to the same CLEC that provides the DSL service. When submitting this line splitting PON, the system requires that a line splitting NC/NCI code be used that matches the original line share NC/NCI code. That means we again must submit a code that requests the removal of a load coil that was removed three years ago. This causes the order to be due dated out 11 working days again since we are requesting the removal of a non-existent load coil. We then have to contact NOMC, give them the long explanation that this work does not have to be done, and request to have the due date pulled back to three days. This causes unnecessary work on both our parts. There is also the issue of billing. There is a charge to remove the load coil if the loop is over 12kft. 10. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: Eliminate the requirement to match line share / line split NC/NCI codes. Once the conditioning takes place on the line share order we should not have to make the same request on the line split order. CUF REVIEW DATE: 12/13/ Issue Accepted? Yes / No If No, give reason:. 12 Assigned Issue # 110 and Entitled: NC/NCI Codes Required on Line Share to Line Split Orders. 13. Other CLECs Supporting Issue:. 14. Issue Closed: 7/11/ Issue moved to another Forum:. 16. Agree to Disagree GENERAL MEETING MINUTES 7/11/07 At the May CUF meeting, Verizon agreed to keep this issue open to see if they could provide a work-around for TC3 Telecom, which Verizon was able to do. Laurie Fredericksen of Integra asked if the work-a-round would be available for other CLECs. Cathy Gorman said that there were no other CLECs that were experiencing this problem; and in the future, if a CLEC does experience the same problem, they should notify Verizon and Printed: 01/22/08 Page 22

23 Verizon will look into providing assistance. At the last meeting, Dale Horn of TC3 Telecom agreed to close this issue, and it will be closed as of the July CUF meeting. 5/9/07- Verizon verified that this is a known ordering issue but that it would require significant systems work to fix it. Verizon needs to determine the volume of these types of orders in order to evaluate this further. TC3 Telecom stated it issues approximately of these orders per month. At our last meeting, Verizon kept this issue open and encouraged CLECs to submit order volume data. Verizon did not receive any additional data from the CLECs. Verizon will keep this issue open to investigate whether a work-a-round can be found for TC3 Telecom and other CLECS who may find themselves in the same situation. 3/14/2007 Verizon verified that this is a known ordering issue. Product Line Management has been reviewing this issue to determine if an initiative could fix this situation. The systems work identified to date is very expensive. Verizon needs to determine the volumes of theses type of orders. Verizon will keep this issue open and encourages CLECs to submit order volume data. 12/13/2006 TC3 Telecom presented a new issue that when an order is submitted to convert line share to line split, the order requires the line split NC/NCI codes to match the line share NC/NCI codes from the original order. This results in unnecessary work for Verizon (for example, the codes trigger Verizon to perform engineering work to remove a load coil that had been removed on the original line share order) and possible double billing for the removal of the load coil. The issue was accepted into the CUF as issue # 110. Verizon will speak to Mike Clancy regarding different migration strategies previously discussed in Change Management for additional information on this issue. Printed: 01/22/08 Page 23

24 #111 DSL Port Intervals CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC Name: Cox Communications 2. CLEC Contact, Phone Number and Address: 3. Alternate CLEC Contact, Phone Number and Address (Optional): 4. SUBMISSION DATE: 10/4/2006 Gayle Gissendanner (757) Gayle.gissendanner@cox.com 5. SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 6. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Porting Intervals Billing (Process) Maintenance and/or Repair (Process) 7. SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Entire Footprint Or Check off Specific State(s) Below: Indiana New Hampshire Pennsylvania Maine New Jersey Pennsylvania - W Maryland New York Rhode Island Massachusetts North Carolina South Carolina Michigan Ohio Texas Nevada Oregon Vermont Virginia Virginia-W Washington Washington DC West Virginia Wisconsin Printed: 01/22/08 Page 24

25 8. DESCRIBE THE ISSUE: Cox Communications would like to see the DSL porting intervals reduced from (7) days to (3) days to mirror the standard porting intervals. With the implementation of CO5-1642/ T5 Disconnect DSL on shared loop where the TN and facility is ported, there is no need for the extended DSL interval to remain in effect. 9. PROVIDE EXAMPLE(S): 10. IF CLEC HAS PROPOSED RESOLUTION, PLEASE DESCRIBE: CUF REVIEW DATE: 12/13/ Issue Accepted? Yes / No If No, give reason:. 12. Assigned Issue # 111 and Entitled: DSL Port Intervals. 13. Other CLECs Supporting Issue:. 14. Issue Closed: 5/9/ Issue moved to another Forum:. 16. Agree to Disagree GENERAL MEETING MINUTES 5/9/07- Verizon confirmed this initiative was implemented in April 2007, with no issues reported. Two notifications were sent out and the information posted on the Verizon Partner solutions website. Cathy Gorman moved to close this issue. Gayle Gissendanner from Cox Communications agreed. 3/14/2007 Verizon reported that the DSL porting intervals will be reduced from seven business days to three business days with the April release. Verizon will keep this issue open until the implementation is complete. 12/13/2006 Cox Communications presented a new issue requesting that DSL porting intervals be reduced from seven days to three days to mirror the standard porting intervals. The issue was accepted into the CUF as issue # 111. Verizon explained that there are on-going work efforts to reduce intervals, and that they will share information on the status of this issue in January. Some industry carriers do not want the interval reduced. For example a reduced interval could provide problems for DSL providers that utilize line splitting. If changes are made to the interval prior to the next CUF meeting scheduled for March, the notification process is via an Industry letter. Printed: 01/22/08 Page 25

26 #112 UNE-L Maintenance Tickets CLEC SUBMITTING ISSUE SHOULD COMPLETE ITEMS 1 through 8. (Item 9 is optional): 1. CLEC Name: Broadview Networks 2. CLEC Contact, Phone Number and Address: 3. Alternate CLEC Contact, Phone Number and Address (Optional): 4. SUBMISSION DATE: 9/26/06 Jennifer Kuhns jkuhns@broadviewnet.com 5. SELECT PRODUCT(S) THIS ISSUE AFFECTS: (Double-click on box(es) to mark) Collocation Line-Sharing Special Access (FCC Tariff) DSL Line-Splitting UNE-Loop Interconnection/IXC LNP UNE-Platform Interconnection/Switched Access Resale UNE Specials/IOF (Local Tariffs) OTHER (Please Specify): 6. SELECT THE ISSUE CATEGORY: Pre-Order (Record Verification) Ordering (Process) Provisioning (Process) Billing (Process) Maintenance and/or Repair (Process) 7. SELECT WHERE ISSUE OCCURS: Entire Verizon East Or Entire Verizon West Or Ancillary Services (OS/DA/DL, etc.) Other General Issue California Connecticut Delaware Florida Idaho Illinois Entire Footprint Or Check off Specific State(s) Below: Indiana New Hampshire Pennsylvania Maine New Jersey Pennsylvania - W Maryland New York Rhode Island Massachusetts North Carolina South Carolina Michigan Ohio Texas Nevada Oregon Vermont Virginia Virginia-W Washington Washington DC West Virginia Wisconsin Printed: 01/22/08 Page 26

2009 OPEN CUF ISSUES

2009 OPEN CUF ISSUES 2009 OPEN CUF ISSUES Table of Contents: #1 Review Verizon Changes Of Interest to CLEC Community... 2 #116 Transition of Idaho NMC to Virginia NMC... 4 Printed: 01/14/09 Page 1 #1 Review Verizon Changes

More information

Verizon CLEC User Forum (CUF) Guidelines

Verizon CLEC User Forum (CUF) Guidelines Verizon CLEC User Forum (CUF) Guidelines Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for businessto-business discussion focused on improving communication and processes

More information

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting.

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting. October 14, 2009 Meeting Minutes Page 1 of 6 Changes of Interest Verizon reviewed enhancements to the Local Content on the Verizon Partner Solutions ( VPS ) Web site previously announced by the VPS Customer

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:00 AM 12:00 PM CST Place: 600 Hidden Ridge, Irving, Texas Room: East Building, Floor 3, E03R02 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda

More information

PWG Change Request History. Type 5 Session 7 Agenda

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 Meeting Participants: The participants included AT&T Local, AT&T CA/TX, Covad, Cox, Eschelon, Integra. Nationsline, Paetec, Penn Telecom, and XO. 5 Session 7 Agenda Rank C/L East CR#

More information

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007 5 Session 7 Agenda December 19, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 56 26 est C03-2347 385953 Enhance Held Order Process Eschelon 4.3 Not Scheduled 58 61 East

More information

CUF MEETING MINUTES *Notes from meetings previous to July 24, 2001, and relevant to a topic, have been archived separately.

CUF MEETING MINUTES *Notes from meetings previous to July 24, 2001, and relevant to a topic, have been archived separately. May 11, 2005 Meeting Minutes 1. Review of New Business and/or Issues No new issues were presented. Two issues (83 and 86) were closed. 2. Special Presentations There were no special presentations. 3. Review

More information

Local Telephone Competition: Status as of December 31, 2010

Local Telephone Competition: Status as of December 31, 2010 Local Telephone Competition: Status as of December 31, 2010 Industry Analysis and Technology Division Wireline Competition Bureau October 2011 This report is available for reference in the FCC s Reference

More information

Arizona does not currently have this ability, nor is it part of the new system in development.

Arizona does not currently have this ability, nor is it part of the new system in development. Topic: Question by: : E-Notification Cheri L. Myers North Carolina Date: June 13, 2012 Manitoba Corporations Canada Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of

More information

Manufactured Home Production by Product Mix ( )

Manufactured Home Production by Product Mix ( ) Manufactured Home Production by Product Mix (1990-2016) Data Source: Institute for Building Technology and Safety (IBTS) States with less than three active manufacturers are indicated with asterisks (*).

More information

AGILE BUSINESS MEDIA, LLC 500 E. Washington St. Established 2002 North Attleboro, MA Issues Per Year: 12 (412)

AGILE BUSINESS MEDIA, LLC 500 E. Washington St. Established 2002 North Attleboro, MA Issues Per Year: 12 (412) Please review your report carefully. If corrections are needed, please fax us the pages requiring correction. Otherwise, sign and return to your Verified Account Coordinator by fax or email. Fax to: 415-461-6007

More information

J.D. Power and Associates Reports: Overall Wireless Network Problem Rates Differ Considerably Based on Type of Usage Activity

J.D. Power and Associates Reports: Overall Wireless Network Problem Rates Differ Considerably Based on Type of Usage Activity Reports: Overall Wireless Network Problem Rates Differ Considerably Based on Type of Usage Activity Ranks Highest in Wireless Network Quality Performance in Five Regions WESTLAKE VILLAGE, Calif.: 25 August

More information

PWG Change Request History

PWG Change Request History January 8, 2008 Meeting Participants: The participants included Accenture, AT&T Local, AT&T CA/TX, Broadview Networks, Cablevision, Comcast, Consolidated Communications, Covad, Cox, Eschelon, Granite,

More information

July 2005 Items by Release Report

July 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

June 2005 Items by Release Report

June 2005 Items by Release Report C02-1641 Title: Accept EBD for NP 2 2/8/05 71159.2 Description: This initiative implemented a process whereby the CLEC could designate an Effective Bill Date (EBD) for certain port out requests in NY and

More information

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines:

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines: Hot Cut This is a guideline that describes hot cuts that are either through an interconnection agreement or through a state tariff. The term "Hot Cut" is used in the local exchange industry to describe

More information

Frontier Communications CLEC User Forum (CUF) May 19, 2016

Frontier Communications CLEC User Forum (CUF) May 19, 2016 Frontier Communications CLEC User Forum (CUF) May 19, 2016 1 Overview The purpose of the CLEC User Forum (CUF) is to provide a forum that allows for business-to-business discussion focused on improving

More information

November 2005 Items by Release Report

November 2005 Items by Release Report Oct 30, 2005 C04-0053 Title: RETAS pending status information transaction 5 6/14/05 386561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group Logistics Time: 11:15 AM 12:00 PM CST Place: 700 Hidden Ridge, Irving, Texas Room: W02R01 Bridge: 800-324-5531 Pass Code: 548845# Logistics and Agenda Agenda I) Review October

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 14 11 Draft Business Rules (73 days) 12/05/2003 04/02/ 07/30/ Draft Technical Specifications (66 days) 12/12/2003

More information

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely,

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely, RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS PUBLIC SERVICE COMMISSION GREG R. WHITE JOHN D. QUACKENBUSH SALLY A. TALBERG COMMISSIONER CHAIRMAN COMMISSIONER MIKE

More information

Is your standard BASED on the IACA standard, or is it a complete departure from the. If you did consider. using the IACA

Is your standard BASED on the IACA standard, or is it a complete departure from the. If you did consider. using the IACA Topic: XML Standards Question By: Sherri De Marco Jurisdiction: Michigan Date: 2 February 2012 Jurisdiction Question 1 Question 2 Has y If so, did jurisdiction you adopt adopted any the XML standard standard

More information

Alaska ATU 1 $13.85 $4.27 $ $ Tandem Switching $ Termination

Alaska ATU 1 $13.85 $4.27 $ $ Tandem Switching $ Termination Page 1 Table 1 UNBUNDLED NETWORK ELEMENT RATE COMPARISON MATRIX All Rates for RBOC in each State Unless Otherwise Noted Updated July 1, 2001 Loop Port Tandem Switching Density Rate Rate Switching and Transport

More information

Alaska ATU 1 $13.85 $4.27 $ $ Tandem Switching $ Termination

Alaska ATU 1 $13.85 $4.27 $ $ Tandem Switching $ Termination Page 1 Table 1 UNBUNDLED NETWORK ELEMENT RATE COMPARISON MATRIX All Rates for RBOC in each State Unless Otherwise Noted Updated April, 2001 Loop Port Tandem Switching Density Rate Rate Switching and Transport

More information

Managing Transportation Research with Databases and Spreadsheets: Survey of State Approaches and Capabilities

Managing Transportation Research with Databases and Spreadsheets: Survey of State Approaches and Capabilities Managing Transportation Research with Databases and Spreadsheets: Survey of State Approaches and Capabilities Pat Casey AASHTO Research Advisory Committee meeting Baton Rouge, Louisiana July 18, 2013 Survey

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

User Experience Task Force

User Experience Task Force Section 7.3 Cost Estimating Methodology Directive By March 1, 2014, a complete recommendation must be submitted to the Governor, Chief Financial Officer, President of the Senate, and the Speaker of the

More information

Wholesale Platform Services Overview

Wholesale Platform Services Overview Overview In this document: Overview 2 Service Types 2 Before Completing Your Order 3 Other Information to Consider 4 Change Log 8 Frontier Communications Rochester, NY Jurisdiction: FTR13 Effective Date:

More information

March 2003 OSS Interface Change Management Meeting

March 2003 OSS Interface Change Management Meeting 51 Wholesale Customer 2/08/00 - Bell Atlantic told the CLECs the Help Desk Hours of Operation. Care Center/ formerly - BA to have the handbook updated with the correct hours of the Help Desk. These hours

More information

PWG Change Request History Type 5

PWG Change Request History Type 5 1 2711 C02-3217 378615 E Title: Allow coordinated conversion for air Changes during Loop provisioning. Description: Currently when a hot cut is scheduled and a NDT condition on one or more lines cannot

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-1790 #390501 Rating = NR MCI = Birch = HTC = SBC = Choice One = Trinsic = Eschelon = Allegiance/XO = Time W = Sprint = Grande = Comcast = Electric

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

History of System Impacting Change Requests. Type 5

History of System Impacting Change Requests. Type 5 Rank 1 CR#/ 2601 C02-2712 376792 5 History of System Impacting Change Requests 5 Title: Standalone Digital UNE Loop Outside Moves through a Single Order Process Description: CLECs cannot process change

More information

Prioritization Working Group

Prioritization Working Group Prioritization Working Group September 14, 2005 Logistics Time: 1:00 PM 2:00 PM Place: 1095 Avenue of the Americas, New York Room: Floor 15. Room 15-01 Bridge: (800-566-2250) Chair: Jean Derrig Agenda

More information

US STATE CONNECTIVITY

US STATE CONNECTIVITY US STATE CONNECTIVITY P3 REPORT FOR CELLULAR NETWORK COVERAGE IN INDIVIDUAL US STATES DIFFERENT GRADES OF COVERAGE When your mobile phone indicates it has an active signal, it is connected with the most

More information

Wireless Network Data Speeds Improve but Not Incidence of Data Problems, J.D. Power Finds

Wireless Network Data Speeds Improve but Not Incidence of Data Problems, J.D. Power Finds Wireless Network Data Speeds Improve but Not Incidence of Data Problems, J.D. Power Finds Ranks Highest in Wireless Network Quality Performance in All Six Regions; U.S. Cellular Ties for Highest Rank in

More information

2011 Aetna Producer Certification Help Guide. Updated July 28, 2011

2011 Aetna Producer Certification Help Guide. Updated July 28, 2011 2011 Aetna Producer Certification Help Guide Updated July 28, 2011 Table of Contents 1 Introduction...3 1.1 Welcome...3 1.2 Purpose...3 1.3 Preparation...3 1.4 Overview...4 2 Site Overview...5 2.1 Site

More information

Question by: Scott Primeau. Date: 20 December User Accounts 2010 Dec 20. Is an account unique to a business record or to a filer?

Question by: Scott Primeau. Date: 20 December User Accounts 2010 Dec 20. Is an account unique to a business record or to a filer? Topic: User Accounts Question by: Scott Primeau : Colorado Date: 20 December 2010 Manitoba create user to create user, etc.) Corporations Canada Alabama Alaska Arizona Arkansas California Colorado Connecticut

More information

Reporting Child Abuse Numbers by State

Reporting Child Abuse Numbers by State Youth-Inspired Solutions to End Abuse Reporting Child Abuse Numbers by State Information Courtesy of Child Welfare Information Gateway Each State designates specific agencies to receive and investigate

More information

Alaska no no all drivers primary. Arizona no no no not applicable. primary: texting by all drivers but younger than

Alaska no no all drivers primary. Arizona no no no not applicable. primary: texting by all drivers but younger than Distracted driving Concern is mounting about the effects of phone use and texting while driving. Cellphones and texting January 2016 Talking on a hand held cellphone while driving is banned in 14 states

More information

What's Next for Clean Water Act Jurisdiction

What's Next for Clean Water Act Jurisdiction Association of State Wetland Managers Hot Topics Webinar Series What's Next for Clean Water Act Jurisdiction July 11, 2017 12:00 pm 1:30 pm Eastern Webinar Presenters: Roy Gardner, Stetson University,

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 14 October 11 Draft Business Rules (73 days) 12/05/2003 04/02/ 07/30/ Draft Technical Specifications (66

More information

Chart 2: e-waste Processed by SRD Program in Unregulated States

Chart 2: e-waste Processed by SRD Program in Unregulated States e Samsung is a strong supporter of producer responsibility. Samsung is committed to stepping ahead and performing strongly in accordance with our principles. Samsung principles include protection of people,

More information

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007 5 Session 5 Agenda December 11, 2007 Rank C/L East CR# Initiative est CR# Initiative Title Initiator Rated Status 42 est 54641 Allow Service Recovery to be requested on repair trouble ticket Integra 4.6

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release Change Control (Type ) Items by Type Rating To be Rated C0-0032 #386535 Rating = NR Title: Retrofit for Corporate Rewards Description: The purpose of this initiative is to have Flow Through automate Corporate

More information

December, 2002 OSS Interface Change Management Meeting

December, 2002 OSS Interface Change Management Meeting - 3/13/01 - CLECs request this item remain open 26 Backwards compatibility - 6/15/99 - TCs asked that backwards compatibility be discussed at the next Change Control meeting. - 7/14/99 - BA to work with

More information

WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes

WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes Version.0, April 2017 Overview The Carrier Ethernet (E-Access) product leverages Windstream s MPLS and Ethernet infrastructure to provide switched

More information

Verizon West Change Control (Type 4) Items by Release

Verizon West Change Control (Type 4) Items by Release To be Rated C0-1132 #388718 Rating = NR AT&T = MCI = Birch = HTC = SBC = Choice One = Z-Tel = Eschelon = Allegiance/XO = Covad = VarTec = Cox = Title: Flow Through to Automate Disconnect Orders Without

More information

October 2005 Items by Release Report

October 2005 Items by Release Report C04-005 Title: RETAS pending status information transaction 5 86561 Description: Enhance RETAS to include more current status information. Currently RETAS only reflects trouble resolution when the ticket

More information

How Social is Your State Destination Marketing Organization (DMO)?

How Social is Your State Destination Marketing Organization (DMO)? How Social is Your State Destination Marketing Organization (DMO)? Status: This is the 15th effort with the original being published in June of 2009 - to bench- mark the web and social media presence of

More information

Qualified recipients are Chief Executive Officers, Partners, Chairmen, Presidents, Owners, VPs, and other real estate management personnel.

Qualified recipients are Chief Executive Officers, Partners, Chairmen, Presidents, Owners, VPs, and other real estate management personnel. JANUARY 1, 2018 JUNE 30, 2018 GROUP C MEDIA 44 Apple Street Established 1968 Tinton Falls, NJ 07724 Issues Per Year: 6 (732) 559-1254 (732) 758-6634 FAX Issues This Report: 3 www.businessfacilities.com

More information

Online Certification/Authentication of Documents re: Business Entities. Date: 05 April 2011

Online Certification/Authentication of Documents re: Business Entities. Date: 05 April 2011 Topic: Question by: : Online Certification/Authentication of Documents re: Business Entities Robert Lindsey Virginia Date: 05 April 2011 Manitoba Corporations Canada Alabama Alaska Arizona Arkansas California

More information

Verizon West Notification Milestones

Verizon West Notification Milestones Verizon West Notification Milestones Documentation Release Dates Documentation February 16 June 1 11 Draft Business Rules (73 days) 1/05/003 0/0/ 07/30/ Draft Technical Specifications (66 days) 1/1/003

More information

Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability

Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability Presenting a live 90-minute webinar with interactive Q&A Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability WEDNESDAY, AUGUST 1, 2012

More information

C.A.S.E. Community Partner Application

C.A.S.E. Community Partner Application C.A.S.E. Community Partner Application This application is to be completed by community organizations and agencies who wish to partner with the Civic and Service Education (C.A.S.E.) Program here at North

More information

Prioritization of Change Requests CLEC Initiated (Type 5)

Prioritization of Change Requests CLEC Initiated (Type 5) 1 C02-3149 Title: Outside Moves Overall = 4.8 Description: Use elements of the migration process to facilitate outside moves. The CLEC would first perform loop qualification to assure the service is viable

More information

Bulk Resident Agent Change Filings. Question by: Stephanie Mickelsen. Jurisdiction. Date: 20 July Question(s)

Bulk Resident Agent Change Filings. Question by: Stephanie Mickelsen. Jurisdiction. Date: 20 July Question(s) Topic: Bulk Resident Agent Change Filings Question by: Stephanie Mickelsen Jurisdiction: Kansas Date: 20 July 2010 Question(s) Jurisdiction Do you file bulk changes? How does your state file and image

More information

CONSOLIDATED MEDIA REPORT Business Publication 6 months ended December 31, 2017

CONSOLIDATED MEDIA REPORT Business Publication 6 months ended December 31, 2017 CONSOLIDATED MEDIA REPORT Business Publication 6 months ended December 31, 2017 TOTAL GROSS CONTACTS 1,952,295 2,000,000 1,800,000 1,868,402 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000

More information

π H LBS. x.05 LB. PARCEL SCALE OVERVIEW OF CONTROLS uline.com CONTROL PANEL CONTROL FUNCTIONS lb kg 0

π H LBS. x.05 LB. PARCEL SCALE OVERVIEW OF CONTROLS uline.com CONTROL PANEL CONTROL FUNCTIONS lb kg 0 Capacity: x.5 lb / 6 x.2 kg π H-2714 LBS. x.5 LB. PARCEL SCALE 1-8-295-551 uline.com lb kg OVERVIEW OF CONTROLS CONTROL PANEL Capacity: x.5 lb / 6 x.2 kg 1 2 3 4 METTLER TOLEDO CONTROL PANEL PARTS # DESCRIPTION

More information

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES

BUSINESS SERVICE GUIDE FOR INTEREXCHANGE, INTERSTATE AND INTERNATIONAL SERVICES SECTION 4 INTERSTATE SERVICE DESCRIPTIONS, RATES AND CHARGES BELLSOUTH LONG DISTANCE, INC. 2nd Revised Page 1 d/b/a AT&T Long Distance Service Effective: October 25, 2014 4.1 General Customers are billed based on their usage of the Company's services. Rates may

More information

SECTION 2 NAVIGATION SYSTEM: DESTINATION SEARCH

SECTION 2 NAVIGATION SYSTEM: DESTINATION SEARCH NAVIGATION SYSTEM: DESTINATION SEARCH SECTION 2 Destination search 62 Selecting the search area............................. 62 Destination search by Home........................... 64 Destination search

More information

5 August 22, USPS Network Optimization and First Class Mail Large Commercial Accounts Questionnaire Final August 22, 2011

5 August 22, USPS Network Optimization and First Class Mail Large Commercial Accounts Questionnaire Final August 22, 2011 1 USPS Network Optimization and First Class Mail Large Commercial Accounts Questionnaire Final August 22, 2011 Project #J NOTE: DIRECTIONS IN BOLD UPPER CASE ARE PROGRAMMER INSTRUCTIONS; THESE INSTRUCTIONS

More information

We are filing herewith, for effect November 1, 2003, tariff material consisting of: Revision of

We are filing herewith, for effect November 1, 2003, tariff material consisting of: Revision of Theresa L. O Brien Vice President Regulatory Affairs October 2, 2003 234 Washington Street Providence, RI 02903 Phone: 401 525-3060 Fax: 401 525-3064 theresa.obrien@verizon.com Ms. Luly Massaro Commission

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C COMPARABLY EFFICIENT INTERCONNECTION PLAN

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C COMPARABLY EFFICIENT INTERCONNECTION PLAN Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Offer of Comparably Efficient ) Interconnection to Providers of ) Enhanced Directory Assistance Service ) COMPARABLY

More information

How Employers Use E-Response Date: April 26th, 2016 Version: 6.51

How Employers Use E-Response Date: April 26th, 2016 Version: 6.51 NOTICE: SIDES E-Response is managed by the state from whom the request is received. If you want to sign up for SIDES E-Response, are having issues logging in to E-Response, or have questions about how

More information

57,611 59,603. Print Pass-Along Recipients Website

57,611 59,603. Print Pass-Along Recipients Website TOTAL GROSS CONTACTS: 1,268,334* 1,300,000 1,200,000 1,151,120 1,100,000 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 57,611 59,603 Pass-Along Recipients Website

More information

How to Port Numbers with Twilio

How to Port Numbers with Twilio How to Port Numbers with Twilio Table of Contents Overview Why Port Numbers to Twilio Best Practices for Porting with Twilio Instructions on How to Port with Twilio Porting Types Port Request Rejections

More information

Prioritization of Change Requests CLEC Initiated (Type 5)

Prioritization of Change Requests CLEC Initiated (Type 5) 1 C03-1259 Title: T5 RESID Information on Provider Notification Overall = 5.0 STATUS: PENDING #384078 Description: RESID to be auto populated for all products when a Provider Notification is sent. Candidate

More information

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT

AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT AFFIDAVIT OF SAM TENERELLI TABLE OF CONTENTS LOCAL OPERATIONS CENTER AFFIDAVIT SUBJECT PARAGRAPH(S) PROFESSIONAL EXPERIENCE AND EDUCATIONAL BACKGROUND 2-4 PURPOSE OF AFFIDAVIT 5,6 SERVICE CENTERS DESCRIPTIONS

More information

MapMarker Standard 10.0 Release Notes

MapMarker Standard 10.0 Release Notes MapMarker Standard 10.0 Release Notes Table of Contents Introduction............................................................... 1 System Requirements......................................................

More information

Ted C. Jones, PhD Chief Economist

Ted C. Jones, PhD Chief Economist Ted C. Jones, PhD Chief Economist Hurricanes U.S. Jobs Jobs (Millions) Seasonally Adjusted 150 145 140 135 130 1.41% Prior 12 Months 2.05 Million Net New Jobs in Past 12-Months 125 '07 '08 '09 '10 '11

More information

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5)

Cancelled/Closed/Reclassified Change Requests CLEC Initiated (Type 5) N/A 01-0002 Title: Add central office CLLI codes to WISE loop qualification. Overall = 4.1 Description: SBC wants the Host/Remote SWC CLLI code for the end user s address to be returned, which increases

More information

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES This document contains proprietary data and is the industrial property of Exiant Communications LLC. The reproduction or disclosure

More information

Established Lafayette St., P.O. Box 998 Issues Per Year: 12 Yarmouth, ME 04096

Established Lafayette St., P.O. Box 998 Issues Per Year: 12 Yarmouth, ME 04096 JANUARY 1, 2016 JUNE 30, 2016 SECURITY SYSTEMS NEWS UNITED PUBLICATIONS, INC. Established 1998 106 Lafayette St., P.O. Box 998 Issues Per Year: 12 Yarmouth, ME 04096 Issues This Report: 6 (207) 846-0600

More information

CONSOLIDATED MEDIA REPORT B2B Media 6 months ended June 30, 2018

CONSOLIDATED MEDIA REPORT B2B Media 6 months ended June 30, 2018 CONSOLIDATED MEDIA REPORT B2B Media 6 months ended June 30, 2018 TOTAL GROSS CONTACTS 313,819 180,000 167,321 160,000 140,000 120,000 100,000 80,000 73,593 72,905 60,000 40,000 20,000 0 clinician s brief

More information

4/25/2013. Bevan Erickson VP, Marketing

4/25/2013. Bevan Erickson VP, Marketing 2013 Bevan Erickson VP, Marketing The Challenge of Niche Markets 1 Demographics KNOW YOUR AUDIENCE 120,000 100,000 80,000 60,000 40,000 20,000 AAPC Membership 120,000+ Members - 2 Region Members Northeast

More information

Terry McAuliffe-VA. Scott Walker-WI

Terry McAuliffe-VA. Scott Walker-WI Terry McAuliffe-VA Scott Walker-WI Cost Before Performance Contracting Model Energy Services Companies Savings Positive Cash Flow $ ESCO Project Payment Cost After 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

More information

Implemented Change Requests CLEC Initiated (Type 5)

Implemented Change Requests CLEC Initiated (Type 5) N/A 01-0010A Title: CSI Complex Listings/DSL/Contractual Info/Hunt Group Overall = 4.7 (Includes the intent of CR#19, 20 and 21) 01-0070 #371537 CID# 371537 Description: Return to providing DL, Caption

More information

OSS Interface Change Management Meeting September 14, 2004

OSS Interface Change Management Meeting September 14, 2004 OSS Interface Change Management Meeting September 14, 2004 10:00 AM 12:00 PM & 1:00 PM 2:00 PM 1095 Avenue of the Americas, New York, NY Floor 34, Room 34-17 Dial-In: (800) 347-6311 Agenda I. Welcome and

More information

Crop Progress. Corn Emerged - Selected States [These 18 States planted 92% of the 2016 corn acreage]

Crop Progress. Corn Emerged - Selected States [These 18 States planted 92% of the 2016 corn acreage] Crop Progress ISSN: 00 Released June, 0, by the National Agricultural Statistics Service (NASS), Agricultural Statistics Board, United s Department of Agriculture (USDA). Corn Emerged Selected s [These

More information

Release Notes SMS Notifications. Last Updated May 22, 2018

Release Notes SMS Notifications. Last Updated May 22, 2018 Release Notes SMS Notifications Last Updated May 22, 2018 What s New To automate and simplify the process of communicating Job progress to the appropriate contacts, FieldAware is adding the capability

More information

AT&T OPERATING COMPANIES TARIFF F.C.C. NO. 1 3rd Revised Title Page 1 ADVANCED SERVICES

AT&T OPERATING COMPANIES TARIFF F.C.C. NO. 1 3rd Revised Title Page 1 ADVANCED SERVICES AT&T OPERATING COMPANIES TARIFF F.C.C. NO. 1 3rd Revised Title Page 1 This tariff is limited to Advanced Services and does not contain any of the Issuing Carriers Access Services. Advanced Services are

More information

FairPoint Change Management Process

FairPoint Change Management Process FairPoint Change Management Process John Berard, Director Wholesale Services Portland, Maine September 16, 2010 Agenda Opening Remarks WebEx and Conference Call Etiquette Mute Phones when not speaking

More information

BRAND REPORT FOR THE 6 MONTH PERIOD ENDED JUNE 2014

BRAND REPORT FOR THE 6 MONTH PERIOD ENDED JUNE 2014 BRAND REPORT FOR THE 6 MONTH PERIOD ENDED JUNE 2014 No attempt has been made to rank the information contained in this report in order of importance, since BPA Worldwide believes this is a judgment which

More information

APCO Public Safety Broadband Summit Next Generation Policy-Makers Panel May 4, 2105

APCO Public Safety Broadband Summit Next Generation Policy-Makers Panel May 4, 2105 APCO Public Safety Broadband Summit Next Generation 9-1-1 Policy-Makers Panel May 4, 2105 An Introduction to NASNA The National Association of State 911 Administrators (NASNA) represents state 911 programs

More information

MapMarker Plus v Release Notes

MapMarker Plus v Release Notes Release Notes Table of Contents Introduction............................................................... 2 MapMarker Developer Installations........................................... 2 Running the

More information

Embedded Systems Conference Silicon Valley

Embedded Systems Conference Silicon Valley Embedded Systems Conference Silicon Valley EVENT AUDIT DATES OF EVENT: Conference: April 3 7, 2006 Exhibits: April 4 6, 2006 LOCATION: McEnery Convention Center, San Jose EVENT PRODUCER/MANAGER: Company

More information

PART 19 - Unbundled Network Elements and Number Portability SECTION 6 - Number Portability Original Sheet No. 1

PART 19 - Unbundled Network Elements and Number Portability SECTION 6 - Number Portability Original Sheet No. 1 PART 19 - Unbundled Network Elements and Number SECTION 6 - Number Original Sheet No. 1 1. SERVICE PROVIDER NUMBER PORTABILITY (cont d) A. DESCRIPTION Service Provider Number - Location Routing Number

More information

Hackney Learning Trust HR: DBS Online - Guide for Administrators and Verifiers

Hackney Learning Trust HR: DBS Online - Guide for Administrators and Verifiers DBS Online - Guide for Administrators and Verifiers File: Version: 11.0 1 of 48 About this guide Purpose This guide explains how those involved in the DBS process (Administrators and ID Verifiers) use

More information

Instructions for Enrollment

Instructions for Enrollment Instructions for Enrollment No Medicaid There are 3 documents contained in this Enrollment Packet which need to be completed to enroll with the. Please submit completed documents in a PDF to Lab Account

More information

10. Unbundled Dark Fiber 10.1 General

10. Unbundled Dark Fiber 10.1 General Verizon New England Inc. Page 1 Second Revision Canceling First Revision 10.1 General 10.1.1 Description A. For purposes of this Part B, Section 10, the terms business line, fiber-based collocator, and

More information

Oklahoma Economic Outlook 2015

Oklahoma Economic Outlook 2015 Oklahoma Economic Outlook 2015 by Dan Rickman Regents Professor of Economics and Oklahoma Gas and Electric Services Chair in Regional Economic Analysis http://economy.okstate.edu/ October 2013-2014 Nonfarm

More information

Telephone Appends. White Paper. September Prepared by

Telephone Appends. White Paper. September Prepared by September 2016 Telephone Appends White Paper Prepared by Rachel Harter Joe McMichael Derick Brown Ashley Amaya RTI International 3040 E. Cornwallis Road Research Triangle Park, NC 27709 Trent Buskirk David

More information

MapMarker Plus 10.2 Release Notes

MapMarker Plus 10.2 Release Notes MapMarker Plus 10.2 Table of Contents Introduction............................................................... 1 System Requirements...................................................... 1 System Recommendations..................................................

More information

U.S. Residential High Speed Internet

U.S. Residential High Speed Internet U.S. Residential High Speed Internet High-Speed Internet High-Speed Fiber and DSL broadband options from two top providers: FIBER DSL *Availability and speeds vary by customer location. Why Sell High-Speed

More information

Levels of Measurement. Data classing principles and methods. Nominal. Ordinal. Interval. Ratio. Nominal: Categorical measure [e.g.

Levels of Measurement. Data classing principles and methods. Nominal. Ordinal. Interval. Ratio. Nominal: Categorical measure [e.g. Introduction to the Mapping Sciences Map Composition & Design IV: Measurement & Class Intervaling Principles & Methods Overview: Levels of measurement Data classing principles and methods 1 2 Levels of

More information

Oklahoma Economic Outlook 2016

Oklahoma Economic Outlook 2016 Oklahoma Economic Outlook 216 by Dan Rickman Regents Professor of Economics and Oklahoma Gas and Electric Services Chair in Regional Economic Analysis http://economy.okstate.edu/ U.S. Real Gross Domestic

More information

Crop Progress. Corn Dough Selected States [These 18 States planted 92% of the 2017 corn acreage] Corn Dented Selected States ISSN:

Crop Progress. Corn Dough Selected States [These 18 States planted 92% of the 2017 corn acreage] Corn Dented Selected States ISSN: Crop Progress ISSN: 00 Released August, 0, by the National Agricultural Statistics Service (NASS), Agricultural Statistics Board, United s Department of Agriculture (USDA). Corn Dough Selected s [These

More information

Publisher's Sworn Statement

Publisher's Sworn Statement Publisher's Sworn Statement CLOSETS & Organized Storage is published four times per year and is dedicated to providing the most current trends in design, materials and technology to the professional closets,

More information

MapMarker Plus 12.0 Release Notes

MapMarker Plus 12.0 Release Notes MapMarker Plus 12.0 Release Notes Table of Contents Introduction, p. 2 Running the Tomcat Server as a Windows Service, p. 2 Desktop and Adapter Startup Errors, p. 2 Address Dictionary Update, p. 3 Address

More information