1 Kansas TIP #: U Juris: DESOTO #: STP-U016(301) County: JOHNSON KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS - Thursday, September 07, STP-KS $1, LOCAL $ LOCAL $ LOCAL $30.00 LOCAL $ TH STREET OVER CEDAR CREEK : Bridge Replacement (No Added Capacity) Bridge replacement on 95th Street over Cedar Creek.1 $1, $ $1, TIP #: KA Juris: EDGERTON #: $30, County: JOHNSON STATE-KS $30, $30, WAVERLY ROAD; US-56 SOUTH TO 199TH STREET : Reconstruction (Added Capacity) 3 This road improvement project in Johnson County includes the reconstruction of Waverly Road from just South of Highway 56 to a new connection with 199th Street. The project includes reconstruction of approximately three miles of concrete roadway and a grade separation at the BNSF Railway Intermodal tracks leaving the Logistics Park Kansas City. TIP #: Juris: EDGERTON #: 207TH GRADE SEPARATION County: JOHNSON :.2 The 207th Street Grade Separation project would construct a new bridge at the LOCAL $14, LOCAL $2, STPM-KS $ $ $16, $17, Thursday, September 07, 12:30 PM Page 1 of 196 Kansas City Metropolitan Region TIP -

2 Kansas TIP #: N Juris: GARDNER #: STP-N065(701) County: JOHNSON LOCAL $2, STPM-KS $1, LOCAL $ LOCAL $ I-35 AND GARDNER RD INTERCHANGE : Reconstruction (Added Capacity).2 of a 5-legged roundabout on each side of the interchange. This will relieve congestion and improve access to adjacent businesses. The roundabouts will be designed to accommodate trucks and buses and will include sidewalks and a trail. The project will be designed to accommodate the future replacement and widening of the existing bridge over I-35. $1, $2, $4, TIP #: N Juris: GARDNER #: TA-N065(801) $ $98.00 County: JOHNSON TA-KS $ LOCAL $98.00 $ MOONLIGHT ROAD SAFE ROUTES TO SCHOOLS : Pedestrian and/or Bikeways The project will incorporate 10 ft trails and 5 ft sidewalks with maximum separation from roadways along Moonlight Road from Warren to Moonlight Elementary, White to Moonlight Elementary, and along Woodson LN from Woodson Ct to Moonlight Road TIP #: TE Juris: JOHNSON COUNTY #: County: JOHNSON LOCAL $1, CMAQ-KS $ TA-KS $ TE-KS $ COFFEE CREEK STREAMWAY TRAIL : Pedestrian and/or Bike Ways 3.45 of a 10 wide asphalt shared use trail pedestrian and bicycle facility. The project follows Coffee Creek from Switzer Road to approximately one quarter mile West of Pflumm Road in Heritage Park. The trail length is approximately 3.45 miles. $ $1, $2, TIP #: C Juris: JOHNSON COUNTY #: STP-C487(401) County: JOHNSON STP-KS $ LOCAL $ LOCAL $ LOCAL $80.00 LOCAL $ TH STREET OVER CAPTAIN CREEK BRIDGE REPLACEMENT : Bridge Replacement (No Added Capacity).1 Replace existing bridge on 127th Street over Captain Creek with a new structure $ $ $1, Thursday, September 07, 12:30 PM Page 2 of 196 Kansas City Metropolitan Region TIP -

3 Kansas TIP #: KA Conversion Juris: KC SCOUT #: CMQ-A400(301) County: JOHNSON CMAQ-KS $ STATE-KS $ STATE-KS $ STATE-KS (AC) $ CMAQ-KS $ CREDIT ($120.00) I-35 RAMP METERING MULTIPLE LOCATIONS : Traffic Flow 10.1 The project includes installing traffic responsive ramp meters along I-35. Ramp meters will maximize traffic flow along I-35 improving the existing capacity of the interstate without adding lanes. Ramp meters have been proven to reduce the environmental impact of traffic congestion, increase safety on the interstate and on adjacent arterial streets, and decrease overall travel delay to motorists. $ $ $1, TIP #: KA /05/09 Conversion Conversion Juris: KDOT #: ACIM-4353(362)/ County: JOHNSON STATE-KS $33, NHPP-KS $10, STATE-KS (AC) $10, STATE-KS $1, NHPP-KS $ STATE-KS (AC) $ CMAQ-KS $ HFL-KS $ STATE-KS $ STATE-KS $38.50 CREDIT ($900.00) CREDIT ($10,386.20) JOHNSON COUNTY GATEWAY INTERCHANGE PROJECT AREA: I-435 FROM 87TH STREET E TO PFLUMM ROAD, I-35 & K-10 : Reconstruction (Added Capacity) 6 The consultant will develop the plans for the entire Gateway concept to a point that identifies constructible improvements and Right of Way requirements. This complete Gateway project will reconstruct portions of mainline I-435 and K-10; interchanges at the I-435/I-35, I-435/K-10, I-435/Lackman Rd., I- 435/95th St., K-10/Renner Rd. & K-10/Ridgeview Rd.; parts of interchanges at K-10/Woodland, I-435/87th St. and I-35/ 95th St. and construct CD and service roads. This project will incorporate the design of a diverging diamond interchange at the existing K-10 and Ridgeview to replace the existing stop controlled condition. This DDI will be compatible with the ultimate Johnson County Gateway Concept.The PE work phase will utilize AC in the amount of $10,386 K with conversion to NHPP in The UTIL phase will utilize AC in the amount of $900 K with conversion to NHPP in $12, $34, $46, Thursday, September 07, 12:30 PM Page 3 of 196 Kansas City Metropolitan Region TIP -

4 Kansas TIP #: KA Juris: KDOT #: County: JOHNSON NHPP-KS $21, STATE-KS $5, STATE-KS $2, STATE-KS $1, NHPP-KS $1, STATE-KS $ : I-35 SW JOHNSON COUNTY INTERCHANGE PROJECT 1.48 Construct new interchange which will be the selected alternative from the Location Study (Project No. KA ). Includes grading, concrete pavement, bridges, fencing, seeding, lighting, signals, pavement marking and implementation of a work zone ITS system. This project will include grading and surfacing for Homestead Lane improvements north to 199th St. COMPLETE $22, $9, $31, TIP #: KA Conversion Juris: KDOT #: County: JOHNSON STATE-KS (AC) $11, NHPP-KS $11, STATE-KS (AC) $1, STATE-KS $ STATE-KS $ STATE-KS $80.64 STATE-KS $0.48 CREDIT ($11,835.92) I-435 FROM I-435/I-35/K-10 WEST TO I-435/K-10 : Reconstruction (No Added Capacity) 1.4 Interim Improvements on I-435 east to Quivira Road and on I-35 from I-435 south the 119th Street. Project includes development of interim plans. There will be a traffic analysis to determine current and future levels of service and the expected operational life of the interim improvements. This project, as part of the overall Gateway project. Improvements to this facility will alleviate a significant freight bottleneck in the region. This facility also is utilized by Johnson County Transit's K-10 Connector bus service between stops in Johnson and Douglas counties. COMPLETE $11, $2, $13, TIP #: KA Juris: KDOT #: NHPP-4353(361) County: JOHNSON NHPP-KS $10, NHPP-KS $1, NHPP-KS $ STATE-KS $8.10 STATE-KS $8.00 BRIDGES #054, #055, #273 AND #274 IN JOHNSON COUNTY ON I-435 (RECONSTRUCTION OF ROE BLVD. INTERCHANGE) : Bridge Replacement (No Added Capacity) 0 Replace bridges #054 and #055 with new bridges #415 and #418. Remove bridges #273 (pedestrian) and #274 (median) The interchange configuration will be changed from the existing compressed diamond interchange to a diverging-diamond interchange (DDI). Pedestrians will be accomodated in the new bridges and DDI improvements. $12, $16.10 $12, Thursday, September 07, 12:30 PM Page 4 of 196 Kansas City Metropolitan Region TIP -

5 Kansas TIP #: K Juris: KDOT #: $96, $14, County: JOHNSON NHPP-KS $96, LOCAL $8, STATE-KS $2, STATE-KS $1, STATE-KS $1, $110, CORRIDOR: FROM 119TH ST. NORTH TO I-35 AND I-35 NO TO 75TH STREET : Reconstruction (Added Capacity) 1.6 Grading, surfacing and bridges are for improvements to US-69 for future expansion to a 6-Lane freeway. Includes constructing a two-mile segment of the new SB US-69 collector-distributor road system from 103rd St. to 119th St., constructing one-mile segments of the WB and EB I-435 collectordistributor road system from US-69 to Quivira Road, interchange reconstruction at I-435/Quivira Road, adds auxiliary lanes to EB & WB I-435 between Quivira Road and I-35, Noise Walls, Sign, LT, PM and ITS. This project works on increasing the overall capacity of this corridor. There will be collector distributor roads added and pavement improvements that will increase the flow of freight travel. COMPLETE TIP #: KA Juris: KDOT #: $ INTERSECTION OF K-7 & 43RD ST IN SHAWNEE County: JOHNSON : Signalization & Computerization (Roadway) 0 Installation of new traffic signal equipment on K-7 at 43rd St STATE-KS $ $ TIP #: KA Juris: KDOT #: INTERSECTION OF K-7 & 75TH STREET IN SHAWNEE County: JOHNSON : 0 Replace safe-hit posts with permanent median dividers on K-7 at 75th St STATE-KS $ LOCAL $26.40 $ $ Thursday, September 07, 12:30 PM Page 5 of 196 Kansas City Metropolitan Region TIP -

6 Kansas TIP #: KA Conversion Conversion Conversion Conversion Conversion Conversion Conversion Juris: KDOT #: JOHNSON COUNTY GATEWAY: I-435 FROM 87TH STREET E TO PFLUMM ROAD, I-35 & K-10 County: JOHNSON STATE-KS (AC) $255, NHPP-KS $78, NHPP-KS $64, NHPP-KS $55, NHPP-KS $55, STATE-KS $20, STATE-KS (AC) $13, LOCAL $7, STP-KS $7, STPM-KS $5, STPM-KS $2, STATE-KS $ LOCAL $ CREDIT ($2,777.00) CREDIT ($5,600.00) CREDIT ($7,280.00) CREDIT ($55,020.00) CREDIT ($55,080.00) CREDIT ($64,111.00) CREDIT ($78,250.00) : Reconstruction (Added Capacity) 0 DESIGN BUILD PROJECT - The Gateway project will reconstruct portions of mainline I-435 and K-10; interchanges at the I-435/I-35, I-435/K-10, I- 435/Lackman Rd., I-435/95th St., K-10/Renner Rd. & K-10/Ridgeview Rd.; parts of interchanges at K-10/Woodland, I-435/87th St. and I-35/ 95th St. and construct CD and service roads. The project will also include College Blvd. - Renner Rd. to Ridgeview (College Boulevard widen from 2-lanes to 4-lane divided with turn lanes at intersections) and 95th Street & I-35 Interchange Reconstruction (Reconstruct interchange at 95th Street and I-35 including improvements to Marshall Drive and to Lenexa Dr.) For additional information, please visit the project website at: ######### $30, $298, TIP #: KA Juris: KDOT #: NHPP-0353(414) SW JOHNSON COUNTY INTERCHANGE PROJECT AT I-35 AND HOMESTEAD LANE County: JOHNSON : 1.48 Ground/soil preparation and permanent seeding STATE-KS $ NHPP-KS $90.10 $90.10 $ $ Thursday, September 07, 12:30 PM Page 6 of 196 Kansas City Metropolitan Region TIP -

7 Kansas TIP #: KA Conversion Juris: KDOT #: NHPP-4353(366) I-435 FROM 87TH ST. EAST TO PFLUMM ROAD, I-35 AND K-10 County: JOHNSON NHPP-KS $19, STATE-KS (AC) $19, STATE-KS $2, CREDIT ($19,355.10) : Project Manager Consultant for the Design-Build Project, Project No. KA The Project Manager will assist in the development of contract documents for the Design-Build project, KA The Project Manager Consultant will assist the Design-Build Contractor during Project KA development and construction. $19, $2, $21, TIP #: KA Conversion Juris: KDOT #: ACNHS-0353(41 County: JOHNSON NHPP-KS $ STATE-KS (AC) $ STATE-KS $56.00 CREDIT ($504.00) BRIDGE #001 ON I-35 IN JOHNSON COUNTY LOCATED 1.03 MILES NORTHEAST OF THE JOHNSON/MIAMI COUNTY LINE (SUNFLOWER RD OVER I-35) : Bridge Replacement (No Added Capacity) 0 Bridge replacement. This projecct is authorized for PE only. The total project cost, including all work phases, is estimated at $6,682K. This estimate should be used for planning purposes only. $ $56.00 $ TIP #: KA Conversion Conversion Conversion Juris: KDOT #: ACNHP-A308(40 US-69: BRIDGE #099, 5.12 MILES NORTH OF THE JOHNSON/MIAMI COUNTY LINE (BLUE RIVER) County: JOHNSON : Bridge Replacement (No Added Capacity) 0 Bridge replacement. STATE-KS (AC) $2, NHPP-KS $2, STATE-KS $ NHPP-KS $ STATE-KS (AC) $ STATE-KS $46.00 STATE-KS $40.00 NHPP-KS $32.00 STATE-KS (AC) $32.00 STATE-KS $8.00 CREDIT ($32.00) CREDIT ($324.00) CREDIT ($2,694.50) $3, $ $3, Thursday, September 07, 12:30 PM Page 7 of 196 Kansas City Metropolitan Region TIP -

8 Kansas TIP #: K Juris: KDOT #: $4, County: JOHNSON STATE-KS $3, LOCAL $1, STATE-KS $50.00 $4, CORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH ST : Reconstruction (Added Capacity) 0 Preliminary for grading, surfacing and bridges are for improvements to US-69 for expansion to a 6-Lane freeway. This project includes constructing US-69 to a 6-Lane section, constructing a portion of the US-69/I435 interchange, Signing, Pavement Marking, Lighting and ITS. Project is authorized for PE and ROW only. The total project cost, including all work phases, is estimated at $76522K. This estimate should be used for planning purposes only. TIP #: KA Juris: KDOT #: NHPP-0353(418) $16, $ County: JOHNSON NHPP-KS $16, STATE-KS $ STATE-KS $20.30 $17, I-35: JUST NORTH OF I-35/K-7, NORTH TO I-35/SANTA FE : Reconstruction (No Added Capacity) 2 Concrete pavement replacement on I-35 only. This project will include the repair of bridges # 315 thru #319. This project is located along a major interstate freight corridor. There are no pedestrian accommodations along this interstate section. Bus on shoulder operates within this section of the interstate. TIP #: KA Juris: KDOT #: $0.00 US 56 AND 199TH ST EDGERTON, KS County: JOHNSON : Traffic Flow Construct Turn Lanes STATE-KS $0.00 $ TIP #: KA Juris: KDOT #: $ County: JOHNSON STATE-KS $ $ EDGERTON: WAVERLY RD: W 199TH ST NORTH TO US-56 : Reconstruction (No Added Capacity) 2 Reconstruction. KDOT is partnering with the City of Edgerton for the Preliminary Design of the project. KDOT will use our On- Call List to select the consultant and the project will be Design Build. Total project cost estimate is expected to be appproximately $15 M. Thursday, September 07, 12:30 PM Page 8 of 196 Kansas City Metropolitan Region TIP -

9 Kansas TIP #: KA Conversion Juris: KDOT #: NHPP-4353(368) I-435: FROM 0.5 MILES EAST OF THE I-435/QUIVIRA RD. JUNCTION, EAST TO THE I-435 BRIDGES OVER METCALF AVE. County: JOHNSON STATE-KS (AC) $20, FRP-KS $20, STATE-KS $2, STATE-KS $ CREDIT ($20,221.00) : Reconstruction (No Added Capacity) 2 Pavement replacement and reconstruction of the inside 6 lanes of pavement (3 inside lanes eastbound and 3 inside lanes westbound). The inside shoulder (eastbound & westbound) will be partially removed as needed.this project is located along a major interstate freight corridor. There are no pedestrian accommodations along this corridor. The CONST/CE phase will utilize AC in the amount of $20,221K with conversion to FRP-KS in. $20, $2, $23, TIP #: KA Juris: KDOT #: US-56 AND 199TH ST; EDGERTON, KS County: JOHNSON : Traffic Flow Construct Turn lanes STATE-KS $ STATE-KS $ STATE-KS $ STATE-KS $ $1, $1, TIP #: KA Conversion Juris: KDOT #: County: JOHNSON NHPP-KS $ STATE-KS (AC) $ STATE-KS $94.10 CREDIT ($846.90) I-35: BRIDGE #007 (199TH ST. OVER I-35) LOCATED 4.2 MILES NORTHEAST OF THE JOHNSON/MIAMI COUNTY LINE : Bridge Replacement (No Added Capacity) 0 Bridge replacement-project is authorized for PE only. The total project cost, including all work phases, is estimated at $10,075 K. This estimate should be used for planning purposes only. $ $94.10 $ Thursday, September 07, 12:30 PM Page 9 of 196 Kansas City Metropolitan Region TIP -

10 Kansas TIP #: KA Juris: KDOT #: $ County: JOHNSON STATE-KS $ $ I-35 IMPROVEMENT STUDY IN JOHNSON COUNTY; I-35: FROM 0.4 MILES SOUTH OF I-35/75TH ST., NORTH TO 0.2 MILES SOUTH OF I-35/67TH ST. : Reconstruction (Added Capacity) 1 PE ONLY - The Study will evaluate potential safety and efficiency improvements on this section of I-35. This will include the possibility of adding one lane (3-lane to 4-lane) northbound and/or southbound, review the requirements for ramp metering, maintain the bus on shoulder concept and review mainline pavement condition and impacts on the ramps. Survey will be included for this project. Study expected to be completed in Spring. TIP #: KA Juris: KDOT #: $94.10 TOLL FEASIBILITY STUDY FOR THE SOUTH LAWRENCE TRAFFICWAY (SLT) AND K-10 CORRIDORS County: JOHNSON STATE-KS $94.10 $94.10 : 38 Study for the feasibility of tolling the SLT and K-10 corridors. This study will include a determination of which toll improvement scenarios are most feasible at a sketch planning level for implementing corridor improvements. Study expected to be completed by the end of. TIP #: KA Juris: KDOT #: WESTWOOD HILLS GI: US-169 BETWEEN 48TH TERRACE AND 49TH TERRACE County: JOHNSON : 1 Storm Sewer Improvement STATE-KS $ LOCAL $27.60 STATE-KS $21.80 $ $ TIP #: KA Juris: KDOT #: County: JOHNSON : I-435: BRIDGE #208 IN JOHNSON COUNTY, LOCATED AT THE I-435/MIDLAND DRIVE INTERCHANGE (NORTHBOUND LANES)(3.06 MILES SOUTH OF THE JOHNSON/WYANDOTTE COUNTY LINE) Bridge redeck 1 PROJECT HAS BEEN COMBINED WITH # Thursday, September 07, 12:30 PM Page 10 of 196 Kansas City Metropolitan Region TIP -

11 Kansas TIP #: KA Juris: KDOT #: $ County: JOHNSON STATE-KS $ $ : I-435: BRIDGE #207 IN JOHNSON COUNTY, LOCATED AT THE I-435/MIDLAND DRIVE INTERCHANGE (SOUTHBOUND LANES)(3.05 MILES SOUTH OF THE JOHNSON/WYANDOTTE COUNTY LINE) 1 Bridge redeck. Project is authorized for PE Only. The total project cost, including all work phases, is estimated at $3,842 K. This estimate should be used for planning purposes only. Project has been moved from TWORKS to POOL and construction activities have been removed. TIP #: KA Juris: KDOT #: K-7/K-10 INTERCHANGE; HIGH FRICTION SURFACE TREATMENT IN JOHNSON COUNTY County: JOHNSON : 0 Install high friction surface treatment at selected ramp locations HSIP-KS $ STATE-KS $20.00 $ $20.00 $ TIP #: KA Juris: KDOT #: $ County: JOHNSON STATE-KS $ STATE-KS $95.00 STATE-KS $50.00 $ : JOHNSON CO: US-169 & 175TH STREET 0 Construct a right turn lane on the west leg of the intersection of US-169 & 175th. Upgrade traffic signal poles serving 175th Street to include a protected/permissive signal (4-section head) over the existing left turn lanes. Upgrade all signal heads to LED and add Battery Backup to the traffic signal system. Add interconnected signal operation - flashing beacons for 175th traffic signal and 199th traffic signal approaches. TIP #: KA Conversion Juris: KDOT #: $ $ County: JOHNSON FRP-KS $ STATE-KS (AC) $ STATE-KS $ CREDIT ($985.30) $1, I-35: FROM 0.4 MILES SOUTH OF I-35/75TH ST., NORTH TO 0.2 MILES SOUTH OF I-35/67TH ST. : Reconstruction (Added Capacity) 1 Widening of northbound and southbound lanes from 3 to 4-lane, increase northbound vertical clearance under 75th Street and modification of NB onramp and SB on & off-ramps. Project is authorized for PE ONLY. Project created after the completion of the location study under KA The PE work phase will utilize AC in the amount of $985.3 K with conversion to FRP- KS in The total project cost, including all work phases, is estimated at $21,347 K. This estimate should be used for planning purposes only. Thursday, September 07, 12:30 PM Page 11 of 196 Kansas City Metropolitan Region TIP -

12 Kansas TIP #: N Conversion Juris: LEAWOOD #: STP-N042(601) County: JOHNSON LOCAL $7, STPM-KS $1, LOCAL (AC) $ STPM-KS $ TA-KS $ CREDIT ($309.00) 143RD ST, NALL TO WINDSOR : Reconstruction (Added Capacity) 1.0 Improve existing 2-lane ditch street to 4-lanes w/ undivided curb & gutter, stormsewer, street lights, sidewalks on one side and 10-foot bike/hike trail on other, plus signalization of 143rd & Mission Rd. $1, $7, $8, TIP #: N Juris: LEAWOOD #: STP-N065(601) County: JOHNSON LOCAL $4, LOCAL $3, STPM-KS $2, LOCAL $ LOCAL $ RD ST, WINDSOR TO OVERBROOK : Reconstruction (Added Capacity) 1.0 Existing 2-lane ditch street that will be improved to a 4-lane undivided street withcurb and gutter, stormsewer, LED streetlights, sidewalk along south side, 10-feet pedestrian along the north side, on-street bike lanes, improved traffic signal at143rd and Kenneth, sodding and landscaping. 143rd street west of this locationwas improved to the same standards in. $2, $9, $11, TIP #: Juris: LENEXA #: County: JOHNSON LOCAL $18, LOCAL $2, LOCAL $1, LOCAL $ LOCAL $ RIDGEVIEW RD. - K-10 TO 95TH STREET (PRAIRIE STAR PARKWAY) : New (Added Capacity) 1.0 Ridgeview Road New 5-lane roadway from K-10 Highway to 95th Street (Prairie Star Parkway) $21, $21, Thursday, September 07, 12:30 PM Page 12 of 196 Kansas City Metropolitan Region TIP -

13 Kansas TIP #: N Juris: LENEXA #: CMQ-N059(601) $ $ County: JOHNSON CMAQ-KS $ LOCAL $ $ CITY CENTER MIXED USE BIKE/HIKE TRAIL : Pedestrian and/or Bikeways 1 This trail will provide an alternate access to Lenexa's City Center. City Center is a mixed use development that is intended to be more walkable and pedestrian and bicycle friendly. On-street parking, wide sidewalks and store fronts directly on the street are all part of the plan for City Center. This proposed trail will link to other areas in Lenexa as well as ultimately to Metro Green corridors. This trail will connect between existing trails on 87th Street and Renner Boulevard. TIP #: TE Juris: LENEXA #: TEA-T060(601) County: JOHNSON TE-KS $ LOCAL $ LOCAL $46.64 TE-KS $4.00 LOCAL $1.00 QUIVIRA ROAD SIDEWALK 83RD STREET TO 85TH STREET : Pedestrian and/or Bike Ways 0 5-foot sidewalk on Quivira Road from 83rd Street to 85th Street including intersection improvements and signal modifications to accommodate pedestrians at the adjacent signalized intersections. Project also includes the replacement of the traffic signal at the intersection of 83rd St. and Quivira Rd. $ $ $ TIP #: N Juris: LENEXA #: HSIP-N058(601) County: JOHNSON HSIP-KS $ LOCAL $ LOCAL $50.00 I-435 AND 87TH STREET SB OFF RAMP TURN LANE : Reconstruction (Added Capacity) 0 Construct an additional turn lane on the southbound off ramp at I-435 and 87th Street. Including signal replacement to accommodate the widening for the turn lane. $ $ $ TIP #: TE Juris: LENEXA #: TA-T043(001) LACKMAN TRAIL FROM SAR-KO-PAR TRAILS PARK TO 95TH STREET & I-435 County: JOHNSON TA-KS $ LOCAL $ LOCAL $ LOCAL $25.00 : Pedestrian and/or Bike Ways 2 Provides a missing link in the Lenexa trail system. Project is a mixed-use trail on Lackman Rd from 88th St to 95th St, then along 95th St to I-435 with a connection to the existing trail to the east along 95th St. Connects Sar-Ko-Par Trails Park with the 95th St trail system, ultimately connecting to the Johnson County Mill Creek Trail. $ $ $1, Thursday, September 07, 12:30 PM Page 13 of 196 Kansas City Metropolitan Region TIP -

14 Kansas TIP #: TE Juris: LENEXA #: TA-T042(901) $ $ County: JOHNSON TA-KS $ LOCAL $ $ CITY CENTER AMENITY ZONE : (Environmental, Scenic, Historic) 0.2 Project will provide amenity zone improvements for Penrose from 87th to 89th St in the Lenexa City Center. This includes wide sidewalks to promote and encourage walking, as well as planters and street trees for beautification of the area. Project will also include water quality improvements to clean stormwater runoff from the street and adjacent developments. TIP #: TE Juris: LENEXA #: TA-T042(801) County: JOHNSON TA-KS $ LOCAL $63.00 LOCAL $30.96 LOCAL $15.50 RENNER MIXED-USE TRAIL : Pedestrian and/or Bike Ways 0.4 Project is a 10 ft. wide trail along Renner Blvd from 91st to 93rd St. Will provide a key missing link in the Lenexa trail system connecting the Prairie Creek developments with the City Center. $ $ $ TIP #: N Juris: LENEXA #: CMQ-N066(501) $ $ County: JOHNSON CMAQ-KS $ LOCAL $ $ TH AND SANTA FE TRAIL DRIVE INTERSECTION IMPROVEMENTS : Signalization & Computerization (Roadway).1 95th Street and Santa Fe Trail Drive intersection improvements which will include southbound, eastbound and westbound right turn lanes, extending the storage length of the eastbound left turn lane, restricting an access drive to right-in/rightout to minimize conflicts, replace the traffic signal, ADA ramps and accessible pedestrian signals on all approaches, relocation of drive approach to minimize conflicts through the intersection, and extension of a mixed use trail along the north side of the intersection. TIP #: N Juris: MERRIAM #: STP-N063(201) County: JOHNSON STPM-KS $1, LOCAL $ STATE-KS $ SHAWNEE MISSION PARKWAY BRIDGE OVER BNSF REHABILITATION : Bridge Rehabilitation (No Added Capacity) 0.1 Scope of work includes clean/replace expansion joints; paint to prevent corrosion, and repair failed embankment slope etc. The bridge is vital to freight mobility, all types of vehicular traffic with direct connection to I-35 and the Plaza in Kansas City, MO. $1, $ $2, Thursday, September 07, 12:30 PM Page 14 of 196 Kansas City Metropolitan Region TIP -

15 Kansas TIP #: Juris: MISSION #: $20.00 $5.00 County: JOHNSON TA-KS $20.00 LOCAL $5.00 $25.00 MISSION SAFE ROUTES TO SCHOOL PHASE 1 PLAN : Pedestrian and/or Bike Ways Project is to develop a SRTS 1 Plan. The City of Mission will use the "5 Es" in this first phase of planning to gather the conditions and perceptions of the schools. They will conduct an initial count of the number of students who walk and bike to school. The City plans to include PTA and school administrators in developing improvement plans and other encouragement activities that will be most effective for our goal to increase walking and bicycling to school. NA TIP #: Juris: MISSION #: County: JOHNSON TA-KS $68.00 LOCAL $17.85 MISSION SAFE ROUTES TO SCHOOL PHASE II FACILITIES : Pedestrian and/or Bikeways 2.0 To improve safety to and from Missions schools in response to the Citys SRTS I Study, the project retrofits bike lanes and sharrows to both sides of Lamar Ave from Foxridge Dr to Shawnee Mission Pkwy $68.00 $17.85 $85.85 TIP #: N Conversion Juris: OLATHE #: ACSTP-N061(01 County: JOHNSON LOCAL $11, LOCAL (AC) $4, STPM-KS $4, LOCAL $ LOCAL $ LOCAL $ LOCAL $ LOCAL $ LOCAL $ CREDIT ($4,628.00) 159TH ST.; OLD US-56 TO I-35 STREET IMPROVEMENTS : Reconstruction (No Added Capacity) 1.8 This project improves 159th Street to a two lane roadway with curb and gutter, sidewalk, storm sewer and an above grade crossing at the BNSF railway. Its goal is to improve passenger and freight mobility and promote economic development by constructing safe and sustainable infrastructure. $4, $14, $18, Thursday, September 07, 12:30 PM Page 15 of 196 Kansas City Metropolitan Region TIP -

16 Kansas TIP #: TE Juris: OLATHE #: TEA-T037(901) County: JOHNSON TE-KS $ LOCAL $ LOCAL $1.00 OLATHE 119TH ST. & I-35 INTERSECTION AESTHETIC IMPROVEMENTS : (Environmental, Scenic, Historic).1 of a new entry monument sign with landscaping and lighting, along with extensive landscape improvements at all quadrants of the 119th Street and I-35 Interchange. $ $ $ TIP #: Juris: OLATHE #: County: JOHNSON CMAQ-KS $ CMAQ-KS $ CMAQ-KS $ LOCAL $67.00 LOCAL $66.50 LOCAL $66.50 OLATHE - EMISSIONS REDUCTION INITIATIVE : Alternative Fuel This project seeks to improve regional air quality by replacing diesel powered Solid Waste vehicles with cleaner burning and more environmentally sensitive CNG vehicles and through infrastructure support for a CNG fueling station. NA $ $ $1, TIP #: Juris: OLATHE #: $2, $1, County: JOHNSON STPM-KS $2, LOCAL $1, $3, K-7 (PARKER ST), DENNIS TO SANTA FE TURN LANE ADDITIONS : Traffic Flow 1.0 This project will include the addition of turn lanes along K-7 (Parker St.) between Dennis Ave and Santa Fe. Right and left turn lanes will be installed at 8 potential intersections along the corridor. This project will also include updates to the ADA ramps and traffic signals as needed throughout the corridor. TIP #: Juris: OLATHE #: County: JOHNSON LOCAL $ CMAQ-KS $ SANTA FE & BLACK BOB INTERSECTION IMPROVEMENTS : Traffic Flow.25 This project will add a right turn lane from westbound Santa Fe to northbound Black Bob. It will also include signal modifications and updates to sidewalks/ada ramps as necessary. $ $ $ Thursday, September 07, 12:30 PM Page 16 of 196 Kansas City Metropolitan Region TIP -

17 Kansas TIP #: Juris: OLATHE #: 119TH & BLACK BOB INTERSECTION IMPROVEMENTS County: JOHNSON : Traffic Flow.25 This project will include a northbound right turn lane on Black Bob Road. CMAQ-KS $ LOCAL $ $ $ $ TIP #: TE Juris: OLATHE #: TA-T043(101) $1, $ County: JOHNSON TA-KS $1, LOCAL $ $1, MEADOW LANE TRAIL : Pedestrian and/or Bike Ways 4.6 Project is a shared-use-path that will connect residential developments to the Kansas State University Bio-Science center, Prairie Trail Middle School, Olathe Northwest High School, Gary Haller Regional Trail system as well as to the growing business parks (Corporate Ridge and Ridgeview Marketplace) at the intersection of K-10 and Ridgeview in Olathe. TIP #: N /N-0628 Juris: OLATHE #: TA-N062(701)/TA County: JOHNSON TA-KS $ LOCAL $ TA-KS $43.20 TA-KS $16.00 LOCAL $10.80 LOCAL $4.00 TA-KS $3.20 LOCAL $0.80 OLATHE SAFE ROUTES TO SCHOOL : Pedestrian and/or Bike Ways Project has two parts: Infrastructure and education. The city will construct sidewalks on selected designated school walking routes near Northview, Ridgeview, Ravenwood and Havencroft Elementary Schools, including the installation of wheelchair ramps at appropriate locations. Olathe Public Schools will also complete a bicycle and pedestrian safety & education program. NA $ $ $ TIP #: Juris: OLATHE #: $ $84.20 County: JOHNSON STPM-KS $ LOCAL $84.20 $ CONNECT DOWNTOWN OLATHE : Pedestrian and/or Bike Ways Professional engineering and design services for 4 of the 12 bicycle and pedestrian opportunities in the South Cedar Creek Connectivity Plan. The project will include the following connections to Downtown: 1) Olathe North High School; 2) West Village and West Market Shopping Centers; 3) the Great Mall, Olathe Medical Center and existing on-street bike lanes on Dennis and Sheridan; and 4) Frisco Lakes Park, Mid-America Nazarene University and Indian Creek Trail. PROJECT SPLIT FROM # Thursday, September 07, 12:30 PM Page 17 of 196 Kansas City Metropolitan Region TIP -

18 Kansas TIP #: N Juris: OLATHE #: HSIP-N061(801) County: JOHNSON LOCAL $1, LOCAL $ HSIP-KS $ LOCAL $ LOCAL $ LOCAL $ LOCAL $ LOCAL $ ST AND SCARBOROUGH : Signalization & Computerization (Roadway).1 Construct a left turn lane for westbound 151st Street traffic turning onto Scarborough. Also included in the project will be right turn lanes on all four legs of the intersection at 151st & Mur-Len Road, the replacement of the existing traffic signal and median modifications. HSIP funding applicable only to 151st & Scarborough intersection. $ $4, $4, TIP #: N Juris: OLATHE #: STP-N066(601) County: JOHNSON LOCAL $11, LOCAL $4, STPM-KS $3, LOCAL $2, LOCAL $ LONE ELM ROAD, OLD 56 HIGHWAY TO 151ST STREET : Reconstruction (Added Capacity) 1 This project includes the widening of Lone Elm Road between Old 56 Highway and 151st Street from a 2-lane section to a 4-lane divided arterial. The project also includes modi 䊰栘 cations or reconstruction of a bridge over the railroad tracks. Bicycle lanes will be construction along Lone Elm Road as well as wide sidewalks. $3, $18, $22, TIP #: N Juris: OLATHE #: CMQ-N066(701) $1, $3, County: JOHNSON LOCAL $1, CMAQ-KS $1, LOCAL $ LOCAL $ LOCAL $ $4, : 159TH & BLACK BOB ROAD IMPROVEMENTS.1 This project will include the widening of Black Bob Road from a 2-lane section to a 4-lane divided arterial from 153rd Terrace to 159th Street. Also included in the project will be CMAQ funded intersection improvements at 159th & Black Bob including right and left turn lanes in all directions and a traffic signal. Improvements will include asphalt, curb and gutter, medians, streetlights, storm sewer improvements, and all other work necessary to achieve a complete project. This project will include bicycle lanes along 159th Street and sidewalks and a shared use path along both 159th Street and along Black Bob. Thursday, September 07, 12:30 PM Page 18 of 196 Kansas City Metropolitan Region TIP -

19 Kansas TIP #: Juris: OLATHE #: $ $76.00 County: JOHNSON CMAQ-KS $ LOCAL $76.00 $ FLEET EMISSION REDUCTION: CNG REPLACEMENT : Alternative Fuel The City of Olathe - Fleet Emissions Reduction Project: CNG Replacement project seeks to improve regional air quality by replacing 8 diesel powered Solid Waste heavy trucks, and 2 diesel powered street sweepers with cleaner burning and more environmentally sensitive CNG heavy trucks. TIP #: N Juris: OLATHE #: CMQ-N066(801) County: JOHNSON CMAQ-KS $ LOCAL $ LOCAL $80.00 LOCAL $60.00 SIDEWALK MISSING LINK PROJECT : Pedestrian and/or Bikeways This project will include the construction of missing link sidewalks on school routes. Based on need, it is anticipated the first schools to complete will be Central, Ridgeview and Fairview. While our main focus is students, the sidewalks will be beneficial to all residents including mobility aid users, bicyclists and transit riders. $ $ $ TIP #: N Juris: OLATHE #: TA-N066(901) $ $1, County: JOHNSON LOCAL $1, TA-KS $ $2, CEDAR CREEK TRAIL : Pedestrian and/or Bikeways 2.34 of 2.34 miles of a 10 ft. wide asphalt bicycle and pedestrian trail and miscellaneous related improvements that will form a crucial north-south connection between major recreation areas at Cedar Lake and Lake Olathe and tie in with commercial, school, residential, and employment sites along the existing Dennis Avenue bike lanes. TIP #: Juris: OLATHE #: $1, County: JOHNSON LOCAL $1, $1, I-35 AND 119TH STREET INTERCHANGE : Widening & Resurfacing(Added Capacity) 1 Planning for improvements to the interchange and ramps. Options for this could in clude expanding the existing 4-lane bridge over I-35 to 6-lanes or reconfiguring the interchange. The project will also include the widening of 119th Street from Renner Blvd to Black Bob Road along with multi-modal improvements to accommodate pedestrian traffic. Thursday, September 07, 12:30 PM Page 19 of 196 Kansas City Metropolitan Region TIP -

20 Kansas TIP #: N Conversion Juris: OLATHE #: STP-N063(101) County: JOHNSON LOCAL $2, LOCAL (AC) $1, STPM-KS $1, STPM-KS $1, LOCAL $1, LOCAL $ LOCAL $ LOCAL $85.00 LOCAL $50.00 CREDIT ($1,750.00) 143RD, PFLUMM TO QUIVIRA : Reconstruction (Added Capacity) 1.0 Reconstruct unimproved 2-lane to 4-lane thoroughfare w/ curbs, gutters, median, turn lanes, storm sewers, streetlights. Includes construction of a 10 ft bicycle/pedestrian trail along the north side further extending the City's greenway linkage already in place along 143rd St. $3, $4, $8, TIP #: N Juris: OVERLAND PARK #: STP-N064(801) County: JOHNSON STPM-KS $6, LOCAL $6, LOCAL $2, LOCAL $1, METCALF AVENUE, 159TH STREET TO 167TH STREET : Reconstruction (Added Capacity) 1.0 Reconstruct unimproved 2-lane roadway to 4-lane thoroughfare with curb and gutter, sidewalks, raised median, turn lanes, storm sewers and streetlighting. $6, $10, $17, TIP #: Juris: OVERLAND PARK #: $3, County: JOHNSON LOCAL $2, LOCAL $ $3, QUIVIRA ROAD, 183RD STREET TO 187TH STREET : New (Added Capacity) 1 This section of Quivira Road currently does not exist. This project would include construction of Quivira Road to a standard two lane roadway with curb and gutter, sidewalks, bike/pedestrian path, storm sewer, streetlighting and bridge over Wolf Creek. Thursday, September 07, 12:30 PM Page 20 of 196 Kansas City Metropolitan Region TIP -

21 Kansas TIP #: N Conversion Juris: OVERLAND PARK #: STP-N060(701) County: JOHNSON LOCAL $5, STPM-KS $3, LOCAL (AC) $1, STPM-KS $1, LOCAL $ CREDIT ($1,733.76) 159TH ST.; METCALF AVE. TO NALL AVE. : Reconstruction (Added Capacity) 1.0 Reconstruction of 159th Street to a four-lane divided thoroughfare with turn lanes stormsewers, ADA compliant sidewalks and bike/hike trail, street lights, and traffic signals. This project will maximize access, improve safety, and address system preservation needs. $5, $5, $11, TIP #: TE Juris: OVERLAND PARK #: TEA-T039(101) $ $ County: JOHNSON TE-KS $ LOCAL $87.10 LOCAL $21.90 $ PRAIRIE TRACE - HILTOP CAMPUS TRAIL : (Environmental, Scenic, Historic).25 East side of US 69 Highway from 135th Street to 138th Street and 140th Terrace to 143rd Street. of two segments, A-1 (500 l.f.) and B-1 (730 l.f.) 10-ft. wide asphalt bicycle/pedestrian trail to include grading, retaining walls, drainage improvements, landscaping and seeding. Segments will complete missing links between existing trails that connect to the main Tomahawk Creek trail system. TIP #: Juris: OVERLAND PARK #: County: JOHNSON LOCAL $10, LOCAL $ TH STREET, NALL AVENUE TO MISSION ROAD : Reconstruction (Added Capacity) 1 Reconstruction of 159th Street from a two-lane unimproved roadway to a fourlane divided thoroughfare with curb and gutter, turn lanes, storm sewers, ADA compliant sidewalks and bike/hike trail, street lighting, and traffic signals. $11, $11, TIP #: N Conversion Juris: OVERLAND PARK #: CMQ-N065(101) County: JOHNSON LOCAL (AC) $ CMAQ-KS $ CMAQ-KS $ LOCAL $73.50 CREDIT ($120.00) DOWNTOWN OP BIKE/PED IMPROVEMENTS : Pedestrian and/or Bike Ways Project will build upon the recommendations from a recent study funded by MARC looking at Downtown Overland Park. It will include adding a number of bike parking facilities, and adding striping and signing to better delineate pedestrian crosswalks and bike facilities. The project will also extend the signing in a three mile radius from downtown for better wayfinding. NA $ $73.50 $ Thursday, September 07, 12:30 PM Page 21 of 196 Kansas City Metropolitan Region TIP -

22 Kansas TIP #: Juris: OVERLAND PARK #: County: JOHNSON LOCAL $6, LOCAL $1, LOCAL $1, LOCAL $ QUIVIRA ROAD, 151ST STREET TO 159TH STREET : Reconstruction (Added Capacity) 1 Reconstruction of Quivira Road from a two-lane unimproved roadway to a twolane divided thoroughfare with curb and gutter, turn lanes, storm sewers, ADA compliant sidewalks and bike/hike trail, street lighting, and traffic signals. $9, $9, TIP #: N Juris: OVERLAND PARK #: STP-N065(901) County: JOHNSON LOCAL $11, STPM-KS $4, LOCAL $3, LOCAL $2, LOCAL $1, QUIVIRA ROAD, 159TH STREET TO 179TH STREET : Reconstruction (Added Capacity) 2 Reconstruction of Quivira Road from a two-lane unimproved roadway to a twolane divided thoroughfare with curb and gutter, turn lanes, storm sewers, ADA compliant sidewalks and bike/hike trail, street lighting, and traffic signals. $4, $17, $22, TIP #: Juris: OVERLAND PARK #: $ $ County: JOHNSON TA-KS $ LOCAL $ $ BICYCLE MASTER PLAN IMPLEMENTATION : Pedestrian and/or Bikeways This project will focus on the creation of on-street bike lanes (4 to 5 ft width) and bike routes (with shared lane markings or sharrows). Striping and bike markings will be added to a variety of streets (residentials, collectors and thoroughfares) after they have been resurfaced on streets located south of I The bike lanes will utilize existing width in the street and not require any additional widening efforts. TIP #: N Juris: OVERLAND PARK #: HSIP-N067(001) County: JOHNSON 137TH STREET AND LAMAR AVENUE ROUNDABOUT : Reconstruction (No Added Capacity) 0 Reconstruct 137th Street and Lamar Avenue intersection to convert from an all-way stop controlled intersections to a single lane roundabout. Thursday, September 07, 12:30 PM Page 22 of 196 Kansas City Metropolitan Region TIP -

23 Kansas TIP #: N Juris: OVERLAND PARK #: HSIP-N066(401) County: JOHNSON 159TH STREET, PFLUMM ROAD TO QUIVIRA ROAD : Reconstruction (No Added Capacity) 1 Reconstruct 159th Street from an unimproved two-lane roadway to a two-lane roadway with paved shoulders and improved roadside geometry. This project will also include construction of a single lane roundabout at the intersection of 159th Street and Pflumm Road, replacing the existing all-way stop controlled intersection. TIP #: N Juris: ROELAND PARK #: STP-N063(001) $0.00 $0.00 TIP #: N Juris: ROELAND PARK #: STP-N066(101) $4, $3, County: JOHNSON LOCAL $0.00 STPM-KS $0.00 County: JOHNSON $0.00 STPM-KS $4, LOCAL $2, LOCAL $1, $8, INTERSECTION IMPROVEMENTS AT 48TH ST. AND ROE AVE. : Traffic Flow 0.1 To install and construct the improvements recommended in the 2009 Safety Audit for the Intersection of Roe Avenue and 48th Street to enhance safety measures. The project will address the safety concerns noted in the Audit, primarily: Signal mast arms are not parallel to 48th Street.. Narrow receiving lanes may distract drivers. Pedestrian walkways in the islands are narrow. Protected right turn lane may create rear end crashes. PROJECT REMOVED BY SPONSOR REQUEST. FUNDING REALLOCATED TO OTHER PROJECTS. ROE BOULEVARD LIVABILITY IMPROVEMENTS : Reconstruction (No Added Capacity) 1.37 To both accommodate transportation needs and delineate this section of roadway as a place of importance, safety,connectivity, and beautification improvements are proposed. Improvements include removal of unwarranted traffic signals; extension, widening and gap Hlling of sidewalk/bicycle path; streetlight improvements; addressing pavement distress and storm water improvements; tree and planting installation; landscaping at I-35 / Roe interchange. TIP #: N Juris: SHAWNEE #: STP-N061(701) County: JOHNSON STPM-KS $1, LOCAL $ SHAWNEE MISSION PARKWAY REHABILITATION; MAURER TO WIDMER : Reconstruction (No Added Capacity) 1.5 This project includes mill and asphalt overlay, shoulder rehabilitation, new pavement markings, updating signs for proper reflectivety, and retrofit street lights with LED lighting. $1, $ $1, Thursday, September 07, 12:30 PM Page 23 of 196 Kansas City Metropolitan Region TIP -

24 Kansas TIP #: TE Juris: SHAWNEE #: TA-T042(701) $ $ County: JOHNSON TA-KS $ LOCAL $ $ CONNECT SHAWNEE : Pedestrian and/or Bike Ways Includes three projects to implement infrastructure, reduce barriers, and provide convenient and cost-effective transportation options to schools, commercial, residential and retail areas for residents. Project 1 consists of 295 ft. of a 10 ft. wide concrete multi-purpose trail connecting to Silverheel St. Project 2 consists of 650 ft. of a 10 ft. wide concrete multi-purpose trail and a 95 ft. free-span bridge over Clear Creek and one low-water crossing over a second tributary. Project 3 consists of 60 ft. of a 10 ft. concrete multi-purpose trail, and a 30 ft. free-span bridge over an existing concrete channel. NA TIP #: TE Juris: SHAWNEE #: TE-T042(601) $ $50.00 County: JOHNSON TA-KS $ LOCAL $50.00 $ NIEMAN ROAD - REALLOCATION OF RIGHT OF WAY : Pedestrian and/or Bike Ways 1 Project is an implementation phase of the Nieman Road study completed through Planning Sustainable Places. The project consists of preliminary design work for improved multimodal use of the right-of-way to accommodate pedestrians, bicycles, transit, utilities and landscaping while connecting the surrounding neighborhoods. Having the corridor designed in greater detail will significantly advance the timeline and success of this project. TIP #: KA Juris: KDOT #: County: LEAVENWORTH STATE-KS $ LOCAL $ LOCAL $44.00 LEAVENWORTH: INTERSECTION OF US-73 AND POPLAR STREET : Reconstruction (No Added Capacity).1 Widening, addition of turn lanes and striping, installation of sidewalks and associated ADA ramps. $1, $1, TIP #: KA Juris: KDOT #: BRIDGE #022 ON K-32 IN LEAVENWORTH COUNTY County: LEAVENWORTH : Bridge Replacement (No Added Capacity) Bridge replacement. STATE-KS $4, STATE-KS $ STATE-KS $ STATE-KS $ $4, $4, Thursday, September 07, 12:30 PM Page 24 of 196 Kansas City Metropolitan Region TIP -

25 Kansas TIP #: KA Juris: KDOT #: $ TIP #: KA Juris: KDOT #: County: LEAVENWORTH STATE-KS $ $ County: LEAVENWORTH STATE-KS $ LOCAL $ STATE-KS $ STATE-KS $46.80 STATE-KS $42.50 LOCAL $18.00 LOCAL $8.30 LOCAL $7.50 CENTENNIAL BRIDGE ON K-92 IN LEAVENWORTH COUNTY : Bridge Replacement (No Added Capacity) US-73/MARION STREET INTERSECTION : Signalization & Computerization (Roadway) 0 PE ONLY - This project will be an Advance Preliminary (APE) study on this section of K-92 over the Missouri River. The Project Team will evaluate the project area to develop and prioritize highway improvements on this section of K-92. This project will include Public Involvement..1 Intersection modification with signalization- project will address pedestrian users by way of updating ramps to ADA and installing pedestrian signal heads. $ $ TIP #: U Juris: LANSING #: HPD-U211(301) $2, $4, County: LEAVENWORTH LOCAL $4, HP-KS $2, HSIP-KS $ $6, DESOTO ROAD FROM IDA STREET TO EISENHOWER ROAD : (Safety) 2 Widen DeSoto Road from two lanes to three lanes, install sidewalk on both sides of the road, install curb and gutter, flatten shoulder slopes, provide appropriate signage, and replace or partially replace existing traffic signal at intersection of Desoto Road and Eisenhower Road. Also includes box culvert stream crossings, storm sewers, and retaining walls. TIP #: Conversion Juris: LEAVENWORTH #: County: LEAVENWORTH LOCAL (AC) $ TA-KS $ TA-KS $ LOCAL $ CREDIT ($330.00) RFCC STONE RESTORATION : (Environmental, Scenic, Historic) Removal and replacement of all remaining deteriorated structural sandstone components on the exterior of the Historic Union Depot (known locally as the Riverfront Community Center or RFCC) with new sandstone components. The extent of the replacement shall include all exterior cut sandstone elements including corner quoins, gable stones, tooled window sills, belt courses, coves, and finials. $ $ $ Thursday, September 07, 12:30 PM Page 25 of 196 Kansas City Metropolitan Region TIP -

26 Kansas TIP #: C Juris: LEAVENWORTH COUNTY #: STP-C461(101) $ $ REPLACEMENT OF COUNTY BRIDGE E-20 County: LEAVENWORTH STPM-KS $ LOCAL $ $ : Bridge Replacement (No Added Capacity) 0.1 Replacement of an existing bridge structure located over Dawson Creek along a local road within the Easton Growth Area. Replacement of this bridge will allow local drivers of cars, trucks, and agricultural equipment to continue to effectively traverse Cemetery Road. TIP #: C Juris: LEAVENWORTH COUNTY #: STP-C459(701) $ $ County: LEAVENWORTH LOCAL $ STPM-KS $ $ REPLACEMENT OF COUNTY BRIDGE HP-25 : Bridge Replacement (No Added Capacity) 0.1 Replacement of an existing bridge structure located over a tributary to Little Stranger Creek along a local road in the north central region of Leavenworth County.Replacement of this bridge will allow local drivers of cars, trucks, and agricultural equipment to continue toeffectively traverse High Prairie Road. TIP #: Juris: LEAVENWORTH COUNTY #: REPLACEMENT OF LEAVENWORTH COUNTY BRIDGE A-32 County: LEAVENWORTH LOCAL $1, LOCAL $85.00 LOCAL $30.00 : Bridge Replacement (No Added Capacity).1 Replace existing structurally deficient reinforced concrete deck girder bridge along RS 391 (231st Street) over Walnut Creek. $1, $1, TIP #: KA Conversion Juris: KDOT #: ACSTP-A237(30 County: MIAMI STP-KS $2, STATE-KS (AC) $2, STATE-KS $ STATE-KS $ CREDIT ($2,000.00) K-68: FROM US-169, EAST TO US-69 AT LOUISBURG : Reconstruction (No Added Capacity) 3 Plan Development for a 4-Lane Expressway and various locations with construction improvements. $2, $ $2, Thursday, September 07, 12:30 PM Page 26 of 196 Kansas City Metropolitan Region TIP -

Kansas Division. January 31, 2018

Kansas Division. January 31, 2018 Division January 31, 6111 SW 29 th, Suite 100 Topeka, 66614 (785) 273-2600 (785) 273-2620 (fax) www.fhwa.dot.gov/ksdiv/index.htm Catherine M. Patrick, P.E. State Transportation Engineer Department of Transportation

More information

How to Read the TIP Amendment Project Lis ngs

How to Read the TIP Amendment Project Lis ngs How to Read the TIP Project Lis ngs The project lis ng is a complete list of all projects in the TIP amendment. The state is noted in the heading. Bistate projects are listed first, followed by Kansas,

More information

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry

More information

Appendix D Supportive Transportation Materials

Appendix D Supportive Transportation Materials Appendix D Supportive Transportation Materials D.1. Stakeholder Input and Coordination As noted in Section 1.7 of the main Master Plan document, there have been several opportunities for stakeholders to

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6 Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-04 County: King List of 17-04 Amendment Projects:

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

STUDY REPORT #1 ADDENDUM

STUDY REPORT #1 ADDENDUM STUDY REPORT #1 ADDENDUM 1.0 PURPOSE OF ADDENDUM This document is an addendum to Study Report #1: Sub-System Planning Alternatives. The purpose of this addendum is to bridge the gap between the initial

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Municipal Service Park 3 December Consolidation of City services to one centralized complex Municipal Service Park 3 December 2010 Consolidation of City services to one centralized complex Overview: Operational Challenges and Opportunities South East Connector impacts Opportunities: The South

More information

DESIGN CRITERIA MEMORANDUM

DESIGN CRITERIA MEMORANDUM State Route 49 Realignment Study DESIGN CRITERIA MEMORANDUM ATTACHMENT G SR 49 Realignment Study STATE ROUTE 49 El Dorado to Coloma El Dorado County, CA DESIGN CRITERIA MEMORANDUM Introduction The El

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana March 2011 Prepared for: URS Corporation 2020 E. First Street, Suite #400 Santa Ana, CA 92705 Tel:

More information

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities - Central Corridor Rail-Volution - Weaving Transit into Existing Communities Management Committee, October 31, 2009 June Improving 11, 2008 mobility Easing congestion Strengthening our communities Twin

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

APPENDIX E TRANSPORTATION

APPENDIX E TRANSPORTATION APPENDIX E TRANSPORTATION 2011 PATRON SURVEYS VISSIM MODEL CALIBRATION AND VALIDATION Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax:

More information

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for Final Report Interstate-680 Bus-on-Shoulder Feasibility Assessment prepared for Metropolitan Transportation Commission & Contra Costa Transportation Authority prepared by HDR in association with Fehr &

More information

Dakota County Transportation CIP Process Requests from cities/townships

Dakota County Transportation CIP Process Requests from cities/townships City of Apple Valley Letter: e-mail w/traffic Engineer City of Apple Valley Engineer coordinating CIP Project County Traffic Staff is in the process of assessing Requests directly with Dakota County Traffic

More information

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21 Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest

More information

Appendix 2. Capital Funding Source Summary Table of Contents

Appendix 2. Capital Funding Source Summary Table of Contents Capital Source Summary Table of Contents 2016 Corporate Services APP 2-3 Mayor and Council APP 2-5 Office of the Chief Administrative Officer APP 2-5 Office of the Chief Operating Officer APP 2-5 Planning

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1 STUDY

More information

The Blue Line Extension

The Blue Line Extension The Blue Line Extension NORTH CAROLINA JOINT TRANSPORTATION OVERSIGHT COMMITTEE Presented by Carolyn Flowers CATS Chief Executive Officer Raleigh, NC February 10, 2012 Overview Charlotte Area Transit System

More information

INDUSTRIAL LAND FOR SALE

INDUSTRIAL LAND FOR SALE INDUSTRIAL LAND FOR SALE INDUSTRIAL LAND & DEVELOPMENT OPPORTUNITIES 150 ACRE INDUSTRIAL BUSINESS PARK LOTS RANGING FROM 5 150 ACRES Property Features Nexus at DIA provides a compelling opportunity for

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE 2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE Texas Transportation Commission June 26, 2014 Proposed amendments under consideration Funding-level adjustments Project list updates Projects under consideration

More information

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35.

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35. IMPERIAL ROAD DESIGN MANUAL REVISIONS January, 2015 CHAPTER 2A Page 2A-1 Revised the following language at the end of the paragraph under PRELIMINARY ENGINEERING AUTHORIZATION from; Funding Allocation/Verification/Submittal

More information

2017 STP PROJECT APPLICATION (OREGON)

2017 STP PROJECT APPLICATION (OREGON) Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project

More information

Downtown Boise Multimodal Center

Downtown Boise Multimodal Center Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department

More information

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 INTRODUCTION The City of Moorhead (City), along with the Fargo-Moorhead Metropolitan Council of Governments (FM

More information

St. Helena Island 5-6 December,

St. Helena Island 5-6 December, 5-6 December, 2011 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette Report 2011 Opticos Design, Inc. 154 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

Traffic Impact Analysis Shotwell Road Residential Clayton, NC Shotwell Road Residential Clayton, NC TABLE O CONTENTS 1. INTROUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3. Adjacent Land Uses...2 1.4. Existing Roadways...2

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION itization Project itization Rank Name Score 1 Transportation Plan Update 64.85 2 Signal Timing Optimization 54.15 3 Intelligent Transportation System (ITS)

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

NCTCOG MTP Policy Bundle Application for TXDOT

NCTCOG MTP Policy Bundle Application for TXDOT MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.

More information

Metropolitan Council Transportation Committee. September 12, 2016

Metropolitan Council Transportation Committee. September 12, 2016 Metropolitan Council Welcome Commissioner Ulrich SCALE and Collective Impact in Scott County - Mayor Williams Regional Priority Corridors Highways Transit Moving Forward SCALE Scott County Association

More information

Context Sensitive Case Study: Grand Avenue Bridge

Context Sensitive Case Study: Grand Avenue Bridge Context Sensitive Case Study: Grand Avenue Bridge MODERATOR: Craig Gaskill, TSH Engineering Joe Elsen, Colorado Department of Transportation - DOT Perspective / Client Brian Pettet, Pitkin County - Pitkin

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

2014 BOND PROGRAM UPDATE

2014 BOND PROGRAM UPDATE 2014 BOND PROGRAM UPDATE Presented to the City Council By the City Manager s Office August 11, 2015 1 Topics Previous Debt Programs 2014 Bond Program o Goals o Funding Commitments o Progress Communication

More information

The Maryland Transit Administration. A Plan to Connect Baltimore

The Maryland Transit Administration. A Plan to Connect Baltimore The Maryland Transit Administration A Plan to Connect Baltimore 1 What We ve Heard Over 1,100 stakeholder comments submitted through the Bus Network Improvement Project (BNIP) Six workshops, three pop-up

More information

2018 State and Federal Legislative Program

2018 State and Federal Legislative Program 2018 State and Federal Legislative Program STATE TRANSPORTATION FUNDING The passage of HB 2313 (2013) was the result of bipartisan cooperation throughout the Commonwealth. The regional funding provided

More information

Hennepin Avenue Downtown

Hennepin Avenue Downtown Hennepin Avenue Downtown Construction Kick-off Meeting Stakeholders, Owners, Managers January 14 & 17, 2019 Agenda Summary Background Principles Scope, Schedule, Budget Construction Utilities Roadway What

More information

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT Principal Investigator Tom Maze Principal Contributor Ali Kamyab Sponsored by the Engineering

More information

LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY

LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY L-DC REGIONAL ITS ARCHITECTURE AND STRATEGIC DEPLOYMENT PLAN EXECUTIVE SUMMARY The Lawrence-Douglas County Metropolitan Planning Organization (L- DC MPO) has

More information

2017 ANNUAL REPORT

2017 ANNUAL REPORT INFRASTRUCTURE UPGRADES ECONOMIC DEVELOPMENT PUBLIC SAFETY IMPROVED APPEARANCE 2017 ANNUAL REPORT www.stonemountaincid.com Stone Mountain Community Improvement District BOARD OF DIRECTORS Chairman Joe

More information

Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones

Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones Presentation to the Texas Transportation Commission August 27, 2014 Presenters Mike Cantrell Commissioner, Dallas

More information

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Provo-Orem Bus Rapid Transit

Provo-Orem Bus Rapid Transit Provo-Orem Bus Rapid Transit and Timpanogos Maintenance Facility Expansion Procurements Informational Meeting August 18, 2014 Agenda Topic Presenter Time Introduction of key project personnel Project history

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

APPENDIX E. Expenditures by Department

APPENDIX E. Expenditures by Department APPENDIX E Expenditures by Department 199 AIRPORT 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal

More information

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT: BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design

More information

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017 Summary 11/9/217 Jefferson PF Site is located in a Priority Funding Area Y/N Y Y Y Y Y Y Y Buildable Area Size & Quality 1 2.% Existing Site Features Roadways/Traffic 1 2.% Vehicular Access & Sight Distance

More information

Bus Circulator Feasibility Study Scope of Work March 12, 2018

Bus Circulator Feasibility Study Scope of Work March 12, 2018 The City of Hyattsville Comprehensive Transportation and Infrastructure Study Bus Circulator Feasibility Study Scope of Work March 12, 2018 Project Approach At the request of the City of Hyattsville, Toole

More information

Station Location Feasibility Study

Station Location Feasibility Study Station Location Feasibility Study Gateway Cities Gateway Cities Service Council Meeting May 11, 2017 Gateway Cities Service Council Meeting May 11, 2017 1 Meeting Purpose Introduce and present the Metrolink

More information

S-03-SegB: South Federal Way to Fife LRT

S-03-SegB: South Federal Way to Fife LRT Project Number S-03-SegB Subarea South King/Pierce Primary Mode Light Rail Facility Type Corridor Length 4.0 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

Traffic Impact Analysis

Traffic Impact Analysis LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices Appendix I Traffic Impact Analysis September 2015 LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices This page intentionally left blank.

More information

Des Moines Area Regional Transit Non Rider Survey

Des Moines Area Regional Transit Non Rider Survey Moines Area Regional Transit Non Rider Survey helping organizations make better decisions since 1982 Findings Report Submitted to the Moines Area Regional Transit Authority by: ETC Institute 725 W. Frontier

More information

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012 PUBLIC REALM Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012 PUBLIC REALM INSPIRATION Louis Kahn s design for the Four Freedoms Park is a powerful triangular form stretching into

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

APPENDIX F. Expenditures by Year

APPENDIX F. Expenditures by Year APPENDIX F Expenditures by Year 209 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal 90% 2,700,000 3,000,000

More information

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009 North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor

More information

Cornerstone of downtown; Gateway to the state

Cornerstone of downtown; Gateway to the state Paving the information highway Building public trust through reliable communications Brian Manthey Communications Officer Marquette Interchange Team Wisconsin Department of Transportation September 12,

More information

PLANNING COMMISSION WORK SESSION

PLANNING COMMISSION WORK SESSION DEPARTMENT OF BUILDING AND DEVELOPMENT Date of Meeting: STAFF REPORT PLANNING COMMISSION WORK SESSION SUBJECT: ELECTION DISTRICT: FIDP-2016-0002, Ashburn Station North Broad Run CRITICAL ACTION DATE: STAFF

More information

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic

More information

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY Chapter 15: Safety and Security A. INTRODUCTION This chapter discusses safety and security as they relate to the Proposed Project and summarizes how potential safety and security issues are identified

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

Corridor Management Committee. January 14, 2016

Corridor Management Committee. January 14, 2016 Corridor Management Committee January 14, 2016 1 Today s Topics 2 Regional METRO System Overview 2016 Project Overview: Key Activities and Milestones Municipal Consent Schedule Design Resolution Schedule

More information

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING Project Background Description of the Project Alternatives Analysis Process Project Progress Activity Stations Comments Adjourn 2 VIA spent 2 years

More information

APPENDIX A TDM Development Guideline

APPENDIX A TDM Development Guideline Appendix A: TDM Development Guideline APPENDIX A TDM Development Guideline Appendix A: TDM Development Guideline Page A.1 1 INTRODUCTION AND OVERVIEW 1.1 About This Guideline This guideline contains information

More information

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan November 18 Concept Framework Plan Westbard Concept Framework Plan Presentation Workshop Wrap up November 18, 2014 November 18 Concept Framework Plan Workshop Re cap Day 1: visioning session: characteristics

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

STATE STREET CORRIDOR

STATE STREET CORRIDOR CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals

More information

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission GATEWAY Action Plan JULY 2016 1 Gateway Action Plan DRAFT - July 2016 - Portland Development Commission INTRODUCTION: The City of Portland, the Portland Development Commission (PDC), and their many partners

More information

Open house April 26 & 27, 2017

Open house April 26 & 27, 2017 Open house April 26 & 27, 2017 ROAD MAP ENVIRONMENTAL ASSESSMENT Approved by City Council 2012 and Province of Ontario 2013 LA SALLE CAUSEWAY Traffic Operations Study ACTION PLAN SHOVEL-READY Approved

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: January 18, 2018 # 8 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Traffic Analysis and Safety Study of Waxpool Road

More information

Village of Gowanda 2017/18 Budget. Village of Gowanda: March 28, 2017

Village of Gowanda 2017/18 Budget. Village of Gowanda: March 28, 2017 Village of Gowanda 2017/18 Budget Village of Gowanda: March 28, 2017 Police Department Public Works Department Highlights Projected Outlook Village of Gowanda, March 2017 Organizational Chart 2017-18 Officer

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

Record of Public Comment on Central Corridor SDEIS

Record of Public Comment on Central Corridor SDEIS Executive Summary Page 1 Executive Summary Project Background The Ramsey County Regional Rail Authority (RCRRA) initiated the Central Corridor scoping process in 2001 and conducted the Alternatives Analysis

More information

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual Prepared for Garden State Parkway New Jersey Highway Authority April 2007 Developed by: Rutgers University Intelligent

More information

Pueblo City-County Addressing Standards May 2010

Pueblo City-County Addressing Standards May 2010 Pueblo City-County Addressing Standards May 2010 I. Definitions & Descriptions There can be up to four address types in the various databases within the County. They include situs, building, establishment

More information

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FOR LEASE > OFFICE SPACE Washington Square 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FPO 111 Washington Square > Office Space HENNEPIN AVE PARKING RAMP > Built in 1987, 111 Washington is part of a three

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C TPB R2-2014 July 17, 2013 NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C. 20002 RESOLUTION APPROVING THE 2013 CONSTRAINED LONG RANGE TRANSPORTATION

More information

NCTCOG MTP Policy Bundle Application for Cities

NCTCOG MTP Policy Bundle Application for Cities MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24

More information

Westside Subway Extension of the Metro Purple Line

Westside Subway Extension of the Metro Purple Line metro.net/works Westside Subway Extension of the Metro Purple Line Station Fact Sheet fall 2012 Background Station Overview Work to bring the Metro Purple Line to the Westside is moving forward, with plans

More information