1 Facility Name: Acworth Elementary School Facility No.: 278 Add HVAC to Gym Access Controls Add School Lettering to Building Replace Carpet and Tile in selected Areas IN ASSOCIATION WITH THE FACILITY GROUP Page 1 of 152

2 Facility Name: Acworth Primary Elementary School Facility No.: 0 36 IU Primary School. K-2 Removal of Old Structures IN ASSOCIATION WITH THE FACILITY GROUP Page 2 of 152

3 Facility Name: Acworth Site Middle School Facility No.: 0 New 71 IU Middle School. IN ASSOCIATION WITH THE FACILITY GROUP Page 3 of 152

4 Facility Name: Addison Elementary School Facility No.: 259 Add 1 IU, P.E. Gymnasium with Restrooms Install HVAC in Gym Modify existing PE Gym to accommodate guidance and administration. New PE to be built Access Controls Provide Canopy for Bus Lanes Upgrade locks on Exterior Doors Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 4 of 152

5 Facility Name: Adult Education Center Special School Facility No.: 807 Main Switchgear & Panel Upgrades IN ASSOCIATION WITH THE FACILITY GROUP Page 5 of 152

6 Facility Name: Argyle Elementary School Facility No.: 232 Main Switchgear & Panel Upgrades Painting HVAC Main Gym Access Controls Replace Carpet Scrape Windows in Cafeteria to Remove Anti-Glare Film. Add a Staff Restroom IN ASSOCIATION WITH THE FACILITY GROUP Page 6 of 152

7 Facility Name: Austell Elementary School Facility No.: 276 Provide HVAC in Gym Access Controls Add Surveillance Cameras to the back of the Building. Build an Additional Outdoor Storage Area IN ASSOCIATION WITH THE FACILITY GROUP Page 7 of 152

8 Facility Name: Austell Primary Elementary School Facility No.: 283 New 36 IU Primary School. K-2 IN ASSOCIATION WITH THE FACILITY GROUP Page 8 of 152

9 Facility Name: Awtrey Middle School Facility No.: 407 Main Switchgear & Panel Upgrades Replace HVAC in Office, Media Center, Gym and Theater HVAC for Main Gym Roofing for Sections of Building Re-conditioning/metal roof replacement for covered play area Surveillance Cameras Whiteboards Add window to the interior wall of the front office. Improve Climate Control to Reduce Excessive Humidity in Central Classroom IN ASSOCIATION WITH THE FACILITY GROUP Page 9 of 152

10 Facility Name: Baker Elementary School Facility No.: 256 HVAC in Main Gym Bus Lane Re-paving Parking lot Re-paving Access Controls Provide canopy for front area and bus area Surround School with Fencing and a Gated Entrance IN ASSOCIATION WITH THE FACILITY GROUP Page 10 of 152

11 Facility Name: Barnes Education Center Facility No.: 405 Main Switchgear & Panel Upgrades Replace HVAC system for old school Surveillance Cameras Provide Access Control at Entrances IN ASSOCIATION WITH THE FACILITY GROUP Page 11 of 152

12 Facility Name: Bells Ferry Elementary School Facility No.: 235 Main Switchgear & Panel Upgrades Painting HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Re-conditioning/metal roof replacement for covered play area Access Controls Add Restroom in the Pre Kindergarten Build Canopy over Sidewalk Upgrade Playground Area to Improve Drainage Problems IN ASSOCIATION WITH THE FACILITY GROUP Page 12 of 152

13 Facility Name: Belmont Hills Elementary School Facility No.: 214 Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main gym Replace Water Piping, Plumbing Fixtures, and Hose Bibs Re-conditioning/metal roof replacement for covered play area Access Controls Replace Carpet Plant Sod in the Playground Area Landscape Around Building Replace Cafeteria Tables IN ASSOCIATION WITH THE FACILITY GROUP Page 13 of 152

14 Facility Name: Big Shanty Elementary School Facility No.: 240 Main Switchgear & Panel Upgrades Painting Replace HVAC System for 1988 Addition Replace Water Piping, Plumbing Fixtures, and Hose Bibs Re-conditioning/metal roof replacement for covered play area Access Controls Install Water Fountain in Gym Replace Office Furniture Build Outdoor Storage Unit Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 14 of 152

15 Facility Name: Big Shanty Elementary School Facility No.: 240 IN ASSOCIATION WITH THE FACILITY GROUP Page 15 of 152

16 Facility Name: Birney Elementary School Facility No.: 244 Main Switchgear & Panel Upgrades HVAC Main Gym Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves Re-conditioning/metal roof replacement for covered play area Access Controls Carpet Replacement. Install Lighting at Canopy. IN ASSOCIATION WITH THE FACILITY GROUP Page 16 of 152

17 Facility Name: Blackwell Elementary School Facility No.: 274 HVAC Main Gym Access Controls Plant Sod on Area Leading to Primary Playground Add Handrails at Sidewalks IN ASSOCIATION WITH THE FACILITY GROUP Page 17 of 152

18 Facility Name: Brown Elementary School Facility No.: 221 Main Switchgear & Panel Upgrades HVAC Main Gym Re-conditioning/metal roof replacement for covered play area Access Controls Renovate Administration Offices for Security Grade and Level Playground Area Provide a Blacktop Area for the playground. Add Sidewalk to Parking Lot IN ASSOCIATION WITH THE FACILITY GROUP Page 18 of 152

19 Facility Name: Brumby Elementary School Facility No.: 239 Main Switchgear & Panel Upgrades Replace Carpet Replace HVAC System HVAC Main Gym Replace exterior sanitary sewer piping, cleanouts and associated manholes Access Controls Enclose Open IU's in the Old Building Paint Interior of Building as Needed. IN ASSOCIATION WITH THE FACILITY GROUP Page 19 of 152

20 Facility Name: Bryant Elementary School Facility No.: 266 Main Switchgear & Panel Upgrades HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Access Controls Landscape Driveway Entrance and Front of Building. Correct Drainage Problem on Lower field IN ASSOCIATION WITH THE FACILITY GROUP Page 20 of 152

21 Facility Name: Bullard Elementary School Facility No.: 279 HVAC Main Gym Access Controls IN ASSOCIATION WITH THE FACILITY GROUP Page 21 of 152

22 Facility Name: Campbell High School Facility No.: 517 Add 18 IU's; Band, Choral, Graphic Arts, Culinary Arts, Drafting & Design Technology, Horticulture, Law Enforcement, 11 Typical Classrooms. Main Switchgear & Panel Upgrades Replace or Repair the existing Sports Lighting at the Football field. HVAC Wills Gym Modify existing undersized Band to be Orchestra. Modify the undersized Choral to be Drama. Track Resurfacing/Track & Field upgrades Surveillance Cameras Renovate Selected Portions of the Auditorium Paint Lockers Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 22 of 152

23 Facility Name: Campbell High School Facility No.: 517 IN ASSOCIATION WITH THE FACILITY GROUP Page 23 of 152

24 Facility Name: Campbell Middle School Facility No.: 424 Add 3900 square feet to the administration and Pupil Personnel Services areas to conform with the Ed. Specs. Addition of 12 IU's: 9 Typical classrooms, Drama, Business / Computer, Career Connections. Add 4800 Square feet to the Media Center to conform with the Ed. Specs. HVAC Main Gym Modify the existing administration areas to work with a new administration addition. Modification and Renovation of the Kitchen and Cafeteria and Replacement of Food Service Equipment. Expansion of the Food Service Area Square Footage. Media Center Modifications to accommodate the new Media Center addition. Repave Bus Lane Repave Parking Areas & Drives IN ASSOCIATION WITH THE FACILITY GROUP Page 24 of 152

25 Facility Name: Campbell Middle School Facility No.: 424 Surveillance Cameras Replace Bleachers in the New Gym Upgrade Lighting and Sound Systems in Theater. IN ASSOCIATION WITH THE FACILITY GROUP Page 25 of 152

26 Facility Name: Chalker Elementary School Facility No.: 271 HVAC Main Gym Access Controls Whiteboards Install Hot Water Line to the Front Office IN ASSOCIATION WITH THE FACILITY GROUP Page 26 of 152

27 Facility Name: Cheatham Hill Elementary School Facility No.: 272 HVAC Main Gym Access Controls Fencing around Playground IN ASSOCIATION WITH THE FACILITY GROUP Page 27 of 152

28 Facility Name: Clarkdale Elementary School Facility No.: 236 Main Switchgear & Panel Upgrades Replace HVAC System for Classrooms and Media Center HVAC Main Gym. Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves Replace Exterior Sanitary Sewer Piping, Cleanouts and associated Manholes Roofing for entire Building Re-conditioning/metal roof replacement for covered play area Access Controls Replace Front Sign Admin. Renovation--To include: installation of window and clinic enlargement Replace Restroom Stalls and Doors IN ASSOCIATION WITH THE FACILITY GROUP Page 28 of 152

29 Facility Name: Clarkdale Elementary School Facility No.: 236 IN ASSOCIATION WITH THE FACILITY GROUP Page 29 of 152

30 Facility Name: Clay Elementary School Facility No.: 233 Main Switchgear & Panel Upgrades Painting Replace HVAC System for Classrooms, Media and Cafeteria HVAC Main Gym Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves Re-conditioning/metal roof replacement for covered play area Access Controls Place Intercom Speakers in Playground and Parking Lot Areas Install Sidewalk from Gym Door to Front Walk Replace Cafeteria Blinds Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 30 of 152

31 Facility Name: Clay Elementary School Facility No.: 233 IN ASSOCIATION WITH THE FACILITY GROUP Page 31 of 152

32 Facility Name: Facility No.: Cobb County System Wide As new students and staff with significant physical disabilities move to the Cobb County School District, and as new classes are established in schools which have previously had no students or staff with physical disabilities, modifications to the school facility are frequently needed. Examples include restroom adaptations, adding hot and cold running water to a classroom, door and thresh-hold modifications, handrails and ramps. Section 504 of the Rehabilitation Act and the Americans with Disabilities Act require such modifications to permit physical access. Growth and attrition will require funding for replacement and new buses/support vehicles for the next five years. Provide computer for every teacher with appropriate content specific software and training. Complete copier/duplicator replacement program and commence refresh program. Includes 236 digital duplicators capable of supporting the needs of local schools and 726 networked copier/printers capable of supporting the printing and copying needs of local schools and central administration. Replace equipment and attached peripheral replacement and/or consolidation. Includes mainframe equipment, storage area network equipment, and Sun server equipment (purchase, installation, and conversion services) School facilities need to be accessible to many people during and after normal hours. Increased Security needs require that staff members be confident that the doors, windows and locks can completely control access to each facility. This program will provide limited access to only authorized personnel, identify any person or groups in the building and when they entered as well as numerous other features not available now. IN ASSOCIATION WITH THE FACILITY GROUP Page 32 of 152

33 Facility Name: Facility No.: Cobb County System Wide Equipment and Software needed for continued improvement in tracking, reporting and control of CCSD Financial Resources. Local school building renovations and replacement of large kitchen equipment including, but not limited to, walk-in coolers and freezers, ice machines, steam kettles, steamers and serving lines. Building renovations, replacement, repair and upgrades to furniture, fixtures and equipment for the Comprehensive Human Resources Information System (CHRIS). Associated costs for SPLOST Program Management and equipment installation SPLOST Accountability Manager Director of Construction and Support Personnel Equipment Planning and Installation Personnel Financial Reporting/Processing Personnel Furniture/Equipment to Support Program Replace carpet and repaint, replace blinds, insulation where removed in the ceiling, repair siding, roofing, windows, paneling, doors, ceilings, floor structure, gutters and downspouts. Expand mobile computing access campus wide to support instructional and administrative initiatives. Includes 500 access points for centralized District facilities, 2,400 access points for instructional and admin areas, 200 outdoor routers/access to portables, and 600 portable outdoor routers. Provide support of computer printing needs of curriculum and administrative functions. Purchase of approximately 3,170 printers at $2,200 each, would provide one printing device per 25 students and staff. Refresh district servers using a 5-year refresh cycle. IN ASSOCIATION WITH THE FACILITY GROUP Page 33 of 152

34 Facility Name: Facility No.: Cobb County System Wide Includes 6 centralized servers, 100 Internet caching, 100 Mail servers for local schools, 100 Media Center servers, and 70 Middle/High school labs. Refresh components of local school core infrastructure, protect servers, and ensure data integrity in case of power loss. Includes 4 caching appliances, content filtering, 68 environmental control units, firewall, load balance/redundancy fail over, 1,500 network closet switches, switches and routers for central facility, 110 UPS for main, 300 UPS for other closets, and virus scanning. Ensure continued student and staff access to instructional learning opportunities, assessment capabilities and Web-based administrative systems using energy efficient technology. Estimated cost for 30,563 units includes installation, 3-year warranty, productivity software, connectivity to network, & enhanced server support as appropriate at time of implementation. Funding to support the furniture and equipment needs resulting from enrollment growth or replacement of items which are beyond economical repair. Security fencing, safety and security related signs, traffic flow indicators etc. The construction of undesignated classrooms / instructional units for unforeseen future growth requirements. Digital surveillance recording equipment at middle schools and high schools. IN ASSOCIATION WITH THE FACILITY GROUP Page 34 of 152

35 Facility Name: Compton Elementary School Facility No.: 241 Main Switchgear & Panel Upgrades Replace HVAC System for main Building and Annex HVAC Main Gym Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves Bus Lane Re-paving Parking Lot Re-paving Re-conditioning/metal roof replacement for covered play area Access Controls Carpet Interior Painting Replace Fencing at New Macland Road. Add Locks to Classroom Doors in New Building IN ASSOCIATION WITH THE FACILITY GROUP Page 35 of 152

36 Facility Name: Compton Elementary School Facility No.: 241 Build Canopy Over Bus Lanes and between Annex and Main Building. Add Restroom to Staff Lounge Install an L-shaped Counter in Front Office Landscaping at the Front of Building. IN ASSOCIATION WITH THE FACILITY GROUP Page 36 of 152

37 Facility Name: Cooper Middle School Facility No.: 426 HVAC Main Gym Surveillance Cameras Air Condition Kitchen IN ASSOCIATION WITH THE FACILITY GROUP Page 37 of 152

38 Facility Name: Daniell Middle School Facility No.: 408 Addition for Administration and Pupil Personnel to conform to the Ed. Specs. Add 5 IU's; 1 - Technology, 3 - Science, 1 - Business. Add 3 Teacher's Team Planning Rooms. Replace gym floor New tile in hallways and existing tiled rooms. Prep and level slabs to receive the VCT. Flooring for the Theatre also, some tile and some may be carpet. HVAC Main Gym Modify the existing administration areas to work with the new administration addition. Re-conditioning/metal roof replacement for covered play area Surveillance Cameras Replace and Extend Canopy toward Theater Entrance IN ASSOCIATION WITH THE FACILITY GROUP Page 38 of 152

39 Facility Name: Daniell Middle School Facility No.: 408 Whiteboards Move Double Lockers and Replace and or Repair Existing Lockers Safety Mats on the Walls Under the Basketball Goals. Restripe Parking Lot Replace Art Tables and Chairs IN ASSOCIATION WITH THE FACILITY GROUP Page 39 of 152

40 Facility Name: Davis Elementary School Facility No.: 255 HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Access Controls Additional Laptop Computer Carts and Computers, and Desktop computers IN ASSOCIATION WITH THE FACILITY GROUP Page 40 of 152

41 Facility Name: Dickerson Middle School Facility No.: 417 Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE. Addition of 4 IU's, typical classrooms. Replace HVAC system Main Building HVAC Main Gym Surveillance Cameras Replace Lockers in the boys and girls Locker Rooms Correct drainage on the Athletic Field Replace the Door Framing and Doors at the Front Entrance and at the Covere Renovate Restroom Floors in the Old Building. Upgrade Lighting and Sound Equipment in the Theater IN ASSOCIATION WITH THE FACILITY GROUP Page 41 of 152

42 Facility Name: Dickerson Middle School Facility No.: 417 IN ASSOCIATION WITH THE FACILITY GROUP Page 42 of 152

43 Facility Name: Dodgen Middle School Facility No.: 414 Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE Addition of 23 IU's; 15 Classrooms ( 3 Typical, 12 Science ) 2 Spec Ed., 2 Business / Computer, Career Connections, Exploratory Tech., Band, and Orchestra ( from the old Kitchen Modification). 22 new construction, 1 from modification Add New Kitchen and Cafeteria Main Switchgear & Panel Upgrades HVAC Main Gym Modify 3 Commons areas to be teacher planning rooms. Modify the existing under sized Choral room to be Drama Classroom and the existing Band room to be Choral Classroom. Modify the existing administration areas to work with the new administration addition. Modify the existing Kitchen to be the Orchestra Classroom. 1 I.U. increase. Modify General Music to be a Special Ed. Classroom. IN ASSOCIATION WITH THE FACILITY GROUP Page 43 of 152

44 Facility Name: Dodgen Middle School Facility No.: 414 Surveillance Cameras Replace Gym Floor Replace HVAC System Enlarge Theater Window in the Sound Room IN ASSOCIATION WITH THE FACILITY GROUP Page 44 of 152

45 Facility Name: Dowell Elementary School Facility No.: 261 HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Access Controls Build Canopy over Bus Lanes Place Security Gates at Entrance Upgrade Cafeteria Sound System Install Hand Dryers to Student Restrooms IN ASSOCIATION WITH THE FACILITY GROUP Page 45 of 152

46 Facility Name: Due West Elementary School Facility No.: 226 Addition for Administration and Pupil Personnel Services Increase size of the cafeteria by 250 SF. 12 C.R.'s; 4 - K, 7 - P, 1 - Computer Classroom. Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main Gym and Portables Add sprinkler system to the existing building to accommodate the new addition. Modify existing admin. to work with the admin. addition. Roofing for sections of building Re-conditioning/metal roof replacement for covered play area Access Controls Level and Grade Playground Area in rear of School IN ASSOCIATION WITH THE FACILITY GROUP Page 46 of 152

47 Facility Name: Due West Elementary School Facility No.: 226 Replace School Sign IN ASSOCIATION WITH THE FACILITY GROUP Page 47 of 152

48 Facility Name: Durham Middle School Facility No.: 423 HVAC Main Gym Surveillance Cameras New Sound System for Cafeteria IN ASSOCIATION WITH THE FACILITY GROUP Page 48 of 152

49 Facility Name: East Cobb Middle School Facility No.: 404 Addition for Administration and Pupil Personnel Services Add 8 IU's; 8 Typical Classrooms Main Switchgear & Panel Upgrades Replace (7) HVAC RTUs, two split systems for Band and Choir rooms HVAC Main Gym Modify the existing administration areas to work with the new admin. addition. Surveillance Cameras Whiteboards Upgrade Clocks Strip and Refinish Gym Floor Refinish Canopy to the Gym IN ASSOCIATION WITH THE FACILITY GROUP Page 49 of 152

50 Facility Name: East Cobb Middle School Facility No.: 404 IN ASSOCIATION WITH THE FACILITY GROUP Page 50 of 152

51 Facility Name: East Side Elementary School Facility No.: 211 Main Switchgear & Panel Upgrades Replace carpet throughout Replace HVAC system for Annex modular bldg. Air conditioning in PE building Re-conditioning/metal roof replacement for covered play area Access Controls Paint School as Needed and Pressure Wash Exterior Repair Fencing Replace Existing Canopy Replace School Sign IN ASSOCIATION WITH THE FACILITY GROUP Page 51 of 152

52 Facility Name: Eastvalley Elementary School Facility No.: 230 Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Roofing for sections of building Access Controls Provide 15 Overhead Projectors. Cover the Blue Paint on the Exterior of Building with a Uniform Gray Golor Landscape the Front of the School. IN ASSOCIATION WITH THE FACILITY GROUP Page 52 of 152

53 Facility Name: Fair Oaks Elementary School Facility No.: 227 Addition of Administrative Suite including: Principal's office, Adminstrative Office, staff toilets, Pupil Personnel spaces. Also renovation of 1,000 SF of existing administrative space. Enlarge the cafeteria area to accommodate the new FTE allowed by the SPLOST I classroom addition of 16 I.U.'s. Addition of 3 I.U.'s lost to modification of the Media Center. Main Switchgear & Panel Upgrades Replace HVAC split systems HVAC Main Gym Modify the existing Admin. to work with new admin. Addition. Increase the size of the Media Center to accommodate the increased FTE allowed by the previous classroom addition. Loss of 3 I.U.'s. Re-conditioning/metal roof replacement for covered play area Access Controls IN ASSOCIATION WITH THE FACILITY GROUP Page 53 of 152

54 Facility Name: Fair Oaks Elementary School Facility No.: 227 Paint School as Needed New Marquee Install Hand Dryers in Student Restrooms Put Name of School on the Outside of the Building Install Gym Water Fountain Plant Grass on Playground Areas IN ASSOCIATION WITH THE FACILITY GROUP Page 54 of 152

55 Facility Name: Floyd Middle School Facility No.: 409 Addition to the food service areas to accommodate the increased FTE. 19 IU's; 12 Typical Classrooms, 3 Science, Business/Computer,Career Connections, Intro to Technology, Exploratory Target. Addition of new Media Center to meet the Ed. Specs. and the new FTE,to replace the existing undersized one. Main Switchgear & Panel Upgrades Replace HVAC RTUs in Art room and Theater, add RTUs in Classrooms HVAC Main Gym Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves Modify the existing Media Center spaces to be Administration and Pupil Personnel Services. Modifications to the old Music Spaces, Band and Choral to be Drama and typical classrooms. Roofing for Sections of Building IN ASSOCIATION WITH THE FACILITY GROUP Page 55 of 152

56 Facility Name: Floyd Middle School Facility No.: 409 Surveillance Cameras Reconfigure Parking Lot to Include Bus and Car Areas Install New Lockers in the Halls and Gym Cafeteria Tables Replace and Repair Fencing Provide Canopy Between Science and Main Building IN ASSOCIATION WITH THE FACILITY GROUP Page 56 of 152

57 Facility Name: Ford Elementary School Facility No.: 264 HVAC Main Gym Bus Lane Re-paving Parking Lot Re-paving Access Controls Provide Additional Lighting in Parking Areas IN ASSOCIATION WITH THE FACILITY GROUP Page 57 of 152

58 Facility Name: Frey Elementary School Facility No.: 269 HVAC Main Gym Access Controls Landscaping and Additional Trees Whiteboards Place Acoustical Panels in the Gym IN ASSOCIATION WITH THE FACILITY GROUP Page 58 of 152

59 Facility Name: Garrett Middle School Facility No.: 412 Main Switchgear & Panel Upgrades HVAC Main Gym Surveillance Cameras Enclose Media Center and Add Security Gates Add Covered Walkway Between Eighth Grade and New Wing Replace Theater Seating Theater Renovations Lighting and Sound System IN ASSOCIATION WITH THE FACILITY GROUP Page 59 of 152

60 Facility Name: Garrison Mill Elementary School Facility No.: 251 Replace existing Emergency Generator Connect lights, cooler, freezer, & phone system to emergency generator Upgrade Air Conditioning in Gym and Kitchen Bus lane re-paving Parking lot re-paving Re-conditioning/metal roof replacement for covered play area Access Controls Add callback Buttons to Every Classroom Increase Number of Parking Spaces IN ASSOCIATION WITH THE FACILITY GROUP Page 60 of 152

61 Facility Name: Green Acres Elementary School Facility No.: 270 HVAC Main Gym Access Controls Fix Drainage Droblems in Playground Area Add Fencing Between Street and Portables. Increase Lighting in Parking Area and Back of Building Add Canopy from Entrance to Parking Area Plant trees to Buffer Neighbors IN ASSOCIATION WITH THE FACILITY GROUP Page 61 of 152

62 Facility Name: Griffin Middle School Facility No.: 411 Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs. and to accommodate the new FTE. Addition of new cafeteria and kitchen. Addition of 14 IU's: 12 science classrooms, Orchestra, and Choral. Add Band lost to modification for Drama. Add 9 Classrooms lost to modification to increase existing classroom size. Totat IU's to be constructed is 24. Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main Gym Modify the existing undersized classrooms to be the correct size. Convert each pod from a 4 classroom pod to a 3 classroom pod -- a loss of 9 classrooms. Modify 3 commons areas to be teacher team planning rooms. Modify the existing administration areas to work with the new administration addition. Modify kitchen to be Intro to Technology, Band to be Drama, and Orchestra to be Computer Classroom. Re-conditioning/metal roof replacement for covered play area IN ASSOCIATION WITH THE FACILITY GROUP Page 62 of 152

63 Facility Name: Griffin Middle School Facility No.: 411 Surveillance Cameras Renovate Theater- Electronic Screen, Sound System, Curtains, Carpet Provide Flooring and Network Access to Covered Play Area Add wall to isolate restroom from Media Center Canopy to Bus Lot IN ASSOCIATION WITH THE FACILITY GROUP Page 63 of 152

64 Facility Name: Harmony Leland Elementary School Facility No.: 213 Addition of 10 IU's, 6 Kindergarten, 4 Primary. Six new IU's and four are to replace those lost to modification of existing building for Administration. Main Switchgear & Panel Upgrades HVAC Upgrades HVAC Main Gym Modify the existing building for Administration and Pupil Personnel Services. Four IU's will be lost. Provide fire suppression sprinkler system to the existing building to accommodate the addition of classrooms and administration. Roof Replacement Re-conditioning/metal roof replacement for covered play area Access Controls Replace School Sign IN ASSOCIATION WITH THE FACILITY GROUP Page 64 of 152

65 Facility Name: Harmony Leland Elementary School Facility No.: 213 Landscaping Improvements Drainage Improvements Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 65 of 152

66 Facility Name: Harrison High School Facility No.: 516 Replace Cooling Towers Surveillance Cameras Pave Busport and Upper Parking Lot Renovate Classrooms in 814 Building Resurface Tennis Courts Provide Additional Storage Area Provide Additional Outdoor Lighting. Theater-Remove Arch, add Accoustics, Curtains, Lighting Add Motion Detectors IN ASSOCIATION WITH THE FACILITY GROUP Page 66 of 152

67 Facility Name: Haven Academy: Fitzhugh Lee Center Facility No.: 209 Main Switchgear & Panel Upgrades Bus Lane Re-Paving Parkinig Lot Re-Paving Reroof sections of the building IN ASSOCIATION WITH THE FACILITY GROUP Page 67 of 152

68 Facility Name: Haven Academy: Hawthorne Center Facility No.: 729 Main Switchgear & Panel Upgrades Painting Replace HVAC system Re-conditioning/metal roof replacement for covered play area IN ASSOCIATION WITH THE FACILITY GROUP Page 68 of 152

69 Facility Name: Hayes Elementary School Facility No.: 267 HVAC Main Gym Access Controls Enclose Walkway Between Buildings Paint interior and exterior (As Needed) Replace Restroom Tiles IN ASSOCIATION WITH THE FACILITY GROUP Page 69 of 152

70 Facility Name: Hightower Trail Middle School Facility No.: 421 Addition for Band and Orchestra HVAC Main Gym Modify the existing Orchestra and Choral to accommodate Drama and ensemble practices. Loss of 1 I.U. Surveillance Cameras Replace Theater Lighting Replace 12 Folding Walls with Permanent Landscaping Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 70 of 152

71 Facility Name: Hollydale Elementary School Facility No.: 242 Main Switchgear & Panel Upgrades Paint Entire Building Replace HVAC system for original building HVAC Main Gym Upgrade toilets, urinals, sinks, water coolers, and valves Roofing for front canopy Re-conditioning/metal roof replacement for covered play area Access Controls Classroom Function Door Locks on Needed Interior Doors Install 3 Speed Bumps in Front Parking Area Safety Increase Electrical Outlets in Classrooms Upgrade Intercom IN ASSOCIATION WITH THE FACILITY GROUP Page 71 of 152

72 Facility Name: Hollydale Elementary School Facility No.: 242 Cafeteria Tables IN ASSOCIATION WITH THE FACILITY GROUP Page 72 of 152

73 Facility Name: Keheley Elementary School Facility No.: 254 Air Conditioning for Covered Play Area Access Controls Repair and restripe parking lot. Install hand dryers into each restroom. Place tack strips in the needed hallways throughout the building. IN ASSOCIATION WITH THE FACILITY GROUP Page 73 of 152

74 Facility Name: Kell High School Facility No.: 519 Surveillance Cameras Add six foot galvenized, finished, chain link fence around perimeter. IN ASSOCIATION WITH THE FACILITY GROUP Page 74 of 152

75 Facility Name: Kemp Elementary School Facility No.: 280 Provide airconditioning in the Gym Access Controls Fence Perimeter IN ASSOCIATION WITH THE FACILITY GROUP Page 75 of 152

76 Facility Name: Kennesaw Elementary School Facility No.: 265 HVAC Main Gym Access Controls Enclose Walkway Between Buildings Install Hand Dryers in Student Restrooms Venition Blinds in Classrooms and Library Annex-Classroom Function Locks on Interior Doors IN ASSOCIATION WITH THE FACILITY GROUP Page 76 of 152

77 Facility Name: Kennesaw Mountain High School Facility No.: 518 Surveillance Cameras Repave Road to Practice Field Provide exterior lighting in the parking areas. Landscaping Resurface Track IN ASSOCIATION WITH THE FACILITY GROUP Page 77 of 152

78 Facility Name: Kincaid Elementary School Facility No.: 243 Replace existing Emergency Generator Air Conditioning for PE Building Bus Lane Re-Paving Parking Lot Re-Paving Roofing for sections of building Re-conditioning/metal roof replacement for covered play area Access Controls Gate at Main Entrance Improve Drainage at Playgrounds Sink in Art Room Provide New Marquee IN ASSOCIATION WITH THE FACILITY GROUP Page 78 of 152

79 Facility Name: Kincaid Elementary School Facility No.: 243 IN ASSOCIATION WITH THE FACILITY GROUP Page 79 of 152

80 Facility Name: King Springs Elementary School Facility No.: 224 Main Switchgear & Panel Upgrades HVAC Upgrades HVAC Main Gym Re-conditioning/metal roof replacement for covered play area Access Controls Call Back Buttons Shelving for Front Office IN ASSOCIATION WITH THE FACILITY GROUP Page 80 of 152

81 Facility Name: LaBelle Elementary School Facility No.: 223 Addition for Administration and Pupil Personnel Services Addition of 10 IU's: 6 - K, 4 - P. Main Switchgear & Panel Upgrades Replace HVAC system for main building HVAC Main Gym Modify the existing administration area to work with the new admin. addition. Re-conditioning/metal roof replacement for covered play area Access Controls Additional Security Lighting Enclose Walkways Between Buildings Whiteboards IN ASSOCIATION WITH THE FACILITY GROUP Page 81 of 152

82 Facility Name: LaBelle Elementary School Facility No.: 223 Security Cameras Correct Moisture and Mold Problems IN ASSOCIATION WITH THE FACILITY GROUP Page 82 of 152

83 Facility Name: Lassiter High School Facility No.: 512 Replace existing Emergency Generator Main Switchgear & Panel Upgrades Replace carpet throughout and add carpet to the Choral Room. Replace rubber base in all spaces including the corridors. Replace gym bleachers Replace cooling towers Resurface track. Surveillance Cameras Improve Drainage and Add Sidewalk Repair and Replace Theater Seating IN ASSOCIATION WITH THE FACILITY GROUP Page 83 of 152

84 Facility Name: Lewis Elementary School Facility No.: 252 Add 1 IU, P.E. Gymnasium with restrooms. HVAC Main Gym Modify existing P.E. Gymnasium to accommodate Guidance and Administration. New PE to be built. Bus lane re-paving Parking lot re-paving Access Controls Canopy at Front of School Classroom Function Door Locks for Addition Enclose Breezeway Connecting New Addition and Old Building IN ASSOCIATION WITH THE FACILITY GROUP Page 84 of 152

85 Facility Name: Lindley Middle School Facility No.: 425 Cooling System for Hardwood Gym Surveillance Cameras Add 10 Desktop Computers Accoustical Panels in the Cafeteria Install Exhaust Fans in Adult Toilets Athletic Field Fencing IN ASSOCIATION WITH THE FACILITY GROUP Page 85 of 152

86 Facility Name: Lost Mountain Middle School Facility No.: 420 Addition of 8 IU's.; 3 Science, 3 Special Ed., Band, Intro to Tech. Add 3 rooms for teachers' team planning. HVAC Main Gym Modify Band to be Orchestra and modify Orchestra to be Drama. Surveillance Cameras Add Separate Vehicle Entrance to Parking Lot Replace Sod on Field Improve Lighting on the Theater Stage IN ASSOCIATION WITH THE FACILITY GROUP Page 86 of 152

87 Facility Name: Mableton Elementary School Facility No.: 216 Main Switchgear & Panel Upgrades Gymnasium HVAC Upgrades Add A/C. Parking lot re-paving Replace exterior sanitary sewer piping, cleanouts and associated manholes Access Controls Add Canopy for Bus Loading Area IN ASSOCIATION WITH THE FACILITY GROUP Page 87 of 152

88 Facility Name: Mabry Middle School Facility No.: 416 Addition for Administration Pupil Personnel Services Add a new central cafeteria & kitchen Add 18 IU's, Band, 12 Science, 4 Special Ed., 1 Technology Main Switchgear & Panel Upgrades HVAC Main Gym Modify existing kitchen for classroom space, Technology. Renovate existing commons areas for teacher workrooms Roofing for entire building Replace Skylight, Main hall Surveillance Cameras Canopy from the Bus Lanes to the Front of the Building Replace Shelving in Custodial Areas IN ASSOCIATION WITH THE FACILITY GROUP Page 88 of 152

89 Facility Name: Mabry Middle School Facility No.: 416 Provide Metal Bar for Additional Security at Exterior Doors Refurbish Gym Floor IN ASSOCIATION WITH THE FACILITY GROUP Page 89 of 152

90 Facility Name: McCleskey Middle School Facility No.: 418 HVAC Main Gym Bus Lane Re-Paving Parking Lot Re-Paving Surveillance Cameras Improve Lighting and Sound in Theater IN ASSOCIATION WITH THE FACILITY GROUP Page 90 of 152

91 Facility Name: McEachern High School Facility No.: 501 Main Switchgear & Panel Upgrades Replace exterior sanitary sewer piping, cleanouts and associated manholes Surveillance Cameras Replace Dining/Kitchen Venetian Blinds IN ASSOCIATION WITH THE FACILITY GROUP Page 91 of 152

92 Facility Name: Milford Elementary School Facility No.: 222 Addition for Administration and Pupil Personnel Services Addition of 1 I.U. to replace one lost to tie-in of the new administration area Main Switchgear & Panel Upgrades HVAC Main Gym Upgrade toilets, urinals, sinks, water coolers, and valves Modify the existing admin. area and one classroom area lost to tie-in of new administration area. Provide fire suppression sprinkler system to the existing building to accommodate the administration addition. Replace exterior sanitary sewer piping, cleanouts and associated manholes Re-conditioning/metal roof replacement for covered play area Access Controls IN ASSOCIATION WITH THE FACILITY GROUP Page 92 of 152

93 Facility Name: Milford Elementary School Facility No.: 222 Upgrade Front Entrance Replace Cafeteria Windows IN ASSOCIATION WITH THE FACILITY GROUP Page 93 of 152

94 Facility Name: Mount Bethel Elementary School Facility No.: 249 Replace existing Emergency Generator HVAC Main Gym Roofing for sections of building Access Controls Provide Perimeter Fencing and Lockable Gates Improve Lighting in Front Parking Lot Modify Front Office for Safety and Security Canopy at Bus Parking Area Canopy at Front Walkway IN ASSOCIATION WITH THE FACILITY GROUP Page 94 of 152

95 Facility Name: Mountain View Elementary School Facility No.: 253 HVAC Main Gym Access Controls Resurface/Restripe Parking Lot Paint Interior and Exterior of Building Build a Fence between Playground and Parking Lot Provide Wireless Access Points in the Kindergarten Building Landscape Play Areas Large Interior Window at Front Office Safety IN ASSOCIATION WITH THE FACILITY GROUP Page 95 of 152

96 Facility Name: Murdock Elementary School Facility No.: 245 Addition for Administration and Pupil Personnel Services Addition of 17 IU's: 9 - K, 2 - P, 2 - Art, 2 - Music, 2 - Computer. Main Switchgear & Panel Upgrades HVAC Main Gym Roofing for sections of building Access Controls Canopy over Sidewalk IN ASSOCIATION WITH THE FACILITY GROUP Page 96 of 152

97 Facility Name: Nicholson Elementary School Facility No.: 262 HVAC Main Gym Access Controls Connect Back Exits with Sidewalks Improve Drainage at Front of Building Connect downspouts and Pipe to Existing Drainage System Hand Dryers in Student Restrooms Whiteboards Replace Venetian Blinds IN ASSOCIATION WITH THE FACILITY GROUP Page 97 of 152

98 Facility Name: Nickajack Elementary School Facility No.: 275 HVAC Main Gym Access Controls Improve Landscaping-additional trees etc. IN ASSOCIATION WITH THE FACILITY GROUP Page 98 of 152

99 Facility Name: North Cobb High School Facility No.: 505 Addition for Administration and Guidance to conform to the Ed. Specs. and to accommodate the new FTE. Add 13 IU's; Band, Choral, Orchestra, Home Ec.,Art, and 8 Typical Classrooms. Demolish existing 10 IU modular building and replace with 10 additional IU's. Total construction = 23 IU's. Demolish old annex building to make room for a two story addition. 10,800 SF. Loss of 10 I.U.'s. Main Switchgear & Panel Upgrades Replace or Repair the existing Sports Lighting at the Football field. Replace gym floor Modify the following areas replaced by the new addition: Existing Band and Choral to be Drama and a Black Box Theatre; existing Art to be a classroom, and existing Home Ec. to be Culinary Arts. Modify the existing administration areas to work with the new administration addition. Renovate Horticulture classroom to be used as typical classroom. Roofing for sections of building IN ASSOCIATION WITH THE FACILITY GROUP Page 99 of 152

100 Facility Name: North Cobb High School Facility No.: 505 Surveillance Cameras Replace Baseball Field Lighting Improve Lighting outside the Old Gym and Science Building Repair Lower PE Field IN ASSOCIATION WITH THE FACILITY GROUP Page 100 of 152

101 Facility Name: Facility No.: Northwest Elementary School New 61 IU Elementary School IN ASSOCIATION WITH THE FACILITY GROUP Page 101 of 152

102 Facility Name: Northwest Middle School Facility No.: 428 New 71 IU Middle School. Possible 2- Story Building. IN ASSOCIATION WITH THE FACILITY GROUP Page 102 of 152

103 Facility Name: Norton Park Elementary School Facility No.: 234 Add 3000 square feet for Administration and Pupil Personnel Services. Renovate 1800 square feet of the existing Administration areas. Addition of 10 IU's. 6 Kindergarten, 4 Primary. Main Switchgear & Panel Upgrades install air conditioning in gym Upgrade toilets, urinals, sinks, water coolers, and valves Replace water piping, plumbing fixtures, and outside hose bibs Modify the existing administration area to work with the new administration area. Access Controls Increase Security Lighting Replace Carpet IN ASSOCIATION WITH THE FACILITY GROUP Page 103 of 152

104 Facility Name: Norton Park Elementary School Facility No.: 234 Replace Risers IN ASSOCIATION WITH THE FACILITY GROUP Page 104 of 152

105 Facility Name: Oakwood High School Facility No.: 730 Main Switchgear & Panel Upgrades Surveillance Cameras Replace Gym Floor Improve Lighting in the 100 and 300 Buildings Modify Administrative Area Safety IN ASSOCIATION WITH THE FACILITY GROUP Page 105 of 152

106 Facility Name: Osborne High School Facility No.: 507 Add 18 IU's. Typical Classrooms Provide new Media Center to meet current space requirements to conform to the Ed. Specs.. Main Switchgear & Panel Upgrades Replace or Repair the existing Sports Lighting at the Baseball field. Sports Lighting Football Replace HVAC system for Gym, Cafeteria, and Theater Upgrade toilets, urinals, sinks, water coolers, and valves Modifiy old Media Center to be Administration and Guidance suites to meet current space requirements and to conform to the Ed.Specs. and to accommodate the new FTE. Add 2 Additional Tennis Courts Surveillance Cameras Replace Venetian Blinds IN ASSOCIATION WITH THE FACILITY GROUP Page 106 of 152

107 Facility Name: Osborne High School Facility No.: 507 Upgrade Greenhouse Refinish and Re-Line Gym Floor Replace Stage Curtains Install Sink In Nurse's Office IN ASSOCIATION WITH THE FACILITY GROUP Page 107 of 152

108 Facility Name: Palmer Middle School Facility No.: 427 HVAC Main Gym Surveillance Cameras Build Stairway to Field HVAC Kitchen Improve Acoustics in Cafeteria IN ASSOCIATION WITH THE FACILITY GROUP Page 108 of 152

109 Facility Name: Pebblebrook High School Facility No.: 506 Addition for Administration and Guidance to accommodate the new FTE. Addition to the cafeteria and kitchen to conform to the Ed. Specs and to accommodate the new FTE. 22 IU addition, 2- story. Typical classrooms. Connect to existing new Fine Arts Facility. Addition to the Media Center to accommodate the new FTE. Replace or Repair the existing Sports Lighting at the Baseball field. Sports Lighting - Football Upgrade toilets, urinals, sinks, water coolers, and valves Replace exterior sanitary sewer piping, cleanouts and associated manholes Surveillance Cameras Resurface Student Parking Lot. IN ASSOCIATION WITH THE FACILITY GROUP Page 109 of 152

110 Facility Name: Pebblebrook High School Facility No.: 506 Renovate Weight Training Classrooms IN ASSOCIATION WITH THE FACILITY GROUP Page 110 of 152

111 Facility Name: Pine Mountain Middle School Facility No.: 415 Provide Band, Choral and Orchestra Addition. Main Switchgear & Panel Upgrades Provide A/C for gym Modify the existing Band Room to accommodate Drama with dressing rooms and modify existing Choral room to be 1 classroom. Surveillance Cameras Landscaping Upgrades IN ASSOCIATION WITH THE FACILITY GROUP Page 111 of 152

112 Facility Name: Pitner Elementary School Facility No.: 281 HVAC Main Gym Access Controls IN ASSOCIATION WITH THE FACILITY GROUP Page 112 of 152

113 Facility Name: Pope High School Facility No.: 515 Replace Bleachers in Main Gym Replace cooling towers Resurface Stadium Track Surveillance Cameras Window for Pupil Personnel Office Theater Renovation IN ASSOCIATION WITH THE FACILITY GROUP Page 113 of 152

114 Facility Name: Powder Springs Elementary School Facility No.: 257 HVAC Main Gym Access Controls Canopy at Bus Area Replace Interior Door Locks with Classroom Function Door Locks Additional Lighting in Bus Area Fence Around Play Area in Back Replace Media Center Case Work IN ASSOCIATION WITH THE FACILITY GROUP Page 114 of 152

115 Facility Name: Powers Ferry Elementary School Facility No.: 217 Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main Gym Replace exterior sanitary sewer piping, cleanouts and associated manholes Roofing for sections of building Re-conditioning/metal roof replacement for covered play area Access Controls Canopy for Bus Area Book Cases for Classrooms Sign For Front Of School Add Name Of School To Building IN ASSOCIATION WITH THE FACILITY GROUP Page 115 of 152

116 Facility Name: Powers Ferry Elementary School Facility No.: 217 IN ASSOCIATION WITH THE FACILITY GROUP Page 116 of 152

117 Facility Name: Riverside Elementary School Facility No.: 277 HVAC Main Gym Access Controls Exterior Surveillance Cameras IN ASSOCIATION WITH THE FACILITY GROUP Page 117 of 152

118 Facility Name: Riverside Primary Elementary School Facility No.: IU Primary School. K-2 IN ASSOCIATION WITH THE FACILITY GROUP Page 118 of 152

119 Facility Name: Rocky Mount Elementary School Facility No.: 248 Main Switchgear & Panel Upgrades Air Conditioning for the gym Bus Lane Re-Paving Parking Lot Re-Paving Re-conditioning/metal roof replacement for covered play area Access Controls Install Vision Windows To Interior Doors Place Room Numbers on Doors Additional Parking Spaces Venetian Blinds Place Hand Dryers In Restrooms IN ASSOCIATION WITH THE FACILITY GROUP Page 119 of 152

120 Facility Name: Rocky Mount Elementary School Facility No.: 248 Backstop for Field Whiteboards and Tackboards Add Sink To Teacher Lounge Landscape Grounds IN ASSOCIATION WITH THE FACILITY GROUP Page 120 of 152

121 Facility Name: Russell Elementary School Facility No.: 231 Addition for Administration and Pupil Personnel Services Addition of 22 IU's: 6 - K, 13 - P, 1 - Art, 1 - Music, 1 - Computer. Main Switchgear & Panel Upgrades HVAC Main Gym Upgrade toilets, urinals, sinks, water coolers, and valves Modify the existing administration areas to work with the new administration addition. Bus Lane Re-Paving Parking Lot Re-Paving Re-conditioning/metal roof replacement for covered play area Access Controls Venetian Blinds Casework in Media Center IN ASSOCIATION WITH THE FACILITY GROUP Page 121 of 152

122 Facility Name: Russell Elementary School Facility No.: 231 Canopy at the Bus Area Perimiter Fencing and Gate School Sign Replace Restroom Stalls IN ASSOCIATION WITH THE FACILITY GROUP Page 122 of 152

123 Facility Name: Sanders Elementary School Facility No.: 273 HVAC Main Gym Access Controls Acoustical Treatment for Gym Restripe Parking Area IN ASSOCIATION WITH THE FACILITY GROUP Page 123 of 152

124 Facility Name: Sedalia Park Elementary School Facility No.: 225 Addition of 8 IU's. 1 - K, 7 - P. Add 4 Primary Classrooms lost to modification for Administration. Total IU's constructed will be 12. Air condition the gym and upgrade to multipurpose room Modify existing administration area and 4 classrooms to accommodate Administration and Pupil Personnel Services square feet. Loss of 4 I.U.'s. Modify the existing administration areas to work with the new administration addition. Roofing for sections of building Re-conditioning/metal roof replacement for covered play area Access Controls Improve Security Lighting between Gym and New Addition Additional Staff Parking IN ASSOCIATION WITH THE FACILITY GROUP Page 124 of 152

125 Facility Name: Sedalia Park Elementary School Facility No.: 225 IN ASSOCIATION WITH THE FACILITY GROUP Page 125 of 152

126 Facility Name: Shallowford Falls Elementary School Facility No.: 260 Addition for Administration and Pupil Personnel Services Addition of 21 IU's. : 5 - K, 6 - P, 6 - I, 1 - SE, 1 - Art, 1- Music, 1 - Computer. HVAC Main Gym Reroof Entire Building Access Controls Venetian Blinds Whiteboards Additional Security Window at Front Entrance Upgrade and Repaint Playscapes Canopy at Bus Area IN ASSOCIATION WITH THE FACILITY GROUP Page 126 of 152

127 Facility Name: Shallowford Falls Elementary School Facility No.: 260 IN ASSOCIATION WITH THE FACILITY GROUP Page 127 of 152

128 Facility Name: Simpson Middle School Facility No.: 419 HVAC Main Gym Surveillance Cameras Pave Emergency Access Lane Replace Media Casework IN ASSOCIATION WITH THE FACILITY GROUP Page 128 of 152

129 Facility Name: Skyview Elementary School Facility No.: 228 Main Switchgear & Panel Upgrades Replace HVAC system HVAC Main Gym Upgrade toilets, urinals, sinks, water coolers, and valves Replace exterior sanitary sewer piping, cleanouts and associated manholes Re-conditioning/metal roof replacement for covered play area Access Controls Additional Adult Bathrooms Canopy Front Door to Bus Area Resurface the Lower PE Area and the Four Square Areas. IN ASSOCIATION WITH THE FACILITY GROUP Page 129 of 152

130 Facility Name: Skyview Elementary School Facility No.: 228 IN ASSOCIATION WITH THE FACILITY GROUP Page 130 of 152

131 Facility Name: Smitha Middle School Facility No.: 422 Addition of 8 IU's; 3 Typical CR's, 3 Spec. Ed., Orchestra, Intro to Technology. Add 3 Team Planning Rooms Replace carpet throughout HVAC Main Gym Modify Orchestra to be Drama Classroom. Modify Special Ed. CR's (3), to be Science Classrooms. Remove operable walls from Special Education classrooms add science casework. Roofing for entire building Surveillance Cameras Improve Exterior Security Lighting Renovate Student Restrooms IN ASSOCIATION WITH THE FACILITY GROUP Page 131 of 152

132 Facility Name: Smitha Middle School Facility No.: 422 Canopy at Front of Building IN ASSOCIATION WITH THE FACILITY GROUP Page 132 of 152

133 Facility Name: Sope Creek Elementary School Facility No.: 247 Main Switchgear & Panel Upgrades Make repair and modification and renovation items to the annex building. Access Controls Replace library shelving as needed Whiteboards Extend Canopy in Front of School Canopy at Bus Lanes IN ASSOCIATION WITH THE FACILITY GROUP Page 133 of 152

134 Facility Name: South Cobb High School Facility No.: 503 Main Switchgear & Panel Upgrades Replace or Repair the existing Sports Lighting at the Baseball field. Sports Lighting - Football Replace all HVAC units in Theater, Media Center, offices, and add heat to cafeteria AHUs Upgrade toilets, urinals, sinks, water coolers, and valves Resurface track Surveillance Cameras Improve Lighting and Sound Systems in Theater Repair Elevators IN ASSOCIATION WITH THE FACILITY GROUP Page 134 of 152

135 Facility Name: Sprayberry High School Facility No.: 510 Main Switchgear & Panel Upgrades Replace or Repair the existing Sports Lighting at the Football field. Replace gym bleachers Resurface tennis courts Resurface Track Surveillance Cameras Renovate Existing Science Labs Upgrade Fire Alarm System Improve Outdoor Lighting Replace Stalls and Doors in Student Restrooms IN ASSOCIATION WITH THE FACILITY GROUP Page 135 of 152

136 Facility Name: Still Elementary School Facility No.: 246 Addition for Administration and Pupil Personnel Services Expand the cafeteria to accommodate the additional FTE Addition of 21 IU's: 9 - K, 8 - P, 1 - Art, 1 - Music, 2 - Computer. Replace existing Emergency Generator Main Switchgear & Panel Upgrades Replace kitchen exhaust and make-up air units Provide air conditioning in Gym. Re-conditioning/metal roof replacement for covered play area Access Controls Whiteboards Reconfigure Traffic Pattern Upper Parking Lot Re-Paving IN ASSOCIATION WITH THE FACILITY GROUP Page 136 of 152

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

Multi-Purpose Building

Multi-Purpose Building Multi-Purpose Building Description and Goals Multi-Purpose Rooms should be large enough to accommodate 400-500 students. The main multi-purpose will be acoustically designed primarily for musical performances

More information

Site Level Deficiencies

Site Level Deficiencies Level Deficiencies Walkways do not have shelter from rain. School lacks marquee or marquee in poor condition. Computer room lacks independent AC. School site lacks appropriate lighting. Specialties Other

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX 453.1 Scope: Public educational facilities X X X 453.2 Public schools and Florida colleges general requirements X X X 453.2.1 Owner X X X 453.2.2 Exemption from local requirements X X X 453.3 Code enforcement

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

DEFERRED MAINTENANCE PLAN (DMP) FY

DEFERRED MAINTENANCE PLAN (DMP) FY DEFERRED MAINTENANCE PLAN (DMP) FY 2013-2014 Project Category SCHOOL PROJECT/TRADE BID # SHOP BLDG./ ROOM ESTIMATE/ACTUAL COST CFD % Prioritize Asbestos HAZMAT abatement HAZMAT Boiler room BPE Classroom

More information

Orange County Public Schools

Orange County Public Schools 100 % Design/Construction Update Community Meeting May 23, 2016 Meeting Agenda May 23, 2016 Introductions Welcome School Board Member Kathleen Kat Butler Gordon Project Update Facilities Meeting Organizer

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

Orange County Public Schools

Orange County Public Schools Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1 Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect:

More information

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION CAPITAL OUTLAY FUND PROPOSED 2017-2018 2016-2017 ACCOUNT BUDGET BUDGET COMMENTS CODE DESCRIPTION REVENUE 4.4110.000.000 County Appropriation - Initial 2,827,745 882,525 4.4110.000.000 County Appropriation

More information

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services Report to the Board TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent Steve Dickinson, Assistant Superintendent Administrative Services 2016-2017 Routine Restricted Maintenance

More information

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018 Watertown Elementary Schools Building Project DesignWatertown WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018 Schools Project Website: www.watertownschoolsproject.com

More information

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25 UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY2015-16 ---> FY204-25 *Lifecycles were estimated using industry standards. Some items may not need attention

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

Administration. Space Types WELLNESS CENTER WELCOME CENTER CONFERENCE OUTDOOR RECEPTION RECEPTION SECURED PERIMETER. Description and Goals

Administration. Space Types WELLNESS CENTER WELCOME CENTER CONFERENCE OUTDOOR RECEPTION RECEPTION SECURED PERIMETER. Description and Goals Administration Description and Goals he administrative office suite will oversee and coordinate all activities at the school. he public reception and welcome center should be near the drop-off and guest

More information

DESIGN GUIDELINES NOTES: MECHANICAL/ PLUMBING/ELECTRICAL/COMMUNICATIONS

DESIGN GUIDELINES NOTES: MECHANICAL/ PLUMBING/ELECTRICAL/COMMUNICATIONS General Learning Se ngs MECHANICAL PLUMBING ELEC COMM General Learning Settings Neighborhood Learning Studio X X X X X X X X 4 Learning Hub X X X X X X X X X 4, Group Learning/Virtual Learning X X X X

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term

More information

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 Project Tasks Programming Interviews Fairbank Community Center Feasibility Study Recreation, Senior Center,

More information

4/7/2016 ROCKINGHAM COUNTY SCHOOLS CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION

4/7/2016 ROCKINGHAM COUNTY SCHOOLS CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION 4/7/2016 ROCKINGHAM COUNTY SCHOOLS CAPITAL OUTLAY FUND PROPOSED 2016-2017 2015-2016 ACCOUNT BUDGET BUDGET COMMENTS CODE DESCRIPTION REVENUE 4.4110.000.000 County Appropriation - Initial 2,865,604 882,525

More information

North Marion School District Bond Projects

North Marion School District Bond Projects North Marion School District Bond Projects School Board Work Session: 6.4.2018 listen.design.deliver Primary School Update: Safety & security: modify Admin area to create a secure entry vestibule Staff

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

Installation. 9mm. Rear view showing cable header pins

Installation. 9mm. Rear view showing cable header pins Installation Remove the cap that s covering the locking mechanism, this is located on the bottom of the VoiceNav. With the cap removed you now have access to the locking mechanism that secures your VoiceNav

More information

Section I: Submitting a Request

Section I: Submitting a Request UW-Whitewater Work Request Web Interface Section I: Submitting a Request You can access the website at: https://fpmtma.uww.edu:444/home.html Select Submit Request from the menu option on the left side

More information

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 CNM Master Plan Line # Master Plan Project Title Description Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 Projected spending for FY18 Potential Funding Source

More information

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Facilities Report 2011-12 2 nd Quarter KCCD Facilities Planning & Construction February 1, 2012 Overview Facility Report

More information

2017 Capital Improvement Budget Police Department

2017 Capital Improvement Budget Police Department 2017 Capital Improvement Budget Police Department (in thousands) Projects Bonds State Federal Other Total APD Headquarters Campus Perimeter Security Project 500 - - - 500 APD Investigation Interview Room

More information

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FOR LEASE > OFFICE SPACE Washington Square 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FPO 111 Washington Square > Office Space HENNEPIN AVE PARKING RAMP > Built in 1987, 111 Washington is part of a three

More information

TECHNOLOGY SERVICES DIVISION ANNUAL SUMMARY OF RESULTS

TECHNOLOGY SERVICES DIVISION ANNUAL SUMMARY OF RESULTS TECHNOLOGY SERVICES DIVISION ANNUAL SUMMARY OF RESULTS 2005-2006 Technology Services met the goals defined for 2005-2006. Projects are on time and within projected budgets. Major milestones reached include

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

Measure BB Oversight Committee. January 9, 2017

Measure BB Oversight Committee. January 9, 2017 Measure BB Oversight Committee January 9, 2017 Overview Audio Visual project update Technology devices update Capital update Audio Visual Project Update Installation Schedule Month School Rooms Completed

More information

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 River Bend 6 River Bend 11 RIVER BEND CENTER OVERVIEW 7 8 6 1 2 12 highly flexible buildings situated on 40 sprawling acres in the Springdale section

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Replacement of Unit Ventilation System

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M 1 Landscape 1,335 acres, 64 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

SUB-CONTRACTOR PRE-QUALIFICATION FORM

SUB-CONTRACTOR PRE-QUALIFICATION FORM CONTACT INFORMATION Company Contact Person: Title: Street Address: Suite No.: EXPERIENCE City: Zip: 1. Please check the CSI Codes applicable to your business: 02 00 00 Existing Conditions 02 20 00 Assessment

More information

ADDENDA 1/LAST IN RESPONSE TO QUESTIONS

ADDENDA 1/LAST IN RESPONSE TO QUESTIONS ADDENDA 1/LAST IN RESPONSE TO QUESTIONS REGARDING REQUEST FOR PROPOSALS HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) PERVENTATIVE MAINTENANCE AND REPAIR SERVICES Issue Date: December 6, 2018 SCHEDULE

More information

DESIGN GUIDELINES: FINISHES

DESIGN GUIDELINES: FINISHES General Learning Se ngs FLOOR WALL CEILING Min STC 4 Ceiling 9'-0" (270mm) min Ceiling 10'-0" (300mm) min Ceiling 12'-0" (360mm) min General Learning Settings Neighborhood Learning Studio X X X X X X X

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

RETOOL THE SCHOOL 45 TH Anniversary Edition Evangelical Christian Academy

RETOOL THE SCHOOL 45 TH Anniversary Edition Evangelical Christian Academy RETOOL THE SCHOOL 45 TH Anniversary Edition Evangelical Christian Academy The purpose of ECA s Retool the School program is for donors to enable purchases of equipment or supplies on behalf of the elementary,

More information

New Schools Teacher Workstation and Classroom Summary

New Schools Teacher Workstation and Classroom Summary Teacher Workstation and Classroom Summary Workstation: Mobile Device Printer: All Schools, All Classrooms NISD Approved Desktop In HS GT, Journalism and Photography Classrooms, Apple imac Computer is provided

More information

RCMP Capital Improvements

RCMP Capital Improvements Prepared by: D. R. Duckworth, Corporate Services and Community Safety Director Improvements_BUS_1.docx Executive Summary This business case seeks approval for additional funding of $1,000,000 for capital

More information

Heavy Industrial / Corporate Office Campus

Heavy Industrial / Corporate Office Campus Heavy Industrial / Corporate Office Campus -Priced at: $80 Sq.Ft. -131,040 square feet (+/-) -8.8 Acres (+/-) -18 Megawatt Electrical Service -500,000 Gallons per-day Water Service 1270 SE Monmouth Cutoff

More information

Plumbing All plumbing 25 years B_Plumb25

Plumbing All plumbing 25 years B_Plumb25 Assigned Asset Buildings and Building Components Building Structures Reinforced Concrete Buildings 40 years B_Bldg40 Building Structures Outdoor stadiums 40 years B_Bldg40 Building Structures Multilevel

More information

Appendix 2. Capital Funding Source Summary Table of Contents

Appendix 2. Capital Funding Source Summary Table of Contents Capital Source Summary Table of Contents 2016 Corporate Services APP 2-3 Mayor and Council APP 2-5 Office of the Chief Administrative Officer APP 2-5 Office of the Chief Operating Officer APP 2-5 Planning

More information

Creating, Completing, and Utilizing B3 Benchmarking

Creating, Completing, and Utilizing B3 Benchmarking Creating, Completing, and Utilizing B3 Benchmarking CERTs MN GreenCorps member Since you can t manage what you don t measure, begin measuring your energy use with B3 Benchmarking! Introduction to B3 &

More information

KING STREET A SPECTACULAR 287,000-SF CORPORATE HEADQUARTERS OPPORTUNITY FOR SALE OR LEASE ARMONK, NEW YORK

KING STREET A SPECTACULAR 287,000-SF CORPORATE HEADQUARTERS OPPORTUNITY FOR SALE OR LEASE ARMONK, NEW YORK KING STREET ARMONK, NEW YORK A SPECTACULAR 287,000-SF CORPORATE HEADQUARTERS OPPORTUNITY FOR SALE OR LEASE 113King_electronic brochure_layout 1 10/17/13 12:05 PM Page 2 SOUTH BUILDING 113King_electronic

More information

The Asia Pacific Center

The Asia Pacific Center The Asia Pacific Center A modern downtown building serving all of Calgary. Managed and Leased by Bow River Management Ltd. About our Building 100 Fourth Avenue SW Located at a prime corner at 4 th Avenue

More information

2018 Bond Technology Standards

2018 Bond Technology Standards 208 Bond Technology Standards Revised /0/207 Bond 208 - Technology Standards Table of Contents Teacher Workstation and Classroom Summary 2 Staff Workroom and Secondary Coaches Room Summary 3 Elementary

More information

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

City Reso-A Requests FY 2018 (City Council and Borough Presidents) Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation

More information

FACILITIES ADVISORY COMMITTEE SPACE MODIFICATION REQUESTS

FACILITIES ADVISORY COMMITTEE SPACE MODIFICATION REQUESTS FACILITIES ADVISORY COMMITTEE SPACE MODIFICATION REQUESTS FALL 2017 Presented by Harun Biswas December 6, 2017 FACILITIES ADVISORY COMMITTEE ROLE AND ACTIVITIES Purpose: The Committee established in 2010.

More information

50 Years of Facility Operations or Rebuilding from the inside out

50 Years of Facility Operations or Rebuilding from the inside out 50 Years of Facility Operations or Rebuilding from the inside out National Optical Astronomy Observatory (NOAO) NORTH Kitt Peak National Observatory and Tucson Headquarters Facility Presented by John Dunlop

More information

Addressing Classroom and Technology Needs

Addressing Classroom and Technology Needs SPLOST IV Addressing Classroom and Technology Needs SPLOST IV The Plan for bringing g Gwinnett s building needs in check by 2014 and for providing technology to support students instructionallyi SPLOST

More information

Mesquite Jr High School & Gilbert Classical Academy. Campus Integration Plan. Gilbert Public Schools. Final Report 2016

Mesquite Jr High School & Gilbert Classical Academy. Campus Integration Plan. Gilbert Public Schools. Final Report 2016 This is the cover for a 1 ½ binder ; print on 11X17 and crop Final Report 2016 Campus Integration Plan Gilbert Public Schools Mesquite Jr High School & Gilbert Classical Academy CAMPUS INTEGRATION PLAN

More information

FORT ZUMWALT SCHOOL DISTRICT

FORT ZUMWALT SCHOOL DISTRICT FZSD Vendor Registration Category List Page 1 of 5 FORT ZUMWALT SCHOOL DISTRICT PURCHASING DEPARTMENT VENDOR REGISTRATION CATEGORY LIST Date: Company Name: Please mark the appropriate categories below

More information

Educational Lincoln-Sudbury Regional High School

Educational Lincoln-Sudbury Regional High School Educational Technology @ Lincoln-Sudbury Regional High School March 2013 1 N. Errico Educational Technology Coordinator/ Instructional Technology Specialist 1 What do these people have in common? 2 2 What

More information

EXPERIS DATA CENTER Valley Pike, Middletown, VA. Location Map & Aerials. Building Profile & Facts. Floor Plans

EXPERIS DATA CENTER Valley Pike, Middletown, VA. Location Map & Aerials. Building Profile & Facts. Floor Plans Building Profile & Facts 1 Location Map & Aerials 4 Floor Plans 5 BUILDING PROFILE & FACTS SHEET 1 Property Name Address Tax Map & Parcel Number Land Area Building Size Experis Data Centers, LLC 8209 Valley

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Preliminary Camera Survey August 2016

Preliminary Camera Survey August 2016 Preliminary Camera Survey August 2016 Building / Room Device Function Audio Record Notes Building 2 Clarke Seating Area CCTV Wired Camera Operational Support Clarke Theater Stage CCTV Wired Camera Operational

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017 Summary 11/9/217 Jefferson PF Site is located in a Priority Funding Area Y/N Y Y Y Y Y Y Y Buildable Area Size & Quality 1 2.% Existing Site Features Roadways/Traffic 1 2.% Vehicular Access & Sight Distance

More information

Tier IV Standards as Specified in the TIA 942 Document

Tier IV Standards as Specified in the TIA 942 Document S No Architectural Proximity of visitor parking to data 18.3 m / 60 ft minimum separation with physical barriers to prevent vehicles from 1 center perimeter building walls driving closer 2 Building Construction

More information

2009 Capital Projects Fund Assumptions November 3, 2008

2009 Capital Projects Fund Assumptions November 3, 2008 2009 Capital Projects Fund Assumptions November 3, 2008 Revenue Assumptions: Assumes that our maximum levy will stay the same in spite of a 20% decrease in AV Maximum rate of 0.3410 (maintains same levy

More information

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 . Lessons Learned - SMUD s East Campus Operations Center Jim Parks 7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 Powering forward. Together.

More information

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility. High Tech Cleanroom Laboratory & Production Facility www.technologyincubationcenter.com Jay Chmieleski 612 275 3775 mobile Dan Friedner FOR SALE OR LEASE Technology Incubation Center VADNAIS HEIGHTS, MINNESOTA

More information

2010 Capital Projects Fund Assumptions September 21, 2009

2010 Capital Projects Fund Assumptions September 21, 2009 2010 Capital Projects Fund Assumptions September 21, 2009 Revenue Assumptions: Maximum rate has been recalculated at $0.2728, down from $.2857 in 2009 $1,297,874 in additional levy for utilities (same

More information

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay Notes on the Science of Extreme Situations, Paper No. 2 AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA by Anna M. McRay Copyright 2002 by Anna M. McRay. All rights reserved. Permission

More information

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014 154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, 16-20 June 2014 Provisional Agenda Item 5.7 CE154/26 28 April 2014 Original: English MASTER CAPITAL INVESTMENT PLAN Periodic Report on the

More information

BLUE RIBBON Facilities

BLUE RIBBON Facilities BLUE RIBBON 2015 Facilities FACILITY PRIORITIES Police Administration Addition $4,484,864 Relocation of Fire Station 3 $4,829,683 (Does not include land purchase) City Hall Basement/Conference/Training/Emergency

More information

MONTE VILLA FARMS MONTE VILLA PARKWAY BOTHELL, WASHINGTON

MONTE VILLA FARMS MONTE VILLA PARKWAY BOTHELL, WASHINGTON 70,000 94,000 RSF AVAILABLE» High visibility landmark office, assembly and life sciences campus» Convenient freeway access to I-405» Abundant surface parking» High-end Russell s restaurant including catering

More information

C H Group Building Surveyors, BCA 9c and Age Care Certification Consultants

C H Group Building Surveyors, BCA 9c and Age Care Certification Consultants Agenda for Today s Presentation Introduction BCA Classifications BCA 9c Provisions Conversion of Class 3 to 9c Summary Introduction Prior to 1997 RCI Nursing Home funding PCAI Hostel funding Post 1997

More information

Kendall County 5 Yr Capital Requests Department Priority Description Requests Actuals Requests Actuals Requests Actuals 2014, 15, 16 Re

Kendall County 5 Yr Capital Requests Department Priority Description Requests Actuals Requests Actuals Requests Actuals 2014, 15, 16 Re Kendall County 5 Yr Capital Requests 2014 2015 2016 Department Priority Description Requests Actuals Requests Actuals Requests Actuals 2014, 15, 16 Requests 2014, 15, 16 Actuals General Fund - Office Equipment/Furnishings/Software

More information

Computer Network Design Guide Existing Systems 1 / 6

Computer Network Design Guide Existing Systems 1 / 6 COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should

More information

Vantage 70 Frederick s Most Visible Location

Vantage 70 Frederick s Most Visible Location Vantage 70 Frederick s Most Visible Location The Vantage70 Advantage Located at the intersection of Interstates 70 and 270 just minutes from Frederick, MD s historic downtown, Vantage70 is the most visible

More information

WCB Wheeler Rd Hauppauge Room Data Sheets for OGS Project No. 4558

WCB Wheeler Rd Hauppauge Room Data Sheets for OGS Project No. 4558 WCB - 455 Wheeler Rd Room Data Sheets for OGS Project No. Sheet Name Date 1 Summary List 2 Typical Space Requirements (sheet 1 of 2) 3 Typical Space Requirements (sheet 2 of 2) 4 Waiting Area 5 Customer

More information

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina 29847 For Sale or Lease ±421,200 s.f. of Class A industrial space Expandable footprint: up to +1MM s.f. Minimum divisibility:

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY19 Capital Project Request Presentation To The Board of Selectmen, Finance & Fiscal Advisory Committee s Duxbury Senior Center January 8, 2018 Prepared and Maintained

More information

Deployments Teacher Workstation and Classroom Summary

Deployments Teacher Workstation and Classroom Summary Teacher Workstation and Classroom Summary All Schools, All Classrooms Workstation: NISD Approved Desktop In HS GT, Journalism and Photography Classrooms, Apple imac Computer is provided for teacher. Mobile

More information

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT Jack Strollo, Broker 500 S. Florida Avenue, Suite 420 Lakeland, Florida 33801 O. 863.683.3425 x103 C. 863.640.8238 jstrollo@resbroadway.com FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

More information

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FO R LEA SE 100 SIMPLEX DRIVE WESTMINSTER, MA 19,91 SF WORLD-CLASS 6 CLEAR DISTRIBUTION BUILDING Salient details include: Prominent Route visibility Institutional quality asset ensconced on a 95 acre pristine

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL OFFERING SUMMARY Newmark Grubb Knight Frank is pleased to offer 8505 Baycenter to the market for purchase or master lease. This Robert C. Broward

More information

VEHICLE REQUESTS PER FISCAL YEAR

VEHICLE REQUESTS PER FISCAL YEAR 2012-13 Vehicle Description Department Budgeted VEHICLE REQUESTS PER FISCAL YEAR 2013-14 2014-15 2015-16 2016-17 2017-18 Field Vehicle Community Dev.-Planning 17,500 IP Field Vehicle Community Dev.- Inspections

More information

Measure BB Oversight Committee. April 10, 2017

Measure BB Oversight Committee. April 10, 2017 Measure BB Oversight Committee April 10, 2017 Role of committee Audio Visual project update Technology devices update Capital update Role of Committee To review all expenditures to ensure they fall within

More information

Platte County Courthouse Remodel Phase I Project

Platte County Courthouse Remodel Phase I Project Platte County Courthouse Remodel Phase I Project 1 Background The courthouse is in its 100th year of use and is in need of updates and space re-purposing to take us through another 100 years of serving

More information

Programming Document. for: Knight Abbey Program Spring Semester 1 P age

Programming Document. for: Knight Abbey Program Spring Semester 1 P age Programming Document for: Knight Abbey Program Spring Semester 1 P age Administration/ Executive Division Reception Area Function: Serves as the main customer and employee entrance and provides the first

More information

Maintenance Operation & Construction

Maintenance Operation & Construction Maintenance Operation & Construction Carey Upton, Chief Operations Officer Roosevelt Brown, Director of Maintenance & Operations 12/14/2017 Board of Education Meeting FIT Inspections FACILITY INSPECTION

More information

Ehresman Associates, Inc. architects engineers

Ehresman Associates, Inc. architects engineers Architects 803 West Big Beaver, Suite 350 Troy, MI 48084 Wright & Hunter Technology Advisors 818 West 11 Mile Road Royal Oak, MI 48067 Peter Basso Associates Inc Mechanical/Electrical Engineers 5145 Livernois,

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA WAREHOUSE SPACE 198,788 SF ON 95 ACRES As the exclusive listing agent, The Stubblebine Company is pleased to present Route Commerce Park for lease. With robust

More information

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D May 5-6, 2016 Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered

More information

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview Contents 1. Document Purpose... 2 2. Facility Overview... 2 2.1 Technical Space... 2 2.2 Load Density... 2 2.3 Resilience... 2 2.4 Engineering Plant Maintenance & Service Restoration... 3 3. Engineering

More information

School Safety & Security: Priorities for Facilities

School Safety & Security: Priorities for Facilities School Safety & Security: Priorities for Facilities Speakers Brett Hobza, AIA DLR Group Principal/K-12 Sector Leader Phil Wentz Tigard-Tualatin SD Facilities Manager Clem Spenner Willamette ESD Threat

More information

LOUISIANA FLOOD RELIEF INVENTORY. (800)

LOUISIANA FLOOD RELIEF INVENTORY. (800) LOUISIANA FLOOD RELIEF INVENTORY SERIAL # DESCRIPTION RESTROOM 5235A/B 24x68 Doublewide 2 ADA 5237A/B 24x68 Doublewide 2 ADA 5337A/B 24x68 Doublewide 2 ADA 5338A/B 24x68 Doublewide 2 ADA 5339A/B 24x68

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL Procuring broker shall only be entitled to a commission calculated in accordance with the rates approved by our principal only if such procuring

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information